• 제목/요약/키워드: Estimating Quantity

검색결과 195건 처리시간 0.027초

수정 아레니우스 모형에서 가족수명시험에 대한 조건부 신뢰구간 (Conditional Confidence Intervals for Accelerated Life Testing in Modified Arrhenius Model)

  • 박병구
    • 품질경영학회지
    • /
    • 제25권3호
    • /
    • pp.1-10
    • /
    • 1997
  • In the context of accelerated life tests, procedures are given for estimating the parameters in the modified Arrhenius model and for estimating mean life at a given future stress level. The conditional confidence intervals are obtained by conditioning on ancillary statistics and pivotal quantity. Using the data of Tobias and Trindada(1986), we illustrate conditional confidence interval for parameters under use condition in the modified Arrhenius model.

  • PDF

BIM 기반 물량산출 자동화를 위한 콘크리트와 거푸집 공사의 사례분석 (The case study of BIM-based quantity take-off for concrete and formwork)

  • 전기현;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제1권1호
    • /
    • pp.13-17
    • /
    • 2011
  • 최근 설계사무소의 단가 및 설계 생산성이 계속 낮아지면서 3차원 설계에 대한 관심이 사회적으로 높아졌다. 설계사무소의 영역을 넘어 건설사회의 설계팀에서 기획설계 및 건설현장의 시공검토용으로 BIM이 활용되기 시작하면서 많은 성공사례가 나오기 시작하였다. 그래서 근래 각광 받고 있는 BIM의 견적 활용성에 대하여 알아보고자 기본적인 콘크리트 량과 거푸집 량을 일반 2D 기반의 방식으로 물량을 산출하고, 3차원 캐드를 통해서도 같은 내용의 물량을 산출하여 BIM 견적의 활용성과 그 정확도를 검토하고 문제점들을 분석하여서 BIM의 효율성을 높이는 방법을 연구한다.

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용 (Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume)

  • 정국영;우정원;강경돈;신재철
    • 한국BIM학회 논문집
    • /
    • 제3권3호
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

반정량 식품섭취빈도조사의 응답에 관한 인지면접연구 (Response Experiences with a Semi-Quantitative Food Frequency Questionnaire : A Qualitative Study using Cognitive Interview)

  • 이경실;이명선;정효지;백희영
    • Journal of Nutrition and Health
    • /
    • 제40권6호
    • /
    • pp.566-575
    • /
    • 2007
  • The purpose of this research was to understand how individuals reflect on the frequency and quantity of foods that they consume. Participants selected 5 males and 15 females aged 30 years or older were first interviewed on the frequency of their food consumption. Then based on this data, they were given a cognitive interview using the method of verbal proving. The individual cognitive interviews were recorded with consent while being conducted after complete approval by the Seoul National University Institution Review Board. The recorded material was evaluated using a thematic analysis after transcribing them into text. By analyzing stages of reflection, the major barriers to make the device difficult are revealed: 1) More difficulty in remembering events over the course of a full year due to diversification in the types of food that people consume 2) difficulty calculating the average for seasonal foods 3) difficulty estimating the amount of consumption from the photos presented 4) difficulty estimating amount of consumption from the quantity presented 5) difficulty processing foods that people think are healthy and foods are unhealthy simultaneously 6) difficulty having to consider foods where target food goes in as an ingredient; 7) difficulties arising from having to increase frequency when the amount consumed is higher than the quantity that is presented 8) difficulty having to combine the frequency and quantity of each food item when numerous foods are clustered into one category. These findings show that the less participants were involved in cooking, the more diverse their eating habits were, and the more they tried to adhere to rules of filling out the questionnaire, the more it was difficult for them to come up with an answer to the question being asked. It therefore seems necessary to construct a Food Frequency questionnaire that is attentive to these problems that arise from the recall stages.

확률론적 응답면 기법을 이용한 저수지 제체의 침투수량 해석 (The Analysis of the Seepage Quantity of Reservoir Embankment using Stochastic Response Surface Method)

  • 봉태호;손영환;노수각;최우석
    • 한국농공학회논문집
    • /
    • 제55권3호
    • /
    • pp.75-84
    • /
    • 2013
  • The seepage quantity analysis of reservoir embankment is very important for assessment of embankment safety. However, the conventional analysis does not consider uncertainty of soil properties. Permeability is known that the coefficient of variation is larger than other soil properties and seepage quantity is highly dependent on the permeability of embankment. Therefore, probabilistic analysis should be carried out for seepage analysis. To designers, however, the probabilistic analysis is not an easy task. In this paper, the method that can be performed probabilistic analysis easily and efficiently through the numerical analysis based commercial program is proposed. Stochastic response surface method is used for approximate the limit state function and when estimating the coefficients, the moving least squares method is applied in order to reduce local error. The probabilistic analysis is performed by LHC-MCS through the response surface. This method was applied to two type (homogeneous, core zone) earth dams and permeability of embankment body and core are considered as random variables. As a result, seepage quantity was predicted effectively by response surface and probabilistic analysis could be successfully implemented.

MDCT 영상으로 측정한 복부지방량의 면적과 체적의 비교 (Comparision of Area and Volumn of Abdominal Fat Quantity Measured by MDCT Image)

  • 고경식;김성수;김현진;김찬중;박종원
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2005년도 추계종합학술대회
    • /
    • pp.1149-1152
    • /
    • 2005
  • This thesis estimates relationships between area and volume of visceral adipose tissue about health risk. Visceral adipose tissue quantity showed the quantitative relationship, where degree of area was similar to the volume.Threrfore, it is more useful to use the area which is simpler,than the volume when using visceral adipose tissue quantity for estimating the degree of danger factors related with fatness.

  • PDF

Integrating Deep Learning with Web-Based Price Analysis to Support Cost Estimation

  • Musa, Musa Ayuba;Akanbi, Temitope
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.253-260
    • /
    • 2022
  • Existing web-based cost databases have proved invaluable for construction cost estimating. These databases have been utilized to compute approximate cost estimates using assembly rates, unit rates, and etc. These web-based databases can be used independently with traditional cost estimation methods (manual methods) or used to support BIM-based cost estimating platforms. However, these databases are rigid, costly, and require a lot of manual inputs to reflect recent trends in prices or prices relative to a construction project's location. To address this gap, this study integrated deep learning techniques with web-based price analysis to develop a database that incorporates a project's location cost estimating standards and current cost trends in generating a cost estimate. The proposed method was tested in a case study project in Lagos, Nigeria. A cost estimate was successfully generated. Comparison of the experimental results with results using current industry standards showed that the proposed method achieved a 98.16% accuracy. The results showed that the proposed method was successful in generating approximate cost estimates irrespective of project's location.

  • PDF

사업기획단계에서의 현수교의 물량추정을 위한 모델연구 (Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage)

  • 박원태;천경식
    • 복합신소재구조학회 논문집
    • /
    • 제6권4호
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

Preparing a Construction Cash Flow Analysis Using Building Information Modeling (BIM) Technology

  • Kim, Hyunjoo;Grobler, Francois
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권1호
    • /
    • pp.1-9
    • /
    • 2013
  • Construction is a competitive industry and successful contractors must be able to win bids to obtain projects. Cash flow analysis not only determines actual profit at the end of the project, but also estimates required cash resources or cash ballances at the end of every month. Cash flow analysis is important in managing a construction project; however, it requires extensive information that is not immediately available to the general contractor. Before contractors can perform cash flow analysis, they must first complete a series of pre-requisites such as the quantity take off, scheduling, and cost estimating, followed by accurate assessments of project costs incurred and billable progress made. Consequently, cash flow analysis is currently a lengthy, uncertain process. This paper suggests improved cash flow analysis can be developed using data extraction in Building Information Modeling (BIM). BIM models contain a wealth of information and tools have been developed to automate a series of process such as quantity takeoff, scheduling, and estimating. This paper describes a prototype tool to support BIM-based, automated cash flow analysis.