• Title/Summary/Keyword: Elevation estimation

Search Result 282, Processing Time 0.026 seconds

Application of Cokriging for the Estimation of Groundwater Level Distribution at the Nanjido Waste Landfill Area (난지도 매립지 일대의 지하수위 분포 추정을 위한 복합 크리깅의 응용)

  • 정상용;이강근
    • Journal of the Korean Society of Groundwater Environment
    • /
    • v.2 no.2
    • /
    • pp.58-63
    • /
    • 1995
  • Cokriging was applied for the estimation of the water levels of the basal leachate and the surrounding groundwater at the Nanjido waste landfill area. When the groundwater level is estimated at the high relief area, it makes a good result to use the data of groundwater level and elevation simultaneously because groundwater level is correlated with topography. This study determined the best semivariogram model of 87 groundwater levels and 144 elevations through cross validation test, and produced the contour maps of groundwater levels using ordinary kriging and universal kiging. Two contour maps don't make big difference at the waste site because this area has a large number of groundwater level data. However, they show big difference at the upper left part of the study area because this area has high relief and a small number of sample data. Their difference is also found at the south area near the Han river. When the topography is considered for the both areas, the contour map of cokriging is thought to be closer to the real groundwater distribution than that of kriging.

  • PDF

Estimation of the Topographic Factor of Wind Speed Using GIS Information (GIS 정보를 이용한 풍속지형계수 산정)

  • Seong, Min-Ho;Choi, Se-Hyu
    • Spatial Information Research
    • /
    • v.19 no.5
    • /
    • pp.47-52
    • /
    • 2011
  • Recently damage scale by local winds and typhoon has dramatically increased. Korea has the terrain over 70% of the land and the planning of the wind load is necessary to estimate reflecting appropriately the change of the wind-speed according to the characteristic of the terrain and in the Korean Building Code(2009), this is stated and it reflects to the design process. However, in order to estimate the topographic factor of the wind speed considering the topographic characteristics in the structure design actually, it has many difficult points including the local topographic survey, etc. In this paper, the Digital Elevation Model(DEM) is created using TIN interpolation method in the form of the digital map and then the interface was designed and implemented which can automatically estimate the topographic factor of wind speed by using ESRI(R)ArcObjectTM and the Visual Basic programing language. By applying it to the terrain which positioned in the downtown area, the practicality of the topographic factor of wind speed estimation interface was checked.

Estimation of Fine-Scale Daily Temperature with 30 m-Resolution Using PRISM (PRISM을 이용한 30 m 해상도의 상세 일별 기온 추정)

  • Ahn, Joong-Bae;Hur, Jina;Lim, A-Young
    • Atmosphere
    • /
    • v.24 no.1
    • /
    • pp.101-110
    • /
    • 2014
  • This study estimates and evaluates the daily January temperature from 2003 to 2012 with 30 m-resolution over South Korea, using a modified Parameter-elevation Regression on Independent Slopes Model (K-PRISM). Several factors in K-PRISM are also adjusted to 30 m grid spacing and daily time scales. The performance of K-PRISM is validated in terms of bias, root mean square error (RMSE), and correlation coefficient (Corr), and is then compared with that of inverse distance weighting (IDW) and hypsometric methods (HYPS). In estimating the temperature over Jeju island, K-PRISM has the lowest bias (-0.85) and RMSE (1.22), and the highest Corr (0.79) among the three methods. It captures the daily variation of observation, but tends to underestimate due to a high-discrepancy in mean altitudes between the observation stations and grid points of the 30 m topography. The temperature over South Korea derived from K-PRISM represents a detailed spatial pattern of the observed temperature, but generally tends to underestimate with a mean bias of -0.45. In bias terms, the estimation ability of K-PRISM differs between grid points, implying that care should be taken when dealing with poor skill area. The study results demonstrate that K-PRISM can reasonably estimate 30 m-resolution temperature over South Korea, and reflect topographically diverse signals with detailed structure features.

Generation of 3D Building Model by Grouping of 3D Line Segments (3차원 선소의 Grouping에 의한 3차원 건물 모델 발생)

  • Kang, Yon-Uk;Woo, Dong-Min
    • Journal of IKEEE
    • /
    • v.10 no.1 s.18
    • /
    • pp.40-48
    • /
    • 2006
  • This paper presents a new rooftop surface estimation method from 3D line segments. 3D rooftop surface estimation is based on the hierarchical grouping and initiated by 3D line merging for the disconnected 3D line segments. Merged 3D lines are applied to the detection of rooftop by surface estimating technique. To estimate surfaces we detect L-corner and T-corner points, and find fixed reliable junction points. The hypothesis of the possible rooftop surfaces are estimated as polygonal surfaces by these fixed junction points and building's rooftop models are generated by testing the possible surfaces in terms of assumptions of building surface properties. We carried out experiments by synthetic images on Avenches data set and the experimental results showed that we could reliably build 3D model with 3D surfaces, errors of which came up with 0.4 - 1.3 meter, 2.5 times more accurate than the elevation date from the conventional area-based stereo.

  • PDF

A Case Study on the VE/LCC for selection on Improvement of Soft Soil Ground (연약지반처리공법 선정을 위한 VE/LCC 사례 분석)

  • Kim, Yong-Deuk;Lee, Young-Dae;Acharya, Nirmal Kumar
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.271-273
    • /
    • 2006
  • Because effect of value elevation is great as it is fast that construction VE is enforcement, VE at the design phase is more and more important more than construction process phase. But, is exerting negative impact for construction process phase by various problem that happen at design phase, and is causing discord to between project partners. Therefore, quality security in design phase is important first of all. Hereupon, this study emphasized that need VE at the design phase of extension plan forward more and more because achieved process that derive conceptional estimation by quantitative value calculating value index (V) through provision of design function point (F) and LCC expense (C) by comparison method of construction and chooses optimum method of construction through VE/LCC analysis example in improvement of soft soil ground method choice process of design phase.

  • PDF

TIMBER AGE ESTIMATION OF COMMERCIAL TIMBERLAND IN TENNESSEE, USA USING REMOTELY SENSED DATA

  • Lee, Jung-Bin;Kim, Sung-Hoon;Jayakumar, S.;Heo, Joon
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.449-451
    • /
    • 2007
  • In the commercially managed timber lands, the information such as height, age, stand density, canopy closure and leaf area index need to be collected periodically. Stand volume is the most fundamental information in the valuation of timber, however, stand age information is the primary element of forest inventory and these two are highly correlated. Conventional method of collecting stand age information by field surveys such as ring count method is accurate; however, it is expensive, labor-intensive and time consuming. In the present study it was aimed to collect stand age information using modem techniques in a commercially managed timberland situated in Tennessee, USA. The Landsat Thematic Mapper (TM), Enhanced Thematic Mapper (ETM+) of three different periods, Shuttle Radar Topography Mission (SRTM), National elevation dataset (NED) and field inventory data were used. Normalized difference vegetation index (NDVI) and Tasselled Cap (TC) transformation techniques were applied on the TM and ETM+ data. The regression analysis was carried out to identify the correlation between stand age and NDVI, TC. In the present study about 2,469 datasets were analyzed. The $R^{2}$ value for stand age estimation was 0.713. The NDVI, TC2 and TC3 were found to produce accurate timber age information.

  • PDF

Estimation of morphological change using waterline method in the Ganghwado tidal flats

  • Lee, Yoon-Kyung;Ryu, Joo-Hyung;Eom, Jin-Ah;Jo, Min-Jeong
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.22-24
    • /
    • 2007
  • Waterline extraction is the one of widely used methods for studying changes in tidal flat environment and coastlines using multi-temporal optical images such as Landsat TM and Landsat ETM+. High dynamics of tidal currents and land reclamation which accelerate sedimentation and/or erosion cause waterline change in tidal flats. The amount of sediment deposited or eroded can be evaluated by precisely estimating waterline changes in tidal flats. The objective of this study is to detect the change of waterlines during 17 years and analyze the trends of erosion and sedimentation in the study areas. The Ganghwado tidal flat on the west coast of the Korean Peninsula was selected. The study area is famous for high dynamics of tidal currents and vast tidal flats. Land reclamation which has been carried out on a large scale is also considered as one of elements that have accelerated the environmental changes in this tidal flat. In this study, we acquired 26 waterlines from Landsat TM and Landsat ETM+ images. We extracted the waterline from each satellite image to generate a digital elevation map (DEM) which was used for reference and to compare with the other waterline which was extracted from DEM having a same tide. The result of comparison well depicted the areas of dominant sedimentation and erosion, and general trends of sedimentation and erosion according to sub-regions are also revealed during the investigation time. Results showed that erosion during a decade was dominant at the west of the Southern Ganghwado tidal flat, while sedimentation was dominant at the wide channel between the Southern Ganghwado tidal flat and the Yeongjongdo tidal flat. This area has been commonly affected by high currents and sedimentation energy. Although we were not able to verify the accuracy of the waterline changes, this result clearly showed the waterline change and therefore, the waterline extraction method used in this study has proven as an effective tool for long term tidal change estimation.

  • PDF

Beach Profile Estimation Using a Photogrammetry (사진측정법을 이용한 해빈단면의 추정)

  • Kim, Baeck-Oon;Park, Yong-Ahn;Oh, Im-Sang;Khim, Boo-Keun;Choi, Kyung-Sik
    • The Sea:JOURNAL OF THE KOREAN SOCIETY OF OCEANOGRAPHY
    • /
    • v.3 no.4
    • /
    • pp.228-233
    • /
    • 1998
  • This study presents a close-range photogrammetry that is applicable to beach profile estimation using a non-metric camera. Based on the analysis of oblique video image in which the video camera was installed on a horizontal plane and the field of view was fixed, a new equation to analyze a photograph was developed considering the following aspects: (1) camera is allowed to be rotated about its optical axis and (2) a simple error model is adopted to correct lens distortion and other systematic errors associated with the non-metric camera, which improves accuracy of non-metric imageries. To test the modified technique, photographs of the beach were taken near the Donghae City in February, 1998. In addition, beach profiles were surveyed with conventional dumpy level and surveying staff. RMS error between the estimated and measured beach profiles is less than 10 cm in elevation.

  • PDF

Evaluation of HSPF Model Applicability for Runoff Estimation of 3 Sub-watershed in Namgang Dam Watershed (남강댐 상류 3개 소유역의 유출량 추정을 위한 HSPF 모형의 적용성 평가)

  • Kim, So Rae;Kim, Sang Min
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.3
    • /
    • pp.328-338
    • /
    • 2018
  • The objective of this study was to evaluate the applicability of a HSPF (Hydrological Simulation Program-Fortran) model for runoff estimation in the Namgang dam watershed. Spatial data, such as watershed, stream, land use, and a digital elevation map, were used as input for the HSPF model, which was calibrated and validated using observed runoff data from 2004 to 2015 for three stations (Sancheong, Shinan, Changchon) in the study watershed. Parameters for runoff calibration were selected based on the user's manual and references, and parameter calibration was done by trial and error. The $R^2$ (determination coefficient), RMSE (root-mean-square error), NSE (Nash-Sutcliffe efficiency coefficient), and RMAE (relative mean absolute error) were used to evaluate the model's performance. Calibration and validation results showed that annual mean runoff was within a ${\pm}5%$ error in Sancheong and Shinan, whereas there was a14% error in Changchon. The model performance criteria for calibration and validation showed that $R^2$ ranged from 0.80 to 0.92, RMSE was 2.33 to 2.39 mm/day, NSE was 0.71 to 0.85, and RMAE was 0.37 to 0.57 mm/day for daily runoff. Visual inspection showed that the simulated daily flow, monthly flow, and flow exceedance graph agreed well with observations for the Sancheong and Shinan stations, whereas the simulated flow was higher than observed at the Changchon station.

A Study on Estimation of Amount of Debris-Flow using Terrestrial LiDAR (지상 LiDAR를 이용한 토석류 발생량 산정에 관한 기초연구)

  • Jun, Kyewon;Jun, Byonghee;Ahn, Kwangkuk;Jang, Changdeok;Kim, Namgyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.3
    • /
    • pp.63-68
    • /
    • 2010
  • The purpose of this paper is estimating of the amount of debris flow in hazard area using terrestrial LiDAR surveying data. Jecheon area was selected for this study. Then, the surveyed LiDAR information of DEM and 1:5000 digital map of DEM have been compared with each other and the amount of debris flow has been estimated. The result of this study was shown that the amount of erosion was $24,150m^3$ and deposition was $14,296m^3$. Well shape of channelized debris flow, hillslope debris and deposition at the bending reach of a channel can be found in the area. This study on estimation of the amount of debris flow was expected to provide more informations for debris flow of disaster mitigation and simulation work.