• Title/Summary/Keyword: Estimating procedure

Search Result 404, Processing Time 0.027 seconds

Development of Electrocardiogram Identification Algorithm for a Biometric System (생체 인식 시스템을 위한 심전도 개인인식 알고리즘 개발)

  • Lee, Sang-Joon;Kim, Jin-Kwon;Lee, Young-Bum;Lee, Myoung-Ho
    • Journal of Biomedical Engineering Research
    • /
    • v.31 no.5
    • /
    • pp.365-374
    • /
    • 2010
  • This paper is about the personal identification algorithm using an ECG that has been studied by a few researchers recently. Previously published algorithm can be classified as two methods. One is the method that analyzes ECG features and the other is the morphological analysis of ECG. The main characteristic of proposed algorithm uses together two methods. The algorithm consists of training and testing procedures. In training procedure, the features of all recognition objects' ECG were extracted and the PCA was performed for morphological analysis of ECG. In testing procedure, 6 candidate ECG's were chosen by morphological analysis and then the analysis of features among candidate ECG's was performed for final recognition. We choose 18 ECG files from MIT-BIH Normal Sinus Rhythm Database for estimating algorithm performance. The algorithm extracts 100 heartbeats from each ECG file, and use 40 heartbeats for training and 60 heartbeats for testing. The proposed algorithm shows clearly superior performance in all ECG data, amounting to 90.96% heartbeat recognition rate and 100% ECG recognition rate.

A branch-switching procedure for analysing instability of steel structures subjected to fire

  • Morbioli, Andrea;Tondini, Nicola;Battini, Jean-Marc
    • Structural Engineering and Mechanics
    • /
    • v.67 no.6
    • /
    • pp.629-641
    • /
    • 2018
  • The paper describes the development of a two-dimensional (2D) co-rotational nonlinear beam finite element that includes advanced path-following capabilities for detecting bifurcation instability in elasto-plasticity of steel elements subjected to fire without introducing imperfections. The advantage is twofold: i) no need to assume the magnitude of the imperfections and consequent reduction of the model complexity; ii) the presence of possible critical points is checked at each converged time step based on the actual load and stiffness distribution in the structure that is affected by the temperature field in the elements. In this way, the buckling modes at elevated temperature, that may be different from the ones at ambient temperature, can be properly taken into account. Moreover, an improved displacement predictor for estimating the displacement field allowed significant reduction of the computational cost. A co-rotational framework was exploited for describing the beam kinematic. In order to highlight the potential practical implications of the developed finite element, a parametric analysis was performed to investigate how the beam element compares both with the EN1993-1-2 buckling curve and with experimental tests on axially compressed steel members. Validation against experimental data and numerical outcomes obtained with commercial software is thoroughly described.

Damage-based optimization of large-scale steel structures

  • Kaveh, A.;Kalateh-Ahani, M.;Fahimi-Farzam, M.
    • Earthquakes and Structures
    • /
    • v.7 no.6
    • /
    • pp.1119-1139
    • /
    • 2014
  • A damage-based seismic design procedure for steel frame structures is formulated as an optimization problem, in which minimization of the initial construction cost is treated as the objective of the problem. The performance constraint of the design procedure is to achieve "repairable" damage state for earthquake demands that are less severe than the design ground motions. The Park-Ang damage index is selected as the seismic damage measure for the quantification of structural damage. The charged system search (CSS) algorithm is employed as the optimization algorithm to search the optimum solutions. To improve the time efficiency of the solution algorithm, two simplifying strategies are adopted: first, SDOF idealization of multi-story building structures capable of estimating the actual seismic response in a very short time; second, fitness approximation decreasing the number of fitness function evaluations. The results from a numerical application of the proposed framework for designing a twelve-story 3D steel frame structure demonstrate its efficiency in solving the present optimization problem.

ESTIMATION OF THE SGP4 DRAG TERM FROM TWO OSCULATING ORBIT STATES

  • Lee, Byoung-Sun;Park, Jae-Woo
    • Journal of Astronomy and Space Sciences
    • /
    • v.20 no.1
    • /
    • pp.11-20
    • /
    • 2003
  • A method for estimating the NORAD SGP4 atmospheric drag term from minimum osculating orbit states, i.e., two osculating orbits, is developed. The first osculating orbit state is converted into the NORAD TLE-type mean orbit state by iterative procedure. Then the converted TLE is propagated to the second orbit state using the SGP4 model with the incremental SGP4 drag term. The iterative orbit propagation procedure is finished when the difference of the two osculating semi-major axes between the propagated orbit and the given second orbit is minimized. In order to minimize the effect of the short-term variations of the osculating semi-major axis, the osculating argument of latitude of the second orbit is propagated to the same argument of latitude of the first orbit. The method is applied to the estimation of the NORAD-type TLE for the KOMPSAT-1 spacecraft. The SGP4 drag terms are estimated from both NORAD SGP4 orbit propagation and the numerical orbit propagation results. Variations of the estimated drag terms are analyzed for the KOMPSAT-1 satellite orbit determination results.

A Study on the Application and Design Procedure of Multi-Purpose Wet Detention Ponds for Improving Water Quality - Case Study of NamAk New Town Development Area - (다목적 저류지의 수질개선을 위한 설계과정 및 적용에 관한 연구 - 남악 신도시 개발지를 대상으로 -)

  • Woo, Chang-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.1
    • /
    • pp.97-109
    • /
    • 2004
  • The disposal of stormwater is one of the major problems in urban water management. One method of reducing peak runoff rates and other detrimental impacts of stormwater is detention storage. Detention ponds as a water quality control alternatives have been investigated by a number of researchers. Recognizing multiple roles such as flood peak attenuation, pollution removal and aesthetic enhancement, the design and management of detentions ponds deserve more research. The purpose of this research is to establish design criteria wet detention ponds to improve water quality. Water quality in detention pond discharge might be improve with physical, chemical and biological alterations. Physical alteration was focused in this study. There are several methods for estimating the suspended solid control capability of wet detention ponds. Existing models of suspended solids removal are based on sedimentation and gravity settling theory. The pollutant trap efficiency of pond is a function of several interrelating factors. Detention time is the most important factor, because it determine gravity settling quantities of pollutants. Desirable modification of physical factors for improvement of water quality in wet detention ponds are volume ratio, area ratio, length to width ratio, depth, out let location, bottom soil type. In order to apply design procedure in actual site, Namak new town development area was selected.

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

Growth of the Indigenous Red-tide Phytoplankton Assemblage with the Addition of Limiting Nutrients (제한영양염 첨가에 따른 자생 적조 식물플랑크톤의 증식)

  • Lee, Young-Sik
    • Journal of Environmental Science International
    • /
    • v.15 no.10
    • /
    • pp.961-966
    • /
    • 2006
  • An algal assay procedure using an indigenous phytoplankton assemblage was tested to estimate the propagation of red tide phytoplankton species and determine the optimal time interval at which to measure growth yield in eutrophic marine waters where red tides frequently occur. Various red tide phytoplankton species were propagated on a large scale by adding nitrogen or phosphorous. This procedure was useful for estimating the limiting nutrient, elucidating the mechanisms underlying red tides, and determining the levels of increases in organic matter in eutrophic coastal waters. The algal assay using indigenous C. polykrikoides showed that this species did not always propagate, apparently because of very low concentrations of trigger elements that are necessary for its growth, rather than as a result of other environmental characteristics, e.g., water temperature or stress from sampling. In the winter, when water temperatures are lower than in spring, summer, or autumn, maximum propagation and the limiting nutrient could be estimated by measuring phytoplankton biomass at 2 - 3-day intervals. However, in the other seasons, when water temperatures are higher, phytoplankton biomass should be measured at 2-day intervals. In particular, daily monitoring will be required to determine precise growth yields in warm seasons.

Estimating floor spectra in multiple degree of freedom systems

  • Calvi, Paolo M.;Sullivan, Timothy J.
    • Earthquakes and Structures
    • /
    • v.7 no.1
    • /
    • pp.17-38
    • /
    • 2014
  • As the desire for high performance buildings increases, it is increasingly evident that engineers require reliable methods for the estimation of seismic demands on both structural and non-structural components. To this extent, improved tools for the prediction of floor spectra would assist in the assessment of acceleration sensitive non-structural and secondary components. Recently, a new procedure was successfully developed and tested for the simplified construction of floor spectra, at various levels of elastic damping, atop single-degree-of-freedom structures. This paper extends the methodology to multi-degree-of-freedom (MDOF) supporting systems responding in the elastic range, proposing a simplified modal combination approach for floor spectra over upper storeys and accounting for the limited filtering of the ground motion input that occurs over lower storeys. The procedure is tested numerically by comparing predictions with floor spectra obtained from time-history analyses of RC wall structures of 2- to 20-storeys in height. Results demonstrate that the method performs well for MDOF systems responding in the elastic range. Future research should further develop the approach to permit the prediction of floor spectra in MDOF systems that respond in the inelastic range.

Advanced procedure for estimation of pipeline embedment on soft clay seabed

  • Yu, S.Y.;Choi, H.S.;Park, K.S.;Kim, Y.T.;Kim, D.K.
    • Structural Engineering and Mechanics
    • /
    • v.62 no.4
    • /
    • pp.381-389
    • /
    • 2017
  • In the present study, the advanced procedure has been proposed to estimate higher accuracy of embedment of pipes that are installed on soft clay seabed. Numerical simulation by OrcaFlex simulation code was performed to investigate dynamic seabed embedment, and two steps, i.e., static and dynamic analysis, were adopted. In total, four empirical curves were developed to estimate the seabed embedment including dynamic phenomena, i.e., behaviour of vessel, environmental condition, and behaviour of nonlinear soil. The obtained results were compared with existing methods (named general method) such as design code or guideline to examine the difference of seabed embedment for existing and advance methods. Once this process was carried out for each case, a diagram for estimating seabed embedment was established. The applicability of the proposed method was verified through applied examples with field survey data. This method will be very useful in predicting seabed embedment on soft clay, and the structural behaviours of installed subsea pipelines can be changed by the obtained seabed embedment in association with on-bottom stability, free span, and many others.

A study on the safety improvement and productivity's increase through continuous preventive maintenance. (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • YANG DOOJIN;LEE CHANGHO
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.131-141
    • /
    • 2004
  • This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

  • PDF