• 제목/요약/키워드: Electricity Market, Hydro Generation

검색결과 5건 처리시간 0.017초

수력발전기의 경쟁적 입찰전략이 전력시장에 미치는 영향 (Effect of Bidding Strategies of Hydro Generation on an Electricity Market)

  • 이광호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권9호
    • /
    • pp.461-466
    • /
    • 2005
  • This paper addresses the bidding strategies of a hydro generator in an electricity market, and their effect on the electricity market in accordance with some parameters: the water volume, the demand elasticity, and the hydro unit performance. The competition of a hydro generator is formulated as a hi-level optimization problem, and the solving scheme for the equilibrium condition is proposed as a set of nonlinear simultaneous equations. The equilibrium of the oligopolistic model is evaluated by comparison with that of a perfect competition model from the viewpoint of a market power. Simulation results show some parameters have an influence on the market power of an electricity market including a hydro generator.

석탄화력 발전 대비 수력 발전에 대한 국민 선호도 분석 (Public Preferences for Replacing Hydro-Electricity Generation with Coal-Fired Power Generation)

  • 최효연;류문현;유승훈
    • 에너지공학
    • /
    • 제24권1호
    • /
    • pp.164-171
    • /
    • 2015
  • 석탄화력 발전은 기저발전원으로서 전력을 안정적으로 공급하는 역할을 해왔으나 전력을 생산하여 공급하는 과정에서 다양한 사회적 비용을 발생시킨다. 기후변화에 대응하기 위하여 석탄화력 발전의 비중을 낮추고 저탄소 발전원의 비중을 늘릴 필요가 있다. 이에 본 연구는 대표적인 재생에너지인 수력발전으로 석탄화력 발전의 전력생산을 대체하는 것에 대한 국민들의 지불의사액을 추정해 보고자 한다. 이를 위하여 비시장 재화를 대표하는 기법인 조건부 가치측정법을 적용하였으며, 영의 지불의사액(willingness to pay, WTP)을 명시적으로 다루기 위하여 스파이크 모형을 적용하였다. 분석결과, 석탄화력 발전으로 공급받는 전기를 수력 발전으로 대체하기 위한 국민들의 추가적 WTP 평균값은 1kWh당 약 54원으로 추정되었다. 이러한 연구결과는 발전원의 환경적 가치를 활용하는 연구 및 발전원 구성에 있어 중요한 참고자료로 활용될 수 있다.

전력시장에서 수력발전기의 입찰전략 분석 (Analysis on a Bidding Strategy of the Hydro Generation in an Electricy Market)

  • 신재홍;이광호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.807-809
    • /
    • 2005
  • This paper addresses the bidding strategies of a hydro generator in an electricity market, and their effect on the electricity market in accordance with some parameters: the water volume, the demand elasticity, and the hydro unit performance. The competition of a hydro generator is formulated as a hi-level optimization problem, and the solving scheme for the equilibrium condition is proposed as a set of nonlinear simultaneous equations. The equilibrium of the oligopolistic model is evaluated by comparison with that of a perfect competition model from the viewpoint of a market power.

  • PDF

기초지방자치단체별 보급 가능한 재생에너지 시장잠재량을 이용한 에너지 자립률 평가 (Assessment of Energy Self-sufficiency Ratio Based on Renewable Market Potentials for Unit of Local Government)

  • 김진영;강용혁;조상민;윤창열;김창기;김하양;이승문;김현구
    • 한국태양에너지학회 논문집
    • /
    • 제39권6호
    • /
    • pp.137-151
    • /
    • 2019
  • This study estimated the available renewable market potential based on Levelized Cost Of Electricity and then assessed the renewable derived energy self-sufficiency for the unit of local government in South Korea. To calculate energy self-sufficiency, 1 km gridded market renewable generation and local government scale of final energy consumption data were used based on the market costs and statistics for the recent three years. The results showed that the estimated renewable market potentials were 689 TWh (Install capacity 829 GW, 128 Mtoe), which can cover 120% of power consumption. 55% of municipalities can fully replace the existing energy consumption with renewable energy generation and the surplus generation can compensate for the rest area through electricity trade. However, it was confirmed that, currently, 47% of the local governments do not fully consider all renewable energy sources such as wind, hydro and geothermal in establishing 100% renewable energy. The results of this study suggest that energy planning is decentralized, and this will greatly contribute to the establishment of power planning of local governments and close the information gap between the central government, the local governments, and the public.

RPS(Renewable Portflio Standard) 제도 도입에 따른 국내 장기 전원구성 변화에 관한 연구 (A Study of the Long-term Fuel Mix with the Introduction of Renewable Portfolio Standard)

  • 이정인;한석만;김발호
    • 전기학회논문지
    • /
    • 제58권3호
    • /
    • pp.467-477
    • /
    • 2009
  • Renewable Portfolio Standard (RPS) is a regulatory policy that requires the generation companies to increase the proportion of renewable energy sources such as wind, solar, LFG, fuel cell, and small hydro. Recently, Korean government decided to increase the portion of renewable energy to 3% to total electricity generation by 2012 from the current level of 0.13%. To achieve this goal, an innovative plan for market competitiveness would be required in addition to the present Feed-In-Tariff (FIT). That is Korean government has taken it into consideration to introduce a Renewable Portfolio Standard (RPS) as an alternative to FIT. This paper reviews the impact of RPS on the long-term fuel mix in 2020. The studies have been carried out with the GATE-PRO (Generation And Transmission Expansion PROgram) program, a mixed-integer non-linear program developed by Hongik university and Korea Energy Economics Institute. Detailed studies on long-term fuel mix in Korea have been carried out with four RPS scenarios of 3%, 5%, 10% and 20%. The important findings and comments on the results are given to provide an insight on future regulatory policies.