Prediction and Assessment on Consolidation Settlement for Soft Ground by Hydraulic Fill (준설매립 연약지반에 대한 압밀침하 예측 및 평가)

  • Jeon, Je-Sung;Koo, Ja-Kap;Oh, Jeong-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.9
    • /
    • pp.33-40
    • /
    • 2008
  • This paper describes the performance of ground improvement project using prefabricated vertical drains of condition, in which approximately 10m dredged fill overlies original soft foundation layer in the coastal area composed of soft marine clay with high water content and high compressibility. From field monitoring results, excessive ground settlement compared with predicted settlement in design stage developed during the following one year. In order to predict the final consolidation behavior, recalculation of consolidation settlements and back analysis using observed settlements were conducted. Field monitoring results of surface settlements were evaluated, and then corrected because large shear deformation occurred by construction events in the early stages of consolidation. To predict the consolidation behavior, material functions and in-situ conditions from laboratory consolidation test were re-analyzed. Using these results, height of additional embankment is estimated to satisfy residual settlement limit and maintain an adequate ground elevation. The recalculated time-settlement curve has been compared with field monitoring results after additional surcharge was applied. It might be used for verification of recalculated results.

A Case Study on the Application of Gravel Pile in Soft Ground (Gravel Pile에 의한 연약지반 개량 시험시공 사례연구)

  • 천병식;고용일;여유현;김백영;최현석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.223-230
    • /
    • 2000
  • Sand drain as a vertical drainage is widely used in soft ground improvement. Recently, sand, the principal source of sand drain, is running out. The in-situ tests were carried out to utilize gravel as a substitute for sand. In-situ tests area was divided into two areas by material used. One is Sand Drain(SD) and Sand Compaction Pile(SCP) area, the other is Gravel Drain(GD) and Gravel Compaction Pile(GCP) area. Both areas were monitored to obtain the information on settlement, pore water pressure and bearing capacity by measuring instruments for stage loading caused by embankment. The results of measurements were analyzed, The clogging effect was checked at various depth in gravel column after the test. According to the test results, the settlement was found to be smaller in gravel drain than in sand drain. The increase in bearing capacity by gravel pile explains the result. The clogging effect was not found in gravel column. It is assumed that gravel is relatively acceptable as a drainage material. Gravel is considered to be a better material than sand for bearing capacity, and it is found that bearing capacity is larger when gravel is used as a gravel compaction pile than as a gravel drain.

  • PDF

Comparison of Coefficient of Consolidation and Prediction of Excess Pore Water Pressure of Agricultural Reservoir under Embankment on Soft Ground (연약지반상에 축조된 농업용저수지의 과잉공극수압 예측과 압밀계수의 비교)

  • Lee, Dal-Won;Kim, Eun-Ho
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.2
    • /
    • pp.1-9
    • /
    • 2010
  • This study was carried out to comparison of coefficient of consolidation and the prediction of excess pore water pressure in agricultural reservoir on soft clay ground. For the purpose of verification of the proposed equation, laboratory model tests and field tests were performed and excess pore water pressure was compared to those predicted with the Terzaghi's method. The predicted excess pore water pressure according to ponding was very applicable to practice because it was close to the observed data. Also, for the comparison of coefficient of consolidation, the oedometer, constant rate of strain (CRS), and Rowe cell tests were performed. The coefficient of consolidation at the Rowe cell and CRS tests showed a greate increase than in the oedometer test. The ratio of the vertical and horizontal coefficient of consolidation showed a large difference according to various tests method and mixing ratio. Therefore, it is recommended that careful attention should be paid to predicting the required consolidation period in agricultural reservoir.

Case Study of Immersed Tunnel Instrumentation Management Using Wireless System (지중무선 시스템을 이용한 침매터널 구간 계측관리 사례연구)

  • Han, Sang-Wook;Kim, Byung-Hee;Han, Byung-Won;Lee, Gye-Chun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.768-773
    • /
    • 2009
  • Measuring method being applied for off-shore works is performed by using data logger or manual measuring instrument with wiring the cable connected from the sensor up to the position where measuring is allowed.(upper part of embankment or marine structure) Measuring management by using existing measuring method may be acceptable on the condition that the ground deformation volume(vertical, horizontal) is generally minimal and the site condition is good. But loss of measuring instrument, sensor cable failure or cutting is taken place frequently due to significant change of ground behavior caused by an external force change(embankment, excavation) under very soft ground condition(N value below 0-4). In case of the marine works, in particular, loss rate of measuring instrument is highly represented due to the factors of working barge anchoring, constructional interference and natural disaster. In order to solve these problems, measuring management was performed with employing underground wireless system at the immersed tunnel site. Measuring data was obtained freely under the marine environment by using underground wireless communication and cable cutting potential by ground behavior could be reduced. Measuring cost savings and its installation convenience were maximized by way of off-shore tower installation or cabling and by minimizing constructional interference of off-shore working barge. This case of measuring management was accomplished successfully.

  • PDF

Soil Arching in Embarikments Suppoyed by Piles with Geosynthethics (말뚝과 토목섬유로 지지된 성토지반의 아칭효과)

  • Hong, Won-Pyo;Lee, Jae-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.6
    • /
    • pp.53-66
    • /
    • 2007
  • A series of model tests were performed to investigate the soil arching effect in embankments supported by piles with geosynthetics. In the model tests, model piles with isolated cap were inserted through the holes in a steel plate, which could be operated up and down. Then geosynthetics was laid on the pile caps below sand fills. The settlement of soft ground was simulated by lowering the plate. As the plate was lowered, the soil arching was mobilized in the embankments. The deformation of both the sand fills and geosynthetics were captured by camera. Also the loads acting on pile cap and the tensile strain of geosynthetics were monitored by data logging system. Model tests showed that the embankment loads transferred on pile cap by soil arching Increased rapidly with settlement of the soft ground. In case of the absence of geosynthetics, the loads acting on pile caps dropped to residual value after peak value, whereas loads on pile caps gradually increased until constant value in case of geosynthetic-reinforced. This illustrated that reinforcing with the geosynthetics has a good effect to restrain the settlement of embankments. Also, the deformation shape of geosynthetics between pile caps was circular. The embankment loads transferred on pile caps can be estimated by considering both soil arching and tensile strain of geosynthetics in embankments supported by piles with geosynthetics.

Punching Shear Failure in Pile-Supported Embankments (말뚝으로 지지된 성토지반 내 펀칭전단파괴)

  • Hong, Won-Pyo;Song, Jei-Sang;Hong, Seong-Won
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.35-45
    • /
    • 2010
  • The mechanism of load transfer by punching shear in pile-supported embankments is investigated. Based on the geometric configuration of the punching shear observed in sand fills on soft ground, a theoretical analysis is carried out to predict the embankment loads transferred on a cap beam according to punching shear developed in pile-supported embankments. The equation presented by the theoretical analysis was able to consider the effect of various factors affecting the vertical loads transferred on the cap beam. The reliability of the presented theoretical equation is investigated by comparing it with the results of a series of model tests. The model tests were performed on cap beams, which had two types of width; one is narrow width and the other is wide width. Sand filling was performed through seven steps. Two types of loading pattern were applied at each filling step; one is the long-term loading, in which sand fills at each filling step were kept for 24 hours, the other is the short-term loading, in which sand fills at each filling step were kept for 2 hours. The vertical loads measured in all model tests show good agreement with the ones predicted by the theoretical equation. Finally, the predicted vertical loads also show good agreement with the vertical loads measured in a well-instrumented pile-supported embankment in field, where cap beams were placed on too wide space.

An Analysis of the Effect of PBD Discharge Capacity to Leave Period (방치기간에 따른 PBD의 통수능 효과 분석)

  • Lee, Keeyong;Park, Minchul;Jeong, Sangguk;Lee, Song
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.10
    • /
    • pp.39-49
    • /
    • 2011
  • Recently PBD method, one of acceleration of consolidation methods is used in the soft ground to shorten consolidation time for fast settlement during construction. It is economical and easy to work. Discharge capacity of PBD is sensitive in proportion to thickness of soft ground layer, and drainage of PBD declines due to disturbance effect in surrounding ground by mandrel used for vertical drainage setting and setting machines and type. Also, deviation of discharge capacity is large according to ground condition, construction condition and soil properties. In addition, when embankment loading is not conducted instantly after PBD setting due to rain or lack of embankment material supply, it causes leaving period problems. But cause and analysis of those problems for discharge capacity is lack. So, in this test, ground improvement and discharge capacity is investigated by implementing composite discharge capacity test for analysis of an effect factor of PBD discharge capacity with leaving period. After fixing the vertical drain on a cylindrical cylinder, put churned sample into the cylinder. Then leave 0day, 30day, 60day and 90day. And then, load following the loading step of 30, 70 and 120kPa using a pressure device. As a result, the longer leaving period, discharge capacity is reduced. It is caused by a decrease of discharge area caused by creep transformation moisture absorption of PBD filter after long leaving period.

Reinforcement and Arching Effect of Geogrid-reinforced and Pile-supported Embankments (지오그리드와 말뚝으로 보강된 성토지반의 보강 및 아칭효과 연구)

  • Oh Young-In;Shin Eun-Chul
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.10
    • /
    • pp.5-16
    • /
    • 2005
  • Geosynthetic-reinforced and pile-supported embankments have been increasingly used and researched around the world. The inclusion of one or multiple geosynthetic reinforcements over the pile is intended to enhance the efficiency of load transfer from soft ground to piles, to reduce total and differential settlement and increase global or local stability. In this paper, the reinforcement effectiveness and arching effect of the geogrid-reinforced and pile-supported embankments have been studied in terms of field model tests and numerical analysis with varying the space between piles and reinforcement. 2-dimensional numerical analysis has been conducted using the FLAC (Fast Lagrangian Analysis of Continua) program. And load transfer mechanisms between soil-piles-geogrid were investigated. The mechanisms of load transfer can be considered as a combination of embankment soil arching, tension geogrid, and stress concentration due to the stiffness difference between pile and soft ground. Based on the field model test and numerical analysis results, it was found that the geosynthetic reinforcement slightly interferes with soil arching, and helps reduce differential settlement of the soft ground. Also. at the D/b=3 (D: spacing of pile cap, b: diameter of pile), the total settlement is reduced by about $40\%$ compared to that without reinforcement. For $D/b{\ge}6$, the effectiveness of geogrid reinforcement in reducing settlement is negligible.

Geotechnical Considerations for Railway Design in the Middle East (중동지역 철도설계 시 지반공학적 고려사항)

  • Moon, Joon-Shik
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.11
    • /
    • pp.49-60
    • /
    • 2013
  • The plan for major design-build projects of railway link among countries in gulf area (GCC) and freight rail construction is recently announced, but Korean companies have a hard time tendering due to special geotechnical condition in the Middle East. The major geotechnical risks during railway construction in the Middle East are related to ground improvement of soft Sabkha ground, wind-blown sand mitigation measure, dune sand compaction, and construction of large-scale cut and embankment. In this study, the characteristics of special geotechnical condition and potential geotechnical risks during railway construction in the Middle East are discussed on the basis of field observation, literature review, and field and laboratory test results.

Consolidation Behavior of Agricultural Reservoir under Embankment on Soft Ground (연약지반상(軟弱地盤上)에 축조(築造)된 농업용저수지(農業用貯水池) 제체의 압밀거동(壓密擧動))

  • Oh, Beom-Hwan;Lee, Dal-Won;Eam, Sung-Hoon
    • Korean Journal of Agricultural Science
    • /
    • v.29 no.2
    • /
    • pp.53-66
    • /
    • 2002
  • This study was performed to evaluation the consolidation behavior of agricultural reservoir in the very soft ground. The final settlement prediction methods by Terzaghi, Hyperbolic and Asaoka methods were used to compare with the degree of consolidation estimated by exess pore water pressure. The dissipated excess pore water pressure during embankment construction and peak excess pore water pressure on the completed embankment were suggested for the estimation of the degree of consolidation. It was concluded that the degree of consolidation estimated from dissipated excess pore water pressure was more reliable than that from the peak excess pore water pressure. The stability methods for agricultural reservoir was used to compare and analyze with various condition by limit equilibrium method.

  • PDF