Most of countries are trying to increase the supply of renewable energy as the substitute of the fossil energy for reducing greenhouse gas emissions. However, renewable energy sources account for only about 3.86% of the total Korea primary energy supply. To increase the rate of renewable energy in Korea's energy consumption, various policies for expanding the use of renewable energy should be applied. Also these policies should be consider renewable energy resources distribution and regional inequality. In this study, the potentials of photovoltaic, wind power and bioenergy from rice straw, livestock waste and food waste are calculated and the distribution characteristic and regional inequalities are analyzed using Gini's coefficient and Gini decomposition method. As the results, technical potentials of photovoltaic and wind power of city region(Gu) has more potential rate than theoretical potentials. Livestock waste has the most unequal distribution (Gini's coefficient: 0.617) among renewable resources.
Industrialization and development of technology satisfied various humanly needs and lay the basis of numerous benefit and profit. New technologies like these mostly required large amounts of fossil Fuel, Fossil energy depletion rate was increasing rapidly. However, technical development for Human race required absolute sacrifice of the environment. Especially, 'City' which had been focused as stage of human activities, allowed to continue to have fossil energy dependent activities, and it shows in many data that the city is responsible for the 75-80% of the green house gas by human. In order to solve the problem relating climate changes and energy, European countries already made progress studies on many of the low carbon green city and pilot case construction. Especially, Germany, Austria, Holland, Sweden who had been playing leader role on environmental awareness and ecological concept, are actively constructing low carbon green city project based on Ecological city planning scheme. These projects positively utilize planning scheme that limits carbon emission using Urban Metabolism concept. Therefore, throughout this study, I would like to present planning and direction of future domestic low carbon green city by analyzing theories relative theories and best practices in Europe.
Carcimoma of the breast are first frequency malignancy in women in the world. third frequency in Korea. Radiation therapy in breast cancer were treated through opposed tangential fields with photon beam or electron beam. Density within the field and thickness to tumor are very importent factors determining dose distribution in radiation therapy of electron beam. Radiotherapy traetment planning using computed tomography in Breast cancer are able to ideal dose distribution. Authors concluded as following. 6MeV energy of electron beam propered below 1.5cm in chest wall's thickness or internal mammary lymphnode's depth. 9MeV energy of electron beam from 1.5cm to 2.0cm. 12 MeV energy of electron beam from 2.0cm to 2.5cm.
This study proposes a new algorithm which performs a production simulation under various constraints and maintains computational efficiency. In order to consider the environmental and operational constraints, the proposed algorithm is based on optimization techniques formulated in LP form In the algorithm, "system characteristic constraints" reflect the system characteristics such as LDC shape, unit loading order and forced outage rate. By using the concept of Energy Invariance Property and two operational rules i.e. Compliance Rule for Emission Constraint, Compliance Rule for Limited Energy of Individual Unit, the number of system characteristic constraints is appreciably reduced. As a solution method of the optimization problem, the author uses Karmarkar's method which performs effectively in solving large scale LP problem. The efficiency of production simulation is meaningful when it is effectively used in power system planning. With the proposed production simulation algorithm, an optimal expansion planning model which can cope with operational constraints, environmental restriction, and various uncertainties is developed. This expansion planning model is applied to the long range planning schemes by WASP, and determines an optimal expansion scheme which considers the effect of supply interruption, load forecasting errors, multistates of unit operation, plural limited energy plants etc.
International conference on construction engineering and project management
/
The 9th International Conference on Construction Engineering and Project Management
/
pp.543-550
/
2022
The U.S. Department of Energy conducts the Solar Decathlon competition as a student-based achievement that encourages sustainable design with energy efficiency and solar energy technologies. In the 2020 competition, the University of Nevada, Las Vegas (UNLV) team designed, fabricated, and constructed a net-zero modular house that applies innovative and highly efficient building technologies. This paper focused on the lessons learned during the early phases of this ongoing modular project. The research methodology included obtaining feedback from key project participants using a well-structured questionnaire. The results showed that the major items/challenges in the project's planning phase included selecting the modular size, planning the construction system, planning the materials and procurement, estimating costs and duration, selecting a fabricator, collaboration and communication, safety, and planning module transportation. These findings will help modular practitioners and future Solar Decathlon competition participants better understand how and what factors they should consider most during the early phases through the lessons learned.
Journal of Institute of Control, Robotics and Systems
/
제17권10호
/
pp.1029-1036
/
2011
An energy-efficient reference walking trajectory generation algorithm is suggested utilizing allowable ZMP (Zero-Moment-Point) region, which maxmizes the energy efficiency for cyclic gaits, based on three-dimensional LIPM (Linear Inverted Pendulum Model) for biped robots. As observed in natural human walking, variable ZMP manipulation is suggested, in which ZMP moves within the allowable region to reduce the joint stress (i.e., rapid acceleration and deceleration of body), and hence to reduce the consumed energy. In addition, opimization of footstep planning is conducted to decide the optimal step-length and body height for a given forward mean velocity to minimize a suitable energy performance - amount of energy required to carry a unit weight a unit distance. In this planning, in order to ensure physically realizable walking trajectory, we also considered geometrical constraints, ZMP stability condition, friction constraint, and yawing moment constraint. Simulations are performed with a 12-DOF 3D biped robot model to verify the effectiveness of the proposed method.
Journal of Korean Society of Industrial and Systems Engineering
/
제12권20호
/
pp.55-61
/
1989
The main contribution this research is the development of methodology which is capable of solving problems associated with the capacity expansion and operating schedule of energy industries. The principal concern of such industries is the proper allocation of primary energy which are required for the production of sufficient supply of electricity and petroleum products for the Korea`s energy needs. Nonlinear programming models are developed for power generation expansion planning and for the oil refinery industry. In order to deal with uncertainties about future demands for final energy, chance-constrained programming is used to formulate appropriate constraints. The methodology of the model can be used to evaluate Korean energy and expansion planning in the energy industry, especially the electric power generation industry and the refinery industry.
Urban architecture density is getting higher, and this trend is expected to continue in the future. Therefore, skyscrapers are being brought into relief as future alternative architecture beyond symbolic meaning in the aspect of demand and supply of urban space. However, skyscrapers which were newly built have many problems such as consumption of enormous amounts of energy, destruction of natural environment, and traffic jam. For this reason, environment-friendly skyscrapers based on the concept such as Green Building and Green Skyscraper started to be built around the world. However, plans or evaluation standards, which take account of the environment-friendly aspect of skyscrapers, leave much to be desired. And especially it is hard to find environment-friendly skyscrapers. Therefore, this study aims to establish the concept of environment-friendly skyscrapers that has not properly been defined, and to find realistic planning methods and practical alternatives through the analysis of the works that have brilliant ideas about environment-friendly architectural method. From the perspective of architectural planning, we did case analysis focused on site planning, form planning, elevation and floor planning, and tried to give useful ideas for high-rise architectural planning in Korea by finding practical solution focused on the active use of natural energy, saving resources, the reduction of wastes, natural architectural environment design and natural friendly system from the view of environment-friendly technological analysis.
The purpose of this study is to accumulate basic data to establish planning direction and planning factors for the environment-friendly apartment complex. For this purpose, the survey has been conducted to residents living in an apartment housing and graduate students, architects and research experts in the field. The major findings of this study are as follows; 1) The basic concept of planning factors for environment-friendly apartment complex are energy saving, resources saving, minimizing environment pollution, natural harmony, regional identity and pursuit of residents' health & amenity. 2) For the planning factors of environment-friendly apartment complex, the residents had a great regard for aspect of Low-Impact (energy saving, resources saving, minimizing environment pollution). The experts, on the other hand, had a great regard for aspect of High-contact (natural harmony, regional identity). 3) It was increase of prime cost that the residents and experts regarded as the most important problem of planning and purchasing of environment-friendly apartment. It thus appears that the promotion of environmental consciousness of residents taking in the portion of increased cost is crucial parts and also that the role of the connected aspects such as administration, construction companies and residents must be redefined in order to manage problems caused in process of the development of it.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.