• 제목/요약/키워드: Elevator Maintenance

검색결과 52건 처리시간 0.028초

마이크로파일을 이용한 기초보강공법의 국내 적용 사례 (Case History: Micropiling for Existing Foundation Retrofits)

  • 이정훈;최창호;조삼덕;이기환;조현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.359-365
    • /
    • 2008
  • As housing supply ratio has become over 100%, the strategic vision of government's policies has been changed from new construction to maintenance and regeneration of old architectural-structures. This fact has brought a light on the reconstruction and remodeling industries and a need for retrofit and rehabilitation techniques of existing foundation. Various methods of foundation for architectural-structures do exist. Among them, micropiling technologies are increasingly applied in foundation rehabilitation and seismic retrofitting projects. Micropiling techniques provide environmental-friendly methods for minimizing disturbance to adjacent structures, ground, and the environment. The installation is possible in restrictive area and general ground conditions. The fact that the installation procedures cause minimal vibration and noise and require very low ceiling height makes the micropiling methods to be commonly used for underpin existing structures. Specialized drilling equipment is often required to install the micropiles for existing basement facilities. This paper presents a case study in which micropiles were constructed to support a superstructure for vertical extension of existing elevator core and provide accessibility to underground parking lot. It is intended to become useful reference for the similar remodeling project.

  • PDF

하중 분산형 엔드리스 와인더와 통합형 제어반을 적용한 육상 해상 풍력타워 승강기 개발 (Development of Onshore Offshore Tower Elevator with load distribution endless winder and integrated control panel)

  • 이상훈
    • 한국산업융합학회 논문집
    • /
    • 제22권6호
    • /
    • pp.711-719
    • /
    • 2019
  • At present, wind power is the fastest growing technology in the world. The domestic market depends heavily on imports for wind tower lift. so it manage through the overseas maker. The lift manufacture, establishment and maintenance utility is increasing, localization development of one wind tower lift is necessary with domestic fundamental base technique. In this paper, we will study the components necessary for the development of onshore offshore wind tower elevators, which are currently dependent on total imports, in line with the high growth of the wind market and the enlargement of the wind power generators. First of all, endless winders and cabins, which are the core components of the offshore wind tower lift, were examined for the components that affect the structural safety. Structural analysis was performed on Sheave, which is responsible for most of the lift lifting loads, and Block Stop, a safety device that prevents the cabin from falling in an emergency. The structural suitability was evaluated by comparing with the safety factor. In addition, the on-board control panel combines the control panel of the elevator and the drive motor driving the endless winder for efficient control of the offshore wind tower lift. The addition of features improves ride comfort at departure.

공동주택 공종별 수선시기 설정 연구 (A Study on the Repair Time of the Construction Type in the Apartment Housings)

  • 이강희;박근수;채창우
    • 한국주거학회논문집
    • /
    • 제22권4호
    • /
    • pp.83-92
    • /
    • 2011
  • Apartment is settled down as a main housing type and massive supply has been conducted since 1990's. The government has focused on the housing supply to improve the housing number and cut its price. On the contrary, the management of the housing has been neglected to get an early deterioration. Since 1995's, various ways have been made to improve and maintain the building function and performance. Among these, the long-term repair plan has played a main role to manage the housing condition and plan the repair schedule for preparing the massive cost of repair such as a roof proof, elevator change. The long-tern repair plan provides the repair time and repair rate according to various construction types. Most of the management agent apply the repair standard into the field area. But the repair time could not reflect the present condition and bring into the wrong maintenance. Therefore, the repair time for the long-term maintenance plan would be revised and reflected from the material and technology development. |n this study, it aimed at improvement for the repair time in various construction types which are provided in the long-term repair plan. For this, the 22 management agents are surveyed directly. This study shows that the repair time of the painting are correspondent to the repair time of the long-term plan irregardless of the painting materials. Most of other areas would correspondently similar to the long-term plan. This study could not include the building location, material and other haracteristics. Therefore, the further study would be needed to reflect the building and materials attributes to get the detailed repair time.

공공임대주택 구성재의 적정 수선주기 산정 연구 (Establishment of the Optimal Repair Cycle of the Components of the Rental Housing)

  • 이태경;채창우;이강희
    • KIEAE Journal
    • /
    • 제12권5호
    • /
    • pp.29-34
    • /
    • 2012
  • A rental housing has a key role to supply the living space to non-ownership. A public rental housing is particularly aimed at providing the living space for the low-income households with a low rent fee. Therefore, the local government would try to maintain the facilities of the rental housing and to get the decent living condition. For getting the required living condition, it should make a maintenance plan, which contains the repair time, repair scope and targeted component and finishings. This study is aimed at providing the optimal repair time in 12 components and components of the rental housing which is controlled by the local government. The optimal repair time has two steps to get the final result. First, it would draw the 1'st repair time with the probabilistic and empirical approach. Second, comparing the drawn data and the service life, the optima repair time would be provided with considering the components' attributes. Result are as follows : First, the optimal repair time would be considered with the component attributes. There are user's convenience, its safety and physical aspect. Second, the kitchen utensils, elevator and water tap has a optimal time of 16, 19, 17 years respectively which is considered with physical aspect. In addition, the optima repair time of the wiring appliance and lighting equipment are 12 years and 10 years respectively.

인텔리전트 빌딩의 제어 시스템 및 네트워크의 통합 시뮬레이션에 관한 연구 (A Study on The Integrated Simulation of The Intelligent Building Control Systems and Network)

  • 신진석;임동진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 추계학술대회 논문집 학회본부
    • /
    • pp.106-108
    • /
    • 1997
  • Many new office buildings are being built as intelligent buildings equipped with building automation(HA) systems, office automation(OA) systems, and telecommunication(TC) systems in order to provide pleasant building environment and the ease of maintenance and facility management. Building control systems which are employed in intelligent buildings require varieties of advanced control systems and network systems for efficient integrated management. Design and installation of these types of advanced building control systems take a lot of efforts and also they are costly. In order to design these systems, it is necessary for the designers to have the integrated simulator including proper network system simulation. In this paper, the integrated simulator that consist of HVAC system, lighting system, elevator system, parking system based on the network system is presented. For the development of integrated simulator, AHENA which is the general-purpose software tool for a simulation with reinforced GUI is used.

  • PDF

인텔리젼트 빌딩 제어 시스템의 통합 시뮬레이터 개발 (Development of Integrated Simulator for Intelligent Building Control Systems)

  • 배중원;임동진;홍승호;송규동
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.1199-1201
    • /
    • 1996
  • To Provide pleasant building environment and the ease of maintenance and facility management, many new office buildings are being built as intelligent buildings. Building control systems which are employed in intelligent buildings require advanced types of controllers and varieties of control schemes. Designing and installation of these types of advanced building control systems take a lot of effort and also they are costly. In order to design these systems, it is necessary for the designers to have means to analyze and estimate the performance of control systems. In this paper, the results of the simulator for HVAC and elevator system are presented as the first stage of the development of the integrated simulator. For the development of simulator, ARENA which is the general-purpose software tool for the simulation with reinforced GUI is used.

  • PDF

The Characteristics of the Repair Cost Distribution in Apartment Housing

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • 제15권6호
    • /
    • pp.19-26
    • /
    • 2015
  • Purpose: The repair would require to conserve and improve the building function and performance since built. Each household is responsible for maintaining the public facilities and paying the required cost. Therefore, it needs to get the tool or method to forecast the required cost in the future. Before the repair cost is provided, it needs to catch the repair cost distribution and provide the unit cost for the repair cycle. In this study, it aimed at providing the repair cost unit and analyzing the repair cost distribution in a roof proofing work, elevator work and building painting, which are divided into a fully work and partly change. Results of this study are shown that first, the average repair cost for roof proofing work is provided with $166.59{\times}10^3won/household$ and $1.59{\times}10^3won/m^2$ of a full change, $33.22{\times}10^3won/household$ and $0.33{\times}10^3won/m^2$ for a partly work. In addition, elevator work is $557.45{\times}10^3won/household$ and $5.38{\times}10^3won/m^2$ for a full change, $32.92{\times}10^3won/household$ and $0.56{\times}10^3won/m^2$ for a partly repair. Painting has a $304.48{\times}10^3won/household$ and $2.94{\times}10^3won/m^2$. Second, the distribution pattern of repair unit cost has a weibull-typed distribution which has a long tail to the right.

대중교통중심개발(TOD) 개선효과 진단을 위한 변동부등식기반 보행네트워크 평가모형 (A Variational Inequality-based Walkability Assessment Model for Measuring Improvement Effect of Transit Oriented Development (TOD))

  • 손지언
    • 대한토목학회논문집
    • /
    • 제36권2호
    • /
    • pp.259-268
    • /
    • 2016
  • 대중교통중심개발(TOD)을 위한 핵심전략은 철도역을 중심으로 보행권내에서 고밀도의 복합토지이용을 유도하는 방안을 마련하는 것이다. 해외에서는 이미 역세권을 중심으로 보행시설의 통합정비를 위한 제도를 마련하고, TOD를 효과적으로 추진해왔다. 그러나 국내는 종합적인 보행정비의 중요성에도 불구하고, 역세권 중심의 통합보행인프라 구축에 대한 방향설정이 부족하다. 따라서 우선 역세권 주변의 보행시설의 통합정비에 대한 평가기준을 마련하여 TOD 개선에 대한 판단근거로 활용하는 것이 시급하다. 본 연구는 TOD의 효과 평가를 위해 역사 건물내부와 주변지역을 통합하여 보행의 원활한 정도를 평가하는 네트워크 모형을 제안한다. 모형은 철도 역사와 주변지역을 일체화된 보행 네트워크 상의 흐름으로 간주한다. 보행자가 선택한 경로는 최소시간 경로라고 정의하여 Wardrop의 이용자 균형(1952) 개념을 확대 적용하였다. 보행통로의 혼잡상황, 엘리베이터의 용량한계, 횡단보도의 대기와 같이 보행시설에서 나타나는 다양한 행태를 고려하기 위해서 변동부등식기반의 보행자 균형배정모형을 제안한다.

접합부 상세에 따른 복합 병렬 전단벽 시스템의 구조 성능 (Structural Performance of Hybrid Coupled Shear Wall System Considering Connection Details)

  • 박완신;윤현도;김선웅;장영일
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제16권3호
    • /
    • pp.128-137
    • /
    • 2012
  • 복합 병렬 전단벽(Coupled shear walls)은 커플링 보와 철근콘크리트 벽체로 구성되어 바람이나 지진 등의 횡하중으로부터 유발된 전도모멘트의 상당 부분을 철골 연결보의 커플링 작용에 의하여 골조 작용(Frame action)을 의하여 횡력에 효율적으로 저항하게 된다. 본 연구에서는 접합부 상세에 따른 복합병렬 전단벽의 접합부 강도에 대한 규준식을 정립하기 위한 선행연구로서 병렬 전단벽 접합부에서 커플링 보의 매립길이 및 벽체 두께를 주변수로 실험적 연구를 수행하여 접합부 상세에 따른 복합 병렬 전단벽 시스템의 거동특성을 규명하고자 하였다. 본 실험결과, 실험체의 거동 및 내력은 매립길이 및 접합부 상세에 많은 영향을 받는 것으로 나타났으며 향후 설계시 이에 대한 영향을 반영해야 할 것으로 판단된다.

AHP 분석을 이용한 기계식 주차설비 건설 중 위험성 평가방안 연구 (Risk Assessment of Mechanical Parking Facility during Construction based on AHP Analysis)

  • 이정한;김용곤;이재원;김종훈
    • 한국안전학회지
    • /
    • 제37권5호
    • /
    • pp.33-41
    • /
    • 2022
  • As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.