• 제목/요약/키워드: Electricity Load

검색결과 515건 처리시간 0.026초

Choosing an optimal connecting place of a nuclear power plant to a power system using Monte Carlo and LHS methods

  • Kiomarsi, Farshid;Shojaei, Ali Asghar;Soltani, Sepehr
    • Nuclear Engineering and Technology
    • /
    • 제52권7호
    • /
    • pp.1587-1596
    • /
    • 2020
  • The location selection for nuclear power plants (NPP) is a strategic decision, which has significant impact operation of the plant and sustainable development of the region. Further, the ranking of the alternative locations and selection of the most suitable and efficient locations for NPPs is an important multi-criteria decision-making problem. In this paper, the non-sequential Monte Carlo probabilistic method and the Latin hypercube sampling probabilistic method are used to evaluate and select the optimal locations for NPP. These locations are identified by the power plant's onsite loads and the average of the lowest number of relay protection after the NPP's trip, based on electricity considerations. The results obtained from the proposed method indicate that in selecting the optimal location for an NPP after a power plant trip with the purpose of internal onsite loads of the power plant and the average of the lowest number of relay protection power system, on the IEEE RTS 24-bus system network given. This paper provides an effective and systematic study of the decision-making process for evaluating and selecting optimal locations for an NPP.

개선된 자기소호회로와 아크전압 억제회로를 사용한 유도성 부하의 직류차단 특성 실험 (Experiment on DC Circuit Breaker for Inductive Load by Improved Magnetic Arc-extinguisher and Arc-Attenuation Circuit)

  • 이성민;김효성
    • 전력전자학회논문지
    • /
    • 제17권6호
    • /
    • pp.495-499
    • /
    • 2012
  • Recently, DC distribution systems become hot issues since DC type loads increase rapidly according to the expansion of IT equipment such as computers, servers, and digital devices; DC type loads will cover 50% for all electricity loads in 2020 which was mere 10% in 2000. DC distribution systems are also accelerated by the expansion of renewable power systems since they are easy to be interfaced with DC grids rather than AC grids. However, removing the fault current in DC grids is comparably difficult since the current in DC grids has non zero-crossing point like in AC grids. Thus, developing dedicated DC circuit breakers for DC grids is necessary to get safety for human and electrical facilities. Magnet arc extinguishing method is proper to small size DC circuit breakers. However, simple Magnet arc extinguishing method is not enough to break inductive fault currents. This paper proposed a novel DC circuit breaker against inductive fault current defined by IEEE C37.14-2004 Standard for Low-Voltage DC Power Circuit Breakers Used in Enclosures. The performance of the proposed DC circuit breaker was verified by an experimental circuit breaker test system built in this research.

웹 기반의 전기품질 감시장치 개발 (Development of the Web based Power Quality Monitoring System)

  • 남기영;김호용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.28-30
    • /
    • 2002
  • The increasing application of electronic equipment has heightened the interest in power quality in recent years because there are economic impacts on utilities, customers, and suppliers of load equipment. The power quality would impose result in severe damage on many industrial customers. As having been supplied many kinds of electronic devices such as computer and communication equipment, automation equipment and various kinds of control devices etc., it comes to be more and more difficult to maintain the clean power quality. According to the restructuring in electricity industry the power quality may be treated as goods as contract terms and regulation elements between power supplier and consumer in the near future. Under the above environment, the power quality should be monitored for all day long with appropriate devices which is possible to measure and record the associated power quality data to prove each responsibility for the impacts when disputes arise due to power quality problems power quality problems are occurred. In this paper the authors propose some functions to be considered and system configuration to monitor the associated power quality elements in developing the web based power quality monitoring system.

  • PDF

천공상태에 따른 박막 BIPV 창호의 온도 및 발전특성 실측연구 (A Study on Optimum of Performance Objectives of Passive House with Load Reduction elements)

  • 김빛나;윤종호;신우철
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2012년도 춘계학술발표대회 논문집
    • /
    • pp.171-176
    • /
    • 2012
  • This research on building Integrated Photovoltaic System replacing windows and doors with amorphous silicon thin film PV windows and doors installing same exact mount on Mock-up. The windows and doors should be installed in different angle and bearing so that we can analyse the amount of electricity from them. The objective of the research is to evaluate and investigate the relationship between factors(intensity of solar radiation, PV window surface temporature, incidence angle, and sky conditions) that affects performance of PV window and performance. The range and method of this research is to establish mornitoring system and analysis the date from the mornitoring system to evaluate the performance of PV windows that has thin film of solar battery. We should evaluate the insolation according to the position of PV window, output, and surface temperature according to months and seasons so that we can figure out the relationship between these. And we should investigate the relationship between performance and efficiency according to incidence angle and sky condition so that we can figure out the correlation between factors and performance.

  • PDF

소형열병합발전 최적 시스템 설계 시뮬레이션 (A Simulation Study for the Optimum Design of Cogeneration System)

  • 임용훈;박화춘;최영호;정모
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.325-331
    • /
    • 2009
  • In this paper, a simulation approach for the optimum design of cogeneration system is described. For the purpose of the systematic analysis, a simulation tool is developed with which the prediction of the energy load, calculation of operation data according to prime mover or capacity of it, and estimation of economic gains can be carried out. As for the criterion of the optimum design, the economic gains by adopting cogeneration system is taken. Based on the capital, operation, and maintenance costs etc, LCC analysis is to be carried out for the scenarios respectively. In this study, the simulation for the apartment complex is performed and the analysis of the results are described in detail. The effects of the operation parameters such as capital cost, fuel cost, and unit cost for the purchase or sale of heat and electricity on overall economy are also be considered by sensitivity study.

  • PDF

아치형 해저 케이블 보호 구조물의 앵커 충돌 수치 시뮬레이션 (Numerical Simulation of Arch-type Submarine Cable Protector under Anchor Collision)

  • 우진호;나원배;김헌태
    • 한국해양공학회지
    • /
    • 제23권1호
    • /
    • pp.96-103
    • /
    • 2009
  • In 2006, Jeju Island in South Korea experienced a crisis, no electricity for three hours anywhere in the entire island. This incident was caused by a domino effect that occurred after one of the submarine power cables connecting the island to Haenam, a coastal city on the mainland, was damaged by an external load, probably from a ship anchor or a steel pile being used in marine farming. This study presents a collision analysis of a new submarine power cable protector called arch type reinforced concrete. For the analysis, a dynamic finite element program, ANSYS AUTODYN, was used to examine the displacement and stress of the submarine power cable protector using different material models (RHT concrete model, Mohr.Coulomb concrete model). In addition, two reinforcing bar spacings, 75 mm and 150 mm, were considered. From the analyses, the effects of the parameters (concrete model and spacing) on the results (displacement and stress) were analyzed, and the relations between the damage and parameters were found.

광전자소자를 위한 Piezo-Phototronic 효과의 연구 동향 (Recent Advances in the Piezo-Phototronic Effect for Optoelectronics)

  • 신경식;김성수;김도환;윤규철;김상우
    • 한국세라믹학회지
    • /
    • 제50권3호
    • /
    • pp.173-179
    • /
    • 2013
  • Wurtzite nanomaterials, such as ZnO, GaN, and InN, have become a subject of great scientific and technological interest as they simultaneously have piezoelectric and semiconductor properties. In particular, the piezoelectric potential (piezopotential) created by dynamic straining in the nanowires drives a transient flow of current in the external load, converting mechanical energy into electricity. Further, the piezopotential can be used to control the carrier generation, transport, separation, and/or recombination at the metal-semiconductor junction or p-n junction, which is called the piezophototronic effect. This paper reviews the recent advances on the piezophototronic effect to better use the piezophototronic effect to control the carrier generation, transport, separation and/or recombination for improving the performance of optoelectronic devices, such as photon detectors, solar cells and LEDs. This paper also discusses several research and design studies that have improved the output performance of optoelectronic devices.

3MW급 IEC Wind Class IIa 풍력발전시스템 개발 (Development of 3MW Wind Turbine for IEC Wind Class IIa)

  • 이기학;이상일;우상우;오인규;박종포
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2011년 춘계학술대회논문집
    • /
    • pp.236-239
    • /
    • 2011
  • This paper introduces the design concepts and characteristics of WinDS3000$^{TM}$(TC IIa) which is a trade name of Doosan's 3MW offshore/onshore wind turbine. WinDS3000$^{TM}$(TC IIa) has been designed in consideration of high Reliability, Availability, Maintainability and Serviceability (RAMS) and low cost of electricity (CDE) for the TC IIa condition based on GL guideline. An integrated drive-train design with an innovative three-stage gearbox has been introduced to minimize nacelle weight of the wind turbine and to enhance a high reliability for transmission. A permanent magnet generator with full converter system has been introduced to get higher efficiency in partial load operation and grid-friendly system for both 50 Hz and 60 Hz. A pitch-regulated variable speed control system has been introduced to control wind turbine power while generator reaction torque can be adjusted almost instantaneously by the associated power electronics. The wind turbine has been also equipped with condition monitoring and diagnostic systems in order to meet maintainability requirements.

  • PDF

전력산업 구조개편에 대비한 적정 TRM 및 ATC 결정에 관한 연구 (A Study of TRM and ATC Determination for Electricity Market Restructuring)

  • 이효상;최진규;신동준;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권3호
    • /
    • pp.129-134
    • /
    • 2004
  • The Available Transfer Capability (ATC) is defined as the measure of the transfer capability remaining in the physical transmission network for further commercial activity above already committed uses. The ATC determination s related with Total Transfer Capability (TTC) and two reliability margins-Transmission Reliability Capability (TRM) and Capacity Benefit Margin(CBM) The TRM is the component of ATC that accounts for uncertainties and safety margins. Also the TRM is the amount of transmission capability necessary to ensure that the interconnected network is secure under a reasonable range of uncertainties in system conditions. The CBM is the translation of generator capacity reserve margin determined by the Load Serving Entities. This paper describes a method for determining the TTC and TRM to calculate the ATC in the Bulk power system (HL II). TTC and TRM are calculated using Power Transfer Distribution Factor (PTDF). PTDF is implemented to find generation quantifies without violating system security and to identify the most limiting facilities in determining the network’s TTC. Reactive power is also considered to more accurate TTC calculation. TRM is calculated by alternative cases. CBM is calculated by LOLE. This paper compares ATC and TRM using suggested PTDF with using CPF. The method is illustrated using the IEEE 24 bus RTS (MRTS) in case study.

저속영역에서 속도검출기가 없는 유도전동기의 강인성 적응제어 시스템 (Robust Adaptive Control System for Induction Motor Drive Without Speed Sensor at Low Speed)

  • 김민회
    • 한국산업융합학회 논문집
    • /
    • 제2권2호
    • /
    • pp.91-102
    • /
    • 1999
  • The paper describes a robust adaptive control algorithm for induction motor drive without speed sensor at low speed range. The control algorithm use only current sensors in a space vector pulse width modulation within loop control with rotor speed estimation and voltage source inverter. On-line rotor speed estimation is based on utilizing parallel model reference adaptive control system. MRAC of the modified flux model for flux and rotor speed estimator uses dual-adaptation mechanism, ${\omega}_r$ and ${\omega}_e$ scheme. The estimated flux components in the model can be compensated from the effects of offset errors on pure integrals. It can be compensated to the parameter variations and torque fluctuation with speed estimation in less then 10 rad/sec. In a simulation, the proposed induction motor control algorithm without speed sensor at very low speed range are shown to operate very well in spite of variable rotor time constant and fluctuating load without change the controller parameters. The suggested control strategy and estimation method have been validated by simulation study, and it proposed the designed system for the implementation using TI320C31 DSP/ASIC controller.

  • PDF