Estimation of Electrical Loads Patterns by Usage in the Urban Railway Station by RNN (RNN을 활용한 도시철도 역사 부하 패턴 추정)

  • Park, Jong-young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1536-1541
    • /
    • 2018
  • For effective electricity consumption in urban railway station such as peak load shaving, it is important to know each electrical load pattern by various usage. The total electricity consumption in the urban railway substation is already measured in Korea, but the electricity consumption for each usage is not measured. The author proposed the deep learning method to estimate the electrical load pattern for each usage in the urban railway substation with public data such as weather data. GRU (gated recurrent unit), a variation on the LSTM (long short-term memory), was used, which aims to solve the vanishing gradient problem of standard a RNN (recursive neural networks). The optimal model was found and the estimation results with that were assessed.

A Study on the Analysis of Apartment Price affected by Urban Infrastructure System - Electricity Substation (도시기반시설이 공동주택가격에 미치는 영향분석에 관한 연구 - 전력통신시설(변전소)을 중심으로 -)

  • Hwang, Sungduk;Jeong, Moonoh;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.74-81
    • /
    • 2015
  • As one of urban infrastructure system, the electricity substation is critical for urban life and industrial activity as the electricity demands get higher than ever. However the substation is generally regarded as unpleasant or dangerous facility, which finally results in the continuous opposition movement by resident due to the belief of unidentified negative effect in apartment prices. Accordingly, as the scientifically objective and quantitative analysis is required to solve the social conflict, this study intends to examine the variation affected by urban infrastructure system, expecially for substation. After the independent variable defining the price of apartment and the dependent variable, which is apartment price, are identified and their spatial data has been filed, the forecasting model has been developed through the hedonic price function as well as artificial neural networks system. The research finding indicated that the spatial range affected by substation is not notable and the range of some case was applicable for less than 600m. It is expected that these research findings can be applied for establishing the one of solid cases for the analysis of economical effect to local housing market by the urban infrastructure system.

Failure Evaluation of The Digital Substation Based on Fault Tree Analysis (FTA에 기반한 디지털 변전소의 고장 분석)

  • Kim, Sung-Hun;Park, Ji-yeol;An, Yong-Ho;Kim, Seok-Kon;Lee, Seung-Hak;Lee, Dong-Ju
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.553-554
    • /
    • 2015
  • This paper presents the selection method of Minimal Cut Sets(MCS) for substation reliability evaluation. We used the Quality solution in order to model the FT for the substation equipment. Quantitative analysis is performed to estimate the probability of top event occurrence and unreliability of the substation component. In this result, it means that reliability indices which can be predict get electricity services and better maintenance in substation management.

  • PDF

A case study on the prevention and occurrence of fault in Transmission & Substation (변전설비의 보수 정비 사례 및 고장 실태 조사 연구)

  • Lee, Seog-Kyu;Park, Hee-Woo;Kim, In-Kun;Lee, Jong-Hak;Lee, Man-Seon
    • Proceedings of the KIEE Conference
    • /
    • 1999.11b
    • /
    • pp.83-85
    • /
    • 1999
  • Recently, a rapid increase of electricity demands have made Transmission & Substation device large-sized. complicated and diverse. Moreover, a rising level of customer's requirement and high growth of industry increase the reliability of electricity service. Therefore on the basis of the case study on the occurrence of fault, the prevention of defects for each device and the analyzing of the outbreak and prevention of systematic breakdown in Sin-Incheon Power Transmission Branch Office, this paper presents some important matters and suggests the method of improvement in design, construction, maintenance, and repairing the Transmission & Substation device.

  • PDF

Development of penetration rate model and optimum operational conditions of shield TBM for electricity transmission tunnels (터널식 전력구를 위한 순굴진율 모델 개발 및 이를 활용한 쉴드TBM 최적운전 조건 제안)

  • Kim, Jeong-Ju;Ryu, Hui-Hwan;Kim, Gyeong-Yeol;Hong, Seong-Yeon;Jeong, Ju-Hwan;Bae, Du-San
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.623-641
    • /
    • 2020
  • About 5 km length of tunnels were constructed by mechanized tunnelling method using closed type shield TBM. In order to avoid construction delay problems for ensuring timely electricity transmission, it is necessary to increase the prediction accuracy of the excavation process involving machines according to rock mass types. This is important to corroborate the project duration and optimum operation for various considerations involved in the machine. So, full-scale tunnelling tests were performed for developing the advance rate model to be appropriately used for 3.6 m diameter shield TBM. About 100 test cases were established and performed using various operational parameters such as thrust force and rotational speed of cuttterhead in representative uniaxial compressive strengths. Accordingly, relationships between normal force and penetration depth and, between UCS and torque were suggested which consider UCS and thrust force conditions according to weathered, soft, hard rocks. Capacity analysis of cutterhead was performed and optimum operational conditions were also suggested based on the developed model. Based on this study, it can be expected that the project construction duration can be reduced and users can benefit from the provision of earlier service.

Study on Analysis of Operating Characteristics of Motor Block While KTX is Moving at Neutral Section of Kyung-Bu High Speed Line (경부고속선 절연구간에서 KTX 운행중 모터블럭의 동작특성 분석)

  • Choi, Chang Hyun;Lho, Young Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.10
    • /
    • pp.1523-1527
    • /
    • 2015
  • Traction power is supplied by three-phase alternating current of 154 kV power grid and electric trains are operated on single phase feeding system. It becomes important to use all the three phases equally and convert them into two-phase electric power (90 degree phase rotation) for traction supply. This is achieved by special transformer from the adjacent traction substation which is separated by a neutral section. Neutral section locations are in front of the substation and between the two substations. The first stage of the Seoul-Busan high-speed railway, design curve radius is larger than 7,000 m and the greatest slope is 25‰. The railway track conditions are evaluated as good enough to install a neutral section at the first stage, but a few factors of coasting operation of the train should be considered at the second stage of Seoul-Busan high-speed railway. The neutral section was located at Kim-cheon substation, which made some neutral section problems produced by the operating train, and the neutral section was moved about 1.5 km to the south toward Dong Dae-gu station due to the track operation condition. Some of the trains which stopped at the existing Kim-cheon Gu-mi station produced another motor block failure after moving the neutral section. In this paper, power quality, system performance and track condition, etc. are suggested to solve the problems.

EMTP Simulation of 345kV Substation in Large Network Using Newly Developed Thevenin Equivalent Network (345kv 미금 변전소 외부 계통의 등가축약 기법을 이용한 EMTP 모델링에 관한 연구)

  • Kwon, Ki-Jin;Jeong, Ki-Seok;Seo, Gyu-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.14 no.3
    • /
    • pp.121-125
    • /
    • 2011
  • EMTP-RV is the very powerful program to analyze the dynamic operation of the power system. To use this package in the large complex power system, it is very important to simplify the power system to simple equivalent network. In our study the 100 MVA STATCOM is placed at 345kV "MIGUM" which is the one of the 345kV substations of the Korean Electric Power System that is consist of more than 1000-bus. MIGUM substation is connected with 7 separated transmission lines to main Korean Electric power system. We developed a new method to simplify the network except the substation that we want to analysis. The power system outside the 345kV substation is modeled into the equivalent network. The loop network outside the substation can be modeled to simplified Thevenin equivalent network. The proposed method is applied to IEEE-14 Reliability Test System and the results shows the effectiveness of the method.

Analysis of Harmonic Effects on Substation Power System and its Countermeasure (지하철 전력계통의 고조파 영향 분석 및 그 대책에 관한 연구)

  • Song, Jin-Ho;Hwang, Yu-Mo
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.51 no.4
    • /
    • pp.210-220
    • /
    • 2002
  • We analysised the effect of harmonics on electric machines of substation power system barred on quantitatively measured harmonics and proposed the methods for prevention of harmonics through checking on transformer, rectifier and cable's capacities against harmonics with reference to KEPCO's electricity service standard. In order to analysis harmoninics of silicon rectifier that is power source in DC substation, computer simulations for a substation with TR of high voltage distribution switchboard are performed. Simulation results show that the total harmonic distortion factor becomes smaller for TR primary and receiving points in order rather than silicon rectifier which is harmonic generation source so that the harmonics generated frets each rectifier are outflowed to power supply and high voltage distribution switchboard The result of higher distortion factors of voltage and current for rectifier with 100% load than those with 50 % and 30% indicates that the waveform of voltage and current for the real substation power system at the office-going and the closing hours with heavy loads might be more distorted. As proposed methods for harmonic reduction, the conventional 6 pulse-type for substation is required to be replaced by 12 pulse-type for reduction of 5th and 7th harmonics. The active filter rather than the passive filter is more effective due to severe variance of rectifier loads, but the high cost is price to be paid. In view of installation area and costs, the use of 12 pulse-type transformer is desirable and then the parallel transformer and the rectifier within the substation must be replaced at the same time. Other substations with parallel feeder can use 6 pulse-type transformer.

A Study on Loop operation of 154kV Substation Distribution line for Stable power supply (안정적 전력공급을 위한 154kV 변전소 배전선로간 연계운영에 관한 연구)

  • Kim, Kwang-Ho;Son, Myoung-Gwon;Jeong, Jong-Chan
    • Journal of Industrial Technology
    • /
    • v.29 no.B
    • /
    • pp.221-228
    • /
    • 2009
  • For a stable supply of electric power, periodical inspection of the electric facilities and repair of the distribution lines are required. In case of any unexpected accidents, looped operation among distribution lines may be necessary in order to supply electricity through the sound lines, separating the faulted lines. As a result of this study, it was found that normal looped operation became impossible when phase difference of the looped distribution lines is more than 3 degrees compared with the voltage supply of the distribution lines. Therefore, for a stable supply of electric power to Chuncheon, it is judged to be desirable that looped operation of the distribution lines coming from the same substation M. Tr Bank shall be performed in principle and in case of looped operation with the substation of different system, looped operation among the lines shall be performed after voltage regulation of the substation M. Tr Bank, maintaining similar voltages and load supply volume in order to avoid phase difference through checking the operation conditions of each substation M. Tr Banks. And when looped operation among the distribution lines is scheduled, voltage regulation schedule has been established so far by calculating maximum supply volume through the transformer of the substation and the maximum load volume through the distribution lines but in the future, looped operation of the distribution lines shall be carried out by removing voltage difference with regulating tap or load of the surrounding transformers, with giving prior notice to the substation operators.

  • PDF

Economic Evaluation of ESS in Urban Railway Substation for Peak Load Shaving Based on Net Present Value

  • Park, Jong-young;Heo, Jae-Haeng;Shin, Seungkwon;Kim, Hyungchul
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.981-987
    • /
    • 2017
  • In this paper, we estimate the economic benefits of Energy Storage Systems (ESSs) for peak load shaving in an urban railway substation using the annual cost. The annual investment cost of ESSs is estimated using Net Present Value (NPV) and compared with the cost reduction of electricity by the ESS. The optimal capacities of the battery and Power Converting System (PCS) are determined for peak load shaving. The optimal capacity of the ESS and the peak load shaving is determined to maximize the profit by the ESS. The proposed method was applied to real load data in an urban railway substation, and the results show that electric power costs can be reduced. Other aspects of the ESS, such as the lifetime and unit price of the battery, are also investigated economically.