• 제목/요약/키워드: Estimated Total Down Time

검색결과 17건 처리시간 0.034초

국외구매 무기체계에 대한 동시조달수리부속 선정 유전자 알고리즘 연구 (A Study on Genetic Algorithm of Concurrent Spare Part Selection for Imported Weapon Systems)

  • 조현기;김우제
    • 대한산업공학회지
    • /
    • 제36권3호
    • /
    • pp.164-175
    • /
    • 2010
  • In this study, we developed a genetic algorithm to find a near optimal solution of concurrent spare parts selection for the operational time period with limited information of weapon systems purchased from overseas. Through the analysis of time profiles related with system operations, we first define the optimization goal which maintains the expected system operating rate under the budget restrictions, and the number of failures and the lead time for each spare part are used to calculate the estimated total down time of the system. The genetic algorithm for CSP selection shows that the objective function minimizes the estimated total down time of systems with satisfying the restrictions. The method provided by this study can be applied to the generalized model of CSP selection for the systems purchased from overseas without provision of their full structure and adequate information.

업무용 빌딩의 피난 성능 검토에 관한 연구 (A Study on the Evacuation Performance Review for the Office Buildings)

  • 오혁진;백승태;김우석;이수경
    • 한국화재소방학회논문지
    • /
    • 제17권3호
    • /
    • pp.1-6
    • /
    • 2003
  • 본 연구에서는 특정의 업무용 건축물에 대해서 화재 및 피난 시나리오를 선정하여 FAST 3.1.7(전실화재 예측), SIMULEX 32-bit(피난시간의 예측), JASMINE 3.25d(특정시간까지의 연기 유동성 평가)등의 S/W를 이용하여 이를 평가했으며 그 결과는 다음과 같다. Scenario #1 결과, 화재실에서 전실화재가 발생하지 않았고, 층 피난시간은 25.2 sec로 나타났으며 이때까지의 FAST 3.1.7결과에서 연기층은 2.4m를 기록, 연기유동성 평가에서도 재실자들은 연기의 피해(가시거리, 독성)없이 피난이 완료될 것으로 나타났다. Scenario #2 결과, 화재실에서 6 min 33.2 sec에 전실화재가 발생했으며, 수계산에 의한 피난시간은 5 min 23sec로 나타났다. 본 대상건물에 대해서 선정한 Scenario #1, #2 모두 인명안전설계는 적정하게 설계되었다고 판단된다.

Design Considerations of Cryogenic Cooling System for High Field Magnets

  • Choi, Yeon-Suk;Kim, Dong-Lak;Lee, Byoung-Seob;Yang, Hyung-Suk;Yoo Jong-Shin;Painter Thomas A.;Miller John R.
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제8권4호
    • /
    • pp.30-33
    • /
    • 2006
  • Several crucial issues are discussed in the design of cryogenic cooling system for high field magnets. This study is mainly motivated by our ongoing program to develop a 21 T Fourier Transform Ion Cyclotron Resonance Mass Spectrometer (FT-ICR MS). The magnets of this system will be built horizontally to accomplish the requirement of user friendliness and reliability, and the replenishment of cryogen will not be necessary by a closed-loop cooling concept. The initial cool-down and safety are basically considered in this paper. The effects of the helium II volume and the gap distance of the weight load relief valve (or safety valve) on the cool-down time and temperature rising during an off-normal state are discussed. The total amount of cryogenic cooling loads and the required helium flow rate during cool-down are also estimated by a relevant heat transfer analysis. The temperatures of cryogen-free radiation shield are finally determined from the refrigeration power of a cryocooler and the total cryogenic loads.

건강보험 급여화 관련 임플란트보철물의 기공원가 분석 연구 (A study on the dental technology and fabrication cost analysis of implant prosthesis for National Health Insurance)

  • 조미향;이광영;이희경;남신은;류재경;권혁문;김경록;조홍규
    • 대한치과기공학회지
    • /
    • 제42권2호
    • /
    • pp.149-162
    • /
    • 2020
  • Purpose: The purpose of this study was to conduct a cost accounting of implant prosthesis according to the fabrication activities. Methods: In this study, the cost price of implant prosthesis fabrication activities was calculated by the bottom-up costing approach for material and labor cost and the top-down costing approach for expenses and other. Results: The total cost price was estimated to 220,000 ~ 310,000 won per one implant prosthesis. By product, the screw type was estimated to 220,000 ~ 230,000 won, and when the stent and tray were included, it was 260,000 ~ 270,000 won, which increased about 40,000 won. And, the cement type with more material and labor time was estimated to 250,000 ~ 260,000 won, and when the stent and tray were included, it was about 300,000 won. Conclusion: In terms of the fabrication cost ratio by items, it was shown that material cost and labor cost accounted for about 40% and 30% of the total cost structure for resin case, respectively, which was the opposite for porcelain. It was shown that expenses and general administrative expenses accounted for about 15%, and profits were about 11% ~ 14% in both cases.

밭 비점오염저감을 위한 잔디초생대 적용 비용 및 활용성 평가 (Estimation of Application Cost and Utilization of Turf Grass VFS for Reduction of Uplands NPS Pollution)

  • 이슬기;장정렬;최경숙
    • 한국농공학회논문집
    • /
    • 제57권2호
    • /
    • pp.75-83
    • /
    • 2015
  • This study was aimed to estimate the total application cost and utilization of Turf grass VFS application through the field experiment. The experimental plots were constructed in an upland field of Iksan city within the Saemangeum watershed. Turf grass was transplanted at the down-slope edge of the pollution source area in each of the treated plots. Three rainfall events were monitored during the experiment period, and the rainfall-runoff relationships and NPS pollution reduction effects of the VFS systems were assessed. As results, the reduction ratio of runoff volume ranged 14.1~64.0 %, while the NPS pollution reduction ratio ranged 9.8~73.9 % for SS, 24.0~84.2 % for T-N, 31.6~80.9 % for T-P respectively. The total cost of VFS application was estimated by considering purchase cost of Turf grass sods and construction and maintenance costs of VFS system as well as the loss caused by giving up crop cultivation for the area needed to construct the VFS. The total cost of the VFS was estimated to be approximately \3,379,000/ha/year for the first year of application, and this cost could be decreased to \1,899,000/ha/year from the second year as the construction cost of VFS could no longer need to be counted afterwards. Apart from the NPS pollution reduction effects, the possible utilization of VFS was examined by detaching Turf grass within 40 % of VFS area for sale during spring time when the VFS systems fully covered. The benefit of selling the detached Turf grass sods was estimated as \1,260,000/ha/year, and also found that the VFS area successfully recovered by the time of the summer period. This benefit could attract farmers to adopt the VFS technique to manage agricultural NPS pollution.

산업연관모형을 이용한 우리나라 산업의 직·간접 물소비 구조 분석 (An Analysis of Water Consumption Structures in Korean Industry Using the Input-Output Model)

  • 박창귀;이기훈
    • 환경정책연구
    • /
    • 제9권2호
    • /
    • pp.21-39
    • /
    • 2010
  • 본 논문에서는 우리나라 산업의 연간 물소비량을 최초로 추정하고 이를 이용하여 물소비 분석용 산업연관 모형을 작성하였다. 그리고 이를 이용하여 산업활동에 따른 직 간접 물소비 유발효과를 분석하였으며 물량기준 총효과를 요인별로 분해하여 보았다. 우리나라 산업(농림어업 제외)은 해수를 제외한 상수도, 지하수, 하천수, 재이용수 등 육지의 물 기준으로 2003년중 약 76억 9,200만 톤의 물을 소비한 것으로 추산되었다. 업종별로는 전력 수도가 49.5%로 거의 절반가량을 차지하였으며 제철 등의 가공금속 산업이 24.3%, 화학산업이 5.0%를 차지하였다. 물소비 분석용 산업연관 모형을 이용하여 산업별 직 간접 물소비 유발계수를 도출한 결과 전력 수도가 산출액 백만원당 113.8톤의 물을 소비하였으며, 제1차금속(49.6톤), 섬유 가죽제품(16.8톤), 일반기계(11.9톤) 등의 순으로 높게 나타났다. 동유발계수를 직접효과와 간접효과로 나누어 본 결과, 전력가스 및 수도 산업을 제외하고는 대부분의 산업에서 직접효과보다는 간접효과가 큰 것으로 나타나 물 관련 정책 수립시 제품간 물소비 연관관계를 충분히 고려할 필요가 있음을 시사하였다. 아울러 동 연구결과는 제품간 물소비구조 파악과 제품별 물소비지표 개발 등에도 활용될 수 있을 것이다.

  • PDF

통계적 회귀계수를 이용한 어선의 유효 마력 추정법에 관한 연구 (A Study on the Estimation Method of EHP of Fishing Boats Use Statistical Regression Analysis)

  • 이근무;박제웅
    • 수산해양기술연구
    • /
    • 제31권2호
    • /
    • pp.199-209
    • /
    • 1995
  • 모형저항시험 자료를 토대로 선형요소들에 대한 통계 회귀계수를 만들고, 이를 이용하여 새로운 어선의 기본설계 단계에서 유효마력을 추정할 수 있는 방법을 정립하였다. 이러한 방법을 Chine Line이 있는 소형 표준어선 4척과 Round Bottom형 표준어선 2척에 적용하여 유효마력을 추정하였으며, 이를 실험값과 비교하였다. 이 6척 어선의 경우 전속도 범위에서 추정치와 실험치가 잘 일치하고 있는 것과 근접한 것으로 나타났다. 그러므로 작성된 수치계산법은 어선의 유효마력추정에 매우 유용하게 쓰일 수 있음이 입증되었다. 따라서 제안된 방법을 어선설계에 적용하면, 직접적으로는 저항성능을 개선할 수 있을 뿐 아니라, 설계공수단축, 원가절감 등에 기여할 수 있을 것이다.

  • PDF

2-Methylpentane 아만성 흡입독성 연구 (A Study on Subchronic Inhalation Toxicity of 2-Methylpentane)

  • 정용현;임철홍;한정희
    • 한국산업보건학회지
    • /
    • 제24권2호
    • /
    • pp.169-181
    • /
    • 2014
  • Objectives: The purpose of this study was to obtain information regarding classification and health hazards that may result from a 13-week inhalation exposure to 2-methylpentane by Sprague-Dawley rats. Materials: The testing method was conducted in accordance with OECD guidelines for the testing of chemicals No. 413. The rats were divided into four groups(ten male and ten female rats in each group) and exposed to 0 ppm, 290 ppm, 1,160 ppm, 4,640 ppm 2-Methylpentane in each exposure chamber for six hours per day, five days per week, for 13 weeks. Results: No death or particular clinical presentation including weight change and change of feed rate was observed. The relationships between dose, gender and response were also not significantly changed in urinalysis, hematologic examination, or biochemical examination of blood(except for total cholesterol being up, total protein being up, and chloride ion being down in males), and blood coagulation time. For the relative weight measurement of organs, in the male group the weight change of both kidney and liver were increased in proportion to dose. In histopathological examination, nephropathy in the kidney(cystic change of renal tubules, regenerative tubule, inflammatory cell infiltration and necrosis in the interstitial tissue) was increased in a dose-dependent manner in the male group(290 ppm, 1,160 ppm, 4,640 ppm). However, other organs were not affected by the test substance. Conclusions: 2-methylpentane was estimated as a chemical causing nephropathy in the male group. NOAEL(No Observable Adverse Effect Level) in the female group is more than 4,640 ppm, while inthe male group it is less than 290 ppm.

전력용 변압기의 열화에 의해 생성된 부산물의 분석 (Analysis of Produced By-products Due to Oil/Paper Degradation on Power Transformers)

  • 김재훈;한상옥
    • 전기학회논문지
    • /
    • 제56권9호
    • /
    • pp.1561-1565
    • /
    • 2007
  • According to thermal degradation on power transformers, it is known that electrical, mechanical and chemical characteristics for power transformer's oil-paper are changed. In the chemical property, especially, when the kraft paper is aged, the cellulose polymer chains break down into shorter lengths. It causes decrease in both tensile strength and degree of polymerization of paper insulation. Also the paper breakdown is accompanied by an increase in the content of various furanic compounds within the dielectric liquid. It is known that furanic components in transformer oil come only from the decomposition of insulating paper rather than from the oil itself. Therefore the analysis of furanic degradation products provides a complementary technique to dissolved gas analysis for monitoring transformers when we evaluate the aging of insulating paper by the total concentration of carbon monoxide and carbon dioxide dissolved in oil only. Recently, the analysis of furanic compounds by high performance liquid chromatography(HPLC) using IEC 61198 method for estimating degradation of paper insulation in power transformers has been used more conveniently for assessment of oil-paper. It is know that the main products which is produced by aging are 2-furfuryl alcohol, 2-furaldehyde(furfural), 2-furoic acid, 2-acetylfuran, 5-methyl-2-furaldehyde, and 5-hydroxymethyl-2-furaldehyde. For investigating the accelerated aging process of oil-paper samples we manufactured accelerating aging equipment and we estimated variation of insulations at $140^{\circ}C$ temp. during 500 hours. Typical transformer proportions of copper, silicon steel and iron have been added to oil-paper insulation during the aging process. The oil-paper insulation samples have been measured at intervals of 100 hours. Finally we have analyzed that 2-furoic acid and 2-acetylfuran products of furanic compounds were detected by HPLC, and their concentrations were increased with accelerated aging time.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2015년도 학술발표회
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF