• Title/Summary/Keyword: Energy Requirements

Search Result 1,354, Processing Time 0.026 seconds

Nutritional Requirements and Management Strategies for Farmed Deer - Review -

  • Shin, H.T.;Hudson, R.J.;Gai, X.H.;Suttie, J.M.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.13 no.4
    • /
    • pp.561-573
    • /
    • 2000
  • Knowledge concerning the nutritional requirements and nutritional problems of fanned deer is limited. Nutritional recommendations must be based on data from domestic ruminants and fanned deer. An understanding of the biology and adaptative characteristics of wild deer is essential for sensible application of sheep and cattle nutritional principles. Nutritional requirements of deer are generally separated into five categories: energy, protein, minerals, vitamins and water. Research on deer nutrition has primarily focused on energy, protein and minerals (phosphorus and calcium). Changes in the nutritional requirements that occur with gestation, lactation, breeding and antler growth should be coordinated with seasonal changes in nutrient availability from forage plants. This paper describes aspects of current knowledge of energy, protein, minerals, vitamins and water requirements. Nutritional problems of. fanned deer are described with recommendations for prevention or control. A comparison of production efficiency of deer, lamb, beef cattle and dairy cattle is included.

ENERGY REQUIREMENTS OF GROWING SAHIWAL × FRIESIAN HEIFERS IN MALAYSIA

  • Liang, J.B.;Samiyah, M.N.;Azizan, A.R.;Dollah, M.A.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.5 no.1
    • /
    • pp.75-79
    • /
    • 1992
  • Fourteen Sahiwal ${\times}$ Friesian crossbred heifers were used in a 10-wk feeding trial to determine maintenance energy requirements and efficiency of gain. The heifers were individually fed with a diet consisting of 30% dry grass and 70% concentrates at either 110, 140 or 180% of the anticipated maintenance requirement ($494kJ\;ME/kg^{0.75}/day$). Liveweight of individual heifers was measured weekly to calculate diet requirements and average daily gain (ADG). Diet digestibility was determined for all heifers to determine ME intake. Retained energy (RE) of individual heifers was determined from changes in total body fat and protein using a TOH isotope dilution procedure and, assuming calorific values of 39.3 and 23.6 kJ/g for fat and protein respectively. The estimated ME for maintenance was 433 and $470kJ/kg^{0.75}/day$ by liveweight (ADG) equilibrium and energy (RE) equilibrium analysis respectively. ME requirement for one g of liveight gain was 28 kJ.

AN ANALYSIS OF TECHNICAL SECURITY CONTROL REQUIREMENTS FOR DIGITAL I&C SYSTEMS IN NUCLEAR POWER PLANTS

  • Song, Jae-Gu;Lee, Jung-Woon;Park, Gee-Yong;Kwon, Kee-Choon;Lee, Dong-Young;Lee, Cheol-Kwon
    • Nuclear Engineering and Technology
    • /
    • v.45 no.5
    • /
    • pp.637-652
    • /
    • 2013
  • Instrumentation and control systems in nuclear power plants have been digitalized for the purpose of maintenance and precise operation. This digitalization, however, brings out issues related to cyber security. In the most recent past, international standard organizations, regulatory institutes, and research institutes have performed a number of studies addressing these systems cyber security.. In order to provide information helpful to the system designers in their application of cyber security for the systems, this paper presents methods and considerations to define attack vectors in a target system, to review and select the requirements in the Regulatory Guide 5.71, and to integrate the results to identify applicable technical security control requirements. In this study, attack vectors are analyzed through the vulnerability analyses and penetration tests with a simplified safety system, and the elements of critical digital assets acting as attack vectors are identified. Among the security control requirements listed in Appendices B and C to Regulatory Guide 5.71, those that should be implemented into the systems are selected and classified in groups of technical security control requirements using the results of the attack vector analysis. For the attack vector elements of critical digital assets, all the technical security control requirements are evaluated to determine whether they are applicable and effective, and considerations in this evaluation are also discussed. The technical security control requirements in three important categories of access control, monitoring and logging, and encryption are derived and grouped according to the elements of attack vectors as results for the sample safety system.

Software Functional Requirements and Architectures of Microgrid Energy Management System

  • Sohn, Jin-Man;Yun, Sang-Yun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.269-272
    • /
    • 2016
  • Distribution management system or microgrid energy management system plays an important role in monitoring, operation and control of electrical distribution systems by utilizing IT infrastructure. Nowadays, the rapid increase of the distributed resources makes the conventional management system have some additional functionality for the reliable operation due to intermittent renewables and the efficient operation on the economical purpose. In this paper, the brief standard software functional requirements of microgrid energy management system are provided through survey of the recent commercial products of the major vendors, and furthermore the architectures of microgrid energy management system are provided in comparison with major suppliers' microgrid energy management system. The summary of investigation will be able to make the developers and researchers focus on the specific functionality in the real world.

Design of Improved Detection Instrumentation for the Annulus Gas System for Wolsong 2

  • Kim, Seog-Nam;Koo, Jun-Mo;Chang, Ik-Ho;Jung, Ho-Chang;Han, Sang-Joon
    • Nuclear Engineering and Technology
    • /
    • v.28 no.4
    • /
    • pp.423-430
    • /
    • 1996
  • The improved and advanced Annulus Gas System(AGS) has been developed for Wolsong 2 to satisfy the requirements of the regulatory body. The Atomic Energy Control Board(AECB) required a shorter detection time following a small leak from a pressure tube and/or calandria tube. This paper describes licensing requirements, functional requirements and detail design description for the AGS. The Wolsong unit No. 1 AGS was designed to operate as a stagnant system normally requiring only pressure regulation and having provisions for purging. no improved AGS involves the adoption of gas recirculation in AGS, duplication of dew point indicators with additional instrumentation and sampling provisions to prompt operator action. The improved system operates in the recirculation mode with continuous dew point measurement for leak detection. An AGS with improved detection instrumentation is provided.

  • PDF

Requirement Management through Connection between Regulatory Requirements and Technical Criteria for Dismantling of Nuclear Installations (원자력시설 해체 규제요건과 기술기준 연계를 통한 요구관리)

  • Park, Hee Seoung;Park, Jong Sun;Hong, Yun Jeong;Kim, Jeong Guk;Hong, Dae Seok
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.1
    • /
    • pp.63-71
    • /
    • 2018
  • This paper discusses decommissioning procedure requirements management using requirement engineering to systematically manage the technical requirements and criteria that are required in decontamination and decommissioning activities, and the regulatory requirements that should be complied with in a decommissioning strategy for research reactors and nuclear power plants. A schema was designed to establish the traceability and change management related to the linkage between the regulatory requirements and technical criteria after classifying the procedures into four groups during the full life-cycle of the decommissioning. The results confirmed that the designed schema was successfully traced in accordance with the regulatory requirements and technical criteria required by various fields in terms of decontamination and decommissioning activities. In addition, the changes before and after the revision of the Nuclear Safety Act were also determined. The dismantling procedure requirement management system secured through this study is expected to be a useful tool in the integrated management of radioactive waste, as well as in the dismantling of research reactor and nuclear facilities.

Assessment of Physical Activity Level of Korean Farmers to Establish Estimated Energy Requirements during Busy Farming Season (농번기 농업인의 에너지필요추정량 설정을 위한 활동량 및 신체활동수준 평가)

  • Kim, Eun-Kyung;Lee, Sun-Hee;Ko, Su-Young;Yeon, Seo-Eun;Choe, Jeong-Sook
    • Korean Journal of Community Nutrition
    • /
    • v.16 no.6
    • /
    • pp.751-761
    • /
    • 2011
  • The purpose of this study was to assess the physical activity level of Korean farmers to establish their estimated energy requirements during busy farming season. 113 farmers (mean age $51.9{\pm}7.2$ years, male 42, female 71) who own farmland area above 300 pyung participated in measurement of body weight and height and interviewing of one-day activity diaries. There was no significant difference in age, BMI between male and female. Obesity prevalence according to BMI among male and female farmers was 40.5% and 50.7% respectively. The farmers spent about 7 hours in sleeping and spent about 4 hours 35 minutes working on the farm and spent about 15 hours 30 minutes (64.6% of 24 hours) in "very light activities" and spent about 3 hours 31 minutes (14.7%) in "light activities". Physical activity level (PAL, activity coefficient) of male farmers was 2.63 which was significantly higher than that (2.19) of female farmers (p < 0.05). Estimated energy requirements (EER) for farmers who were different in age and gender were suggested. For example, the estimated energy requirements for male and female farmers were 3058 kcal/day and 2279 kcal/day, respectively. The results of this study suggest that estimated energy requirements (EER) of farmers should be differentiated according to seasonal workload and energy balance of farmers should be evaluated to prevent obesity.

Energy Requirements in Early Life Are Similar for Male and Female Goat Kids

  • Bompadre, T.F.V.;Neto, O. Boaventura;Mendonca, A.N.;Souza, S.F.;Oliveira, D.;Fernandes, M.H.M.R.;Harter, C.J.;Almeida, A.K.;Resende, K.T.;Teixeira, I.A.M.A.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.27 no.12
    • /
    • pp.1712-1720
    • /
    • 2014
  • Little is known about the gender differences in energetic requirements of goats in early life. In this study, we determined the energy requirements for maintenance and gain in intact male, castrated male and female Saanen goat kids using the comparative slaughter technique and provide new data on their body composition and energy efficiency. To determine the energy requirements for maintenance, we studied 21 intact males, 15 castrated males and 18 females ($5.0{\pm}0.1kg$ initial body weight (BW) and $23{\pm}5d$ of age) using a split-plot design with the following main factors: three genders (intact males, castrated males, and females) and three dry matter intake levels (ad libitum, 75% and 50% of ad libitum intake). A slaughter group included three kids, one for each nutritional plane, of each gender, and all three animals within a group were slaughtered when the ad libitum kid reached 15 kg in BW. Net energy requirements for gain were obtained for 17 intact males, eight castrated males and 15 females ($5.1{\pm}0.4kg$ BW and $23{\pm}13d$ of age). Animals were fed ad libitum and slaughtered when they reached 5, 10, and 15 kg in BW. A digestion trial was performed with nine kids of each gender to determine digestible energy, metabolizable energy and energy metabolizability of the diet. Our results show no effect of gender on the energy requirements for maintenance and gain, and overall net energy for maintenance was $205.6kJ/kg^{0.75}$ empty body weight gain (EBW) ($170.3kJ/kg^{0.75}$ BW) from 5 to 15 kg BW. Metabolizable energy for maintenance was calculated by iteration, assuming heat production equal to metabolizable energy intake at maintenance, and the result was $294.34kJ/kg^{0.75}$ EBW and $k_m$ of 0.70. As BW increased from 5 to 15 kg for all genders, the net energy required for gain increased from 9.5 to 12.0 kJ/g EBW gain (EWG), and assuming $k_g=0.47$, metabolizable energy for gain ranged from 20.2 to 25.5 kJ/g EWG. Our results indicate that it is not necessary to formulate diets with different energetic content for intact male, castrated male and female Saanen goat kids weighing from 5 to 15 kg.

Development of Requirements Tracking and Verification System for the Software Design of Distributed Control System

  • Jung, Chul-Hwan;Kim, Jang-Yeol;Kim, Jung-Tack;Lee, Jang-Soo;Ham, Chang-Shik
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1998.05a
    • /
    • pp.335-340
    • /
    • 1998
  • In this paper a prototype of Requirement Tracking and Verification System(RTVS) for a Distributed Control System was implemented and tested. The RTVS is a software design and verification tool. The main functions required by the RTVS are managing, tracking and verification of the software requirements listed in the documentation of the DCS. The analysis of DCS software design procedures and inter(aces with documents were performed to define the user of the RTVS, and the design requirements for RTVS were developed.

  • PDF

A Smart Lighting Management System with Satisfaction of User's Lighting Requirements (사용자 요구조도 만족 스마트 조명 관리시스템)

  • Shin, Dae-Sik;Kim, Hoon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.6
    • /
    • pp.1-8
    • /
    • 2013
  • In this paper, we proposed a smart lighting management system controls the lighting efficiently to reduce energy consumption while satisfying user's lighting requirements. The proposed system considers the available daylight intensity and indoor light source to satisfy the lighting requirements of each user according to the work environment. In addition, for user convenience, we have developed different user interfaces for lighting control including local interface, and remote interface through internet or Bluetooth for personal computer as well as smart phones. The proposed system satisfies the lighting requirements of each user according to the corresponding work environment. The proposed smart lighting management system utilizes the lighting energy efficiently, and can be considered a significant contribution towards future green buildings.