In this paper, a new load flow algorithm is proposed on the basis of distributed load modeling in radial distribution networks. Since the correct state data in the distribution power networks is basic for all distribution automation algorithms in the Distribution Automation System (DAS), the distribution networks load flow is essential to obtain the state data. DAS Feeder Remote Terminal Units (FRTUs) are used to measure and acquire the necessary data for load flow calculations. In case studies, the proposed algorithm has been proven to be more accurate than a conventional algorithm; and it has also been tested in a simple radial distribution system.
Kim, DongWook;Cho, SungHo;Seo, Hojin;Park, YoungBae
KEPCO Journal on Electric Power and Energy
/
v.5
no.2
/
pp.67-74
/
2019
Recently, as the renewable distributed energy resources has increased, the variability within the electrical power distribution system has increased, so that there is a growing concern about the stable electrical power distribution system. For efficient management of future electrical power distribution system, it is necessary to improve the electrical power distribution system operation using new visualization technology. In this paper, we describe the current status of GIS introduction and related technology trends in the field of electrical power distribution, and analyze the necessity of GIS system for electrical power distribution system operation and problems to be solved when introducing GIS technology.
Transmission system has been well studied since long time and power system techniques of distribution system are more or less derived from transmission system. However, unlike transmission systems, many practical issues are encountered in the distribution system. Considerable amount of error is observed in voltage obtained from the Feeder Remote Terminal Units (FRTUs) measured by the pole mounted PTs along the distribution feeder. Load uncertainty is also an issue in distribution system. Further, penetration of Distributed Generators (DGs) creates voltage variations in the system. Hybrid radial/ loop distribution system also make it complicated to handle distribution system. How these constraints to be handled under Distribution Automation (DAS) environment in order to obtain error free voltage is described in this paper and therefore, a new approach of voltage error correction technique has been proposed. The proposed technique utilizes reliable data from substation and the FRTUs installed in DAS. The proposed technique adopts an iterative process for voltage error correction. It has been tested and proved accurate not only for conventional radial systems but also for loop distribution systems.
Effects of metal impurities in insulation of distribution cables on electrical conduction of distribution cables was investigated. Samples of Al, Cu, Fe are fabricated as metallic impurities, and measured electrical conductivity in the voltage range of 0~10 KV. Temperature dependent effect of hysteresis curves and the relationship between forward and reverse current due to impurity content are discussed.
KIEE International Transactions on Power Engineering
/
v.2A
no.3
/
pp.102-108
/
2002
Due to the many attractive aspects of DG in the future power distribution system, distribution automation will be a center hub of integration of the distribution system and resources to satisfy the various needs of customers in a competitive and deregulated environment. In this paper, operation strategies are presented which use network reconfiguration of the automated distribution systems with DG as a real-time operation tool for loss reduction and service restoration from the view of distribution operation. The algorithms and operation strategies of an automated distribution system with DG are introduced to achieve the positive effects of DG in distribution systems. A simple case study shows the effectiveness of the proposed operation strategies.
Park, Jeong-Eun;Kim, Hyung-Seung;Choi, Myeon-Song;Lee, Seung-Jae;Lim, Seong-Il;Hyun, Seung-Ho
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.8
/
pp.1317-1325
/
2016
This paper identifies the issues of contingency analysis for restoration in distribution systems. Contingency analysis has been applied to transmission systems but not to distribution systems. The distribution system is different from transmission system. So it is hard to apply for existing contingency analysis to distribution system. In this paper, a new contingency analysis method for distribution systems is proposed. The proposed method is based on service restoration capability. It aims to minimize outage left after service restoration in case of a fault in advance. The method estimates the vulnerability which is represented by zone restoration index proposed in [1]. Applying the proposed method, operators could change the system so that it does not leave any outage left after restoration. Case study has been carried out on a five feeder system and its results show effectiveness of the method.
Park, Sang-Bong;Nam, Kee-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Ryoo, Hee-Suk
KIEE International Transactions on Power Engineering
/
v.4A
no.1
/
pp.11-17
/
2004
It becomes difficult and high in cost to construct new ducts and/or tunnels for power cables in domestic areas. This paper presents possible strategy of an HTS distribution cables for distributing electric power in local areas as niche marketing. Reflected were its important distinction such as system configuration, rationale, establishment of strategy and considerably high economical efficiency compared with present underground cables. In this paper, applicable important items by using HTS distribution cables in water pumping powerhouse and distribution substation as example objective regions were reviewed. Based on this, the following items on distribution HTS system are examined. (I)A review of constructing a model system to introduce high temperature superconducting distribution cables to objective areas is presented. (2)The strategy to capture HTS distribution cable in water pumping powerhouse and distribution substation as niche marketing regions were reviewed. (3)In concrete, system configuration, rationale, establishment of strategy and considerably high economical efficiency are reviewed between existing cable and HTS one.
The Transactions of the Korean Institute of Power Electronics
/
v.22
no.4
/
pp.353-359
/
2017
To take advantage of electric propulsion, several large vessel kinds, namely, cruise vessels, icebreakers, drill ships, and warships, have been generally designed with Integrated Power System (IPS). Although most of these vessels have adopted AC distribution IPS, DC distribution IPS ships have recently emerged as a new promising technology thanks to the availability of the products related to the DC distribution system, in which the system's major advantages over AC distribution are reduced weight and fuel consumption. This paper presents the comparison results of a 10-t class fishing boat for the AC distribution and DC distribution cases. By replacing AC distribution system with DC distribution, 31-41% reduction in the weight of the electrical equipment weight and 20-25% reduction in the fuel consumption are expected.
This paper proposes a reduced-scale simulator that can replace numerical analytic methods for the estimation of potential distribution caused by ground faults in various grounding systems. The simulator consists of a hemispherical electrolytic tank, a three-dimensional potential probe, a grounding electrode, and a data acquisition module. The potential distribution is measured using a potentiometer with a position-tracing function when a test current flows to the grounding electrode. Using the simulator, we could clearly analyze the potential distribution for a reduced- scale model by one-eightieth of the buried depth and length of the grounding rod and grounding grid. Once both the shape of the grounding electrode and the fault current are known, the actual potential distribution can be estimated.
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.4
/
pp.474-481
/
2013
It is anticipated that AC distribution system can be replaced by DC distribution system in the near future because of the operation of various distributed source or microgrid system. However DC distribution system replacing 22.9kV AC distribution line is not sufficiently studied still. This paper describes lightning overvoltage analysis among many research fields should be studied to realize DC overhead distribution systems. DC distribution system is modeled using EMTP and overvoltage is analyzed according to interval of arrestor location, earth interval of overhead grounding wire and grounding resistance. It is evaluated that analysis results can be effectively used to design of future DC distribution system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.