The use of petroleum fuels in grain drying causes problems of high cost and management. To solve these problems, it is required to study on soLar energy as an alternative to petroleum fuels for grain drying. The purposes of this study were to find out the optimum received area and air flow rate of a flat-plate solar air collector for grain drying and to assess its effects on grain drying with a small grain bin. The results of this study are summarized as follows ; 1. The calculated optimum tilt angles of the collector in the summer and autumn drying seasons were 20 and 50 degress, respectively, in suwon area. 2. The outlet temperature of the collector was $36^\circ C$ on the daily average with the maximum of $36^\circ C$ at 12:00 o clock. Solar radiation on the collector surface was 1.04 ly( 1 langley = 1 cal/$cm^2$) per minute on the daily average and 1.30 ly per minute on the maximum at 11:00am. The thermal efficiency of the collector was 62.4 percent on the daily average, and the air flow-rate per unit receiving are was 1.03 $m^3$/min/$m^2$.4. The calculated optimum receiving area and the air flow-rate per unit cubic volume for paddy in autumn drying season was 2 $m^2$ and 2$m^3$/min , respectively. 5. not significantly difference in the collector efficiency was appeared between the rotating and fixed type of solar collector. 6. For drying of wheat with 0.6 meter of the depth in the bin, approximately 9 hours were required to reduce the moisture content from 21.6% to 13% with air follow rate of 5 $m^3$/min an initial moisture per cubic meter of wheat and with air temperature of $52^\circ C$. 7. In the drying test of rough rice with a turning operation in a grain bin approximately 21 hours were required to reduced the moisture from 21% to 14.5% with airflow rate of 2 $m^3$/min per cubic meter of rice and the air temperature of $43.5^\circ C$. 8. Over-drying at the bottom and less -drying at the top of the grain mass was resulted from the high -temperature of drying air which was obtained from the flat-plate solar collector in this test. An appropriate operation should be prepared for the uniform moisture of the grain in the bin.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.13
no.6
/
pp.590-596
/
2020
In the island areas where system connection with the commercial power grid is difficult, it is quite important to find a method to efficiently manage energy produced with independent microgrids. In this paper, a prosumer management system for P2P power transaction was realized through the testing the power meter and the response rate of the collected data for the power produced in the small-scale microgrids in which hybrid models of solar power and wind power were implemented. The power network of the microgrid prosumer was composed of mesh structure and the P2P power transaction was tested through the power meter and DC power transmitter in the off-grid sites which were independently constructed in three places. The measurement values of the power meter showed significant results of voltage (average): 380V + 0.9V, current (average): + 0.01A, power: 1000W (-1W) with an error range within ±1%. Stabilization of the server was also confirmed with the response rate of 0.32 sec. for the main screen, 2.61 sec. for the cumulative power generation, and 0.11 sec for the power transaction through the transmission of 50 data in real time. Therefore, the proposed system was validated as a P2P power transaction system that can be used as an independent network without transmitted by Korea Electric Power Corporation (KEPCO).
Hwayoung, Lee;Hyeonwoo, Jang;Minkyung, Lee;Jeonghwan, Kim;Jaehun, Lee
Journal of the Korean Institute of Gas
/
v.26
no.6
/
pp.30-36
/
2022
In commercial transactions of energy sources using hydrogen charging stations, high-accuracy flow meters are needed to prevent accidents such as overcharging due to inaccurate measurements and to ensure transparency in hydrogen commercial transactions through accurate measurements. This research developed a Corioli-type flowmeter prototype and conducted a risk assessment to prevent accidents during a process change comparison experiment for existing charging stations to verify the measurement performance. A process change section was defined for the installation of measurement facilities for empirical experiments and HAZOP was conducted. In addition, JSA was also conducted to secure the safety of experimenters, such as preventing valve mis-opening during empirical experiments. Measures were established to improve the risk factors derived through HAZOP, and work procedures were established to minimize human errors and ensure the safety of workers through JSA. The design change and system manufacturing for the installation of the metering system were completed by reflecting the risk assessment results, and safety could be confirmed through the performance comparison test of the developed meter prototype. The developed prototype flow meter showed a total of 30 flow measurements under the operating conditions of 70 MPa, and the average error was -1.58% to 3.96%. Such a metering error was analyzed to have the same performance as a flow meter installed and operated for commercial use.
Purpose: Those who access to the nuclear medicine department are classified as radiation workers, temporarily access group, and occasional access group as defined by the atomic energy law. The radiation workers and temporarily access people wear a personal radiation dosimeter for checking their own radiation absorbed dose periodically. However, because of the sanitation workers, classified as temporarily access group, who are working in the nuclear medicine department are moved in a cycle with other departments and their works are changeful, it is hard to control their radiation absorbed dose. Thus, this study is going to examine the state of the sanitation worker's radiation absorbed dose, and then make sure whether they are classified as temporarily access group or not. Materials and methods: In the first instance, the first sanitation worker who works in vitro laboratory and PET room and the second sanitation worker who works in gamma camera rooms (invivo room) wore radiation dosimeter-OSL(Optically Stimulated Luminescence)- to measure their own radiation absorbed dose during work time from May to June 2011. Secondly, this study was taken place 5 places in gamma camera rooms, 2 places in PET bed room, operating room, waiting room and cyclotron room in PET and 4 places in vitro laboratory. And then to measure the radiation space dose rate, it is measured 10 times each of places as sanitation worker's work flow by using radiation survey meter. Results: The radiation absorbed dose on OSL of the first c who works in vitro laboratory and PET room and the second one who works in gamma camera rooms are 0.04, 0.02 mSv per month respectively. That means the estimated annual radiation absorbed doses are less than 1mSv as 0.48, 0.24 mSv/yr respectively. The radiation space dose rates as sanitation worker's work flow using survey meter are 0.0037, 0.0019 mSv/day, so the estimated annual radiation absorbed dose are 0.93, 0.47 mSv/yr respectively. The weighted exposure dose of first sanitation worker of each places are 1.62% in cyclotron room, 3.88% in waiting room, 2.39% in operating room, 81.01% in bed room of PET and 11.01% in vitro laboratory. The weighted exposure dose of second sanitation worker of each places are 45.22% in radiopharmaceutical laboratory, gamma 30.64% in camera rooms, 15.65% in waiting room, 8.49% in reading room. Conclusion: The annual radiation absorbed doses on OSL of both sanitation workers are less than 1 mSv per year and the annual radiation absorbed doses by using survey meter are less than 1mSv either, but close up to 1 mSv. Thus, to clarify whether the sanitation workers are temporarily access group or not, and to be lessen their s radiation absorbed dose, they should be educated about management of radiation and modified their work flow or work time appropriately, their radiation absorbed dose would be lessen certainly.
It is important to measure and protect from the radiation space dose and induced activity at the high energy medical linear accelerator facilities. These are to consider the additional risk to patients undergoing treatment, machine operators and staff members. Measurements of the space dose distribution and induced radioactivity at the 18 MeV medical linear accelerator facility in the Yonsei Cancer Center. 1. Exposure space dose for 300 rads monitor doses of 18 MeV electron are measured as 50 mR at 1 meter from patients. 2. Exposure space dose for 300 rads monitor doses of 10 MV X-ray are detected as 350 mR at 1 meter from phantom. 3. Induced radioactivity by photonuclear reaction was measured as 0.65 mR/hr from collimater after 30 Gy(3,000 rads) irradiated. 4. Analyzing the decay curves and energy spectrum of induced radioactivity, detected a few materials to be activated by photoneutron reaction, $^{65}Cu({\gamma}{\cdot}n)\;^{64}Cu,\;^{186}W({\gamma}{\cdot}n)\;^{185}W,\;^{181}Ta({\gamma}{\cdot}n)\;^{180}Ta,\;^{199}Au({\gamma}{\cdot}n)\;^{198}Au$.
This research is to determine the level of environmental pollution at a blasting construction area which is the origin of noise, vibration, and suspended particle, and to compare the results with other domestic and international standard data. This experiment is also to find out the effects resulting from blasting construction and to propose a plan that can decrease environmental pollution. The blasting construction area is a factory site which is about one and half million square meter and sewage disposal plant is about ninety thousand square meter. Both were selected as the areas for the tests to be conducted in determination test. The test to determine the level of noise, vibration, and total suspended particle was conducted thirty times around the blasting construction area by comparing measurement results and numerical analysis. However, as the test was not conducted in the laboratory but in the actual blasting construction area, it was not possible to do the test with the same exact conditions each true. Therefore, the test was not ideal as conditions could change from test to test. For the most part, the level of noise was below the standard level of 70dB. Every vibration test was under the standard limitation. For example, a house, 200m away was tested for noise and vibration and the level was found to be under the 0.2 cm/sec which is the standard for specialty designed cultural sites., i.e very low level. Also a buried oil pipeline that was 30m away also marked under 2.0cm/sec which is the norm for an industrial area. However, if there were an oil pipeline under the house, the amount of charging gunpowder per hole should be decreased compared to the amount used in the test. The test result for suspended particles under the standard limitation which is 24hour average 300$\mu\textrm{g}$/㎥ at a distance from blasting wavelength, but at detonator, total suspended particle from the blast origin exceeded the standard limitation. If explosion occurs when it detonates in the hole, most of the energy would be absorbed in the crushing of rocks, but some remaining energy would make noises and vibration inevitable. So the important thing is how to minimize the environmental pollution from the blasting. There should be regulations in order that the standard limitation is not exceeded, and to decrease the environmental pollution from the blasting.
Sour gas is natural gas or any other gas containing significant amounts of hydrogen sulfide ($H_2S$). Natural gas is usually considered sour gas if there are more than 5.7 milligrams of $H_2S$ per cubic meter of natural gas, which is equivalent to approximately 4 ppm by volume under standard temperature and pressure We have surveyed on the treatment and removal technology of sour gas, sour gas include a lot of hydrogen sulfide($H_2S$), Carbon dioxide($CO_2$), utane($C_4H_{10}$) and mercaptan($C_nH_{4n-1}SH$) etc. We need high technology for development for these kinds of raw gases and we should specially take care of treating and removal of theses raw gases. Therefor we are going to describe about these kinds of raw gases and about methods how to treat these kinds of gases.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.7
no.2
/
pp.249-265
/
1995
The performance of a refrigerant mixture of propane(R290)/isobutane(R600a) as a substitute for CFC12 was investigated in a domestic refrigerator with single evaporator. A thermodynamic cycle simulation indicated an increase in COP of a 1.7 to 2.4% with R-290/600a in the composition range of 0.2 to 0.6 mass fraction of R290 compared to CFC12. For the tests, two units($299{\ell}$, $465{\ell}$) were used. All refrigeration components remained the same throughout the tests, except that the length of capillary tube and amount of charge were changed for the mixture. The refrigerators were fully instrumented with more than 20 thermocouples, 2 pressure transducers, and watt/watt-hour meter for each refrigerator. 'Energy consumption test' and 'no load pulldown test' were performed under the same condition. The experimental results obtained with the same compressor indicated that R-290/600a mixture at 0.6 mass fraction of R290 showed a 3 to 5% increase in energy efficiency and a faster cooling speed compared to CFC12. The R-290/600a mixture showed a shorter compressor on-time and a lower compressor dome temperature than CFC12. In conclusion, the proposed hydrocarbon mixture seems to be an appropriate candidate to replace CFC12 without causing more environmental problems.
Kim, Yeong-Jung;Yu, Yeong-Seon;Gang, Geum-Chun;Baek, Lee;Yun, Jin-Ha;Lee, Geon-Jung
Journal of Biosystems Engineering
/
v.26
no.3
/
pp.263-270
/
2001
This study was conducted in order to develop wind-water heating system where frictional heat is creased between the rotor and working fluid when they are rotating in the cylindrical heat generator. The wind-water heating system is composed of rotor, stator, working fluid, motor, inverter and heat generation tank. Instead of wind turbine, we have used an electrical motor of 30㎾ to rotate the rotor in this system. Two working fluids and six levels of rotor rpm were tested to quantify heat amounts generated by the system. Generally, as motor rpm goes up heat amount increases that we have expected. At the same rpm, viscous fluid showed up better performance than the water, generating more heat by 10$\^{C}$ difference. The greatest heat amount of 31,500kJ/h was obtained when the system constantly drained out the hot water of at the flow rate of 500ℓ/h. Power consumption rate of the motor was measured by thee phase electric power meter where the largest power consumption rate was 14㎾ when motor rpm was 600 and gained heat was 31,500kJ/h, that indicated total thermal efficiency of the wind power water heating system was 62%.
According to green growth's policy, green-home dissemination's projects are promoting. Among them, stationary fuel cell systems are receiving attention due to high efficiency and clear energy. But it need absolutely to develop cost down technologies and improve system durability for commercialization of the fuel cell system. To achieve this objectives, in 2009, the Korean Government and "Korea Institute of Energy Technology Evaluation and Planning(KETEP)" launched into the strategic development project of BOP technology for practical applications and commercializations of stationary fuel cell systems, named "Technology Development on Cost Reduction of BOP Components for 1kW Stationary Fuel Cell Systems to Promote Green-Home Dissemination Project". This paper introduces a summary of improved BOP performances that has been achieved through the 2nd year development precesses(2010.06~2011.05) base on 1st year development precesses(2009.06~2010.05). The major elements for fuel cell systems are cathode air blowers, burner air blowers, preferential oxidation air blowers, fuel blowers, cooling water pumps, reformer water pumps, heat recovery pumps, mass flow meters, electrical valves, safety valves and a low-voltage inverter. Key targets of those elements are the reduction of cost, power consumption and noise. Invert's key targets are development the low -voltage technologies in order to reduce the number of unit cell in fuel cell system's stack.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.