765kV substations which will be the core installation of the bulk power transmission system in Korea for the upcoming $21^{st}$ century, were designed of outdoor full GIS type to minimize required area. As principal equipment, main transformers of 2,000 MVA per bank and 50kA 8,000A gas insulated switchgears of up-to-date technology were adopted in designing substations to transmit bulk power of 10GW. Dual digital protective relay systems and distributed indication and control systems with fiber optic LAN were used.
Chang, B.H.;Choo, J.B.;Lima, Leonardo T.G.;Feltes, James W.
KIEE International Transactions on Power Engineering
/
v.3A
no.3
/
pp.168-176
/
2003
The Korea Electric Power Corporation (KEPCO) has installed an 80 MY A Unified Power Flow Controller (UPFC) at its 154㎸ 'Kang-Jin Substation in South Korea. The device, manufactured by Siemens & Hyusung, has been operational since October 2002. The Korea Electric Power Research Institute (KEPRI), a division of KEPCO was tasked to study operational strategies that could be employed for the UPFC and surrounding reactive support devices concerning problems of low voltages and overloads in the Mokpo & Gwangju areas. Particular apprehension surrounded the possibility of delay in the installation of a new 345㎸ transmission line from 2005 to beyond 2010. The studies were to specifically determine whether these problems could be eliminated by application of a UPFC. The analysis included determining the UPFC operating point under various conditions, investigations of the coordination between the UPFC and a HYDC line terminating in this area, and the design of a supplementary damping controller for the UFPC. This paper summarizes the results of those studies, demonstrating the dynamic characteristics of the operation of this UPFC operation in the Korean power system.
In this paper, we analyze about voltage sag effect at load side during fault according to change of power system condition. through the case studies, we find that there is no close connection between substation bus transfer and voltage sag during fault. however, we find that other feeder connecting with the faulted transmission is directly affected by fault type and magnitude, therefore, the main subject can be divided into the utility and customer side countermeasures, utilities concentrate their effort to prevent the faults and to modify the fault clearing practice in power system. however, the faults in power system can never be completely eliminated. therefore, customer side solutions usually involve the power conditioning equipment for sensitive loads aiso, we investigate that the several methods to reduce the number and severity of voltage sag and to dull the sensitivity of equipment for voltage sag have developed. moreover, about SEMI, the industry association for the semiconductor two voltage sag immunity standards.(SEMI F47, SEMI F42) The simulation is accomplished by PSS/E 26.
TETRA is the standard of Digital Trunked Radio System suggested by the ETSI(European Telecommunications Standards Institut ). It is adopted as Electric Power IT Wireless Backbone Network in Korea. Police station and Fire Station are using TETRA network. Currently, Power Automation Protocols are DNP3.0 in Distribution Automation System, DLMS in Auto Metering Infrastructure, IEC61850 in Substation Automation. These protocols are transmissions using CDMA or WCDMA modem. If Power Automation protocol uses TETRA networks, it can be interoperable with the systems in police or fire stations. And it has outstanding ability to handle problems in a disaster situation. So, This paper propose a gateway system of Power Automation which can transmit the power automation protocol using TETRA.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.1
/
pp.1-7
/
2007
Generally, an electric railroad feeding system has many problems due to the different characteristics in contrast with a load of general three-phase AC electric power system. One of them is harmonics problem caused by the switching device existing in the feeding system, and moreover, the time-varying dynamic loads of rail way is inherently another cause to increase this harmonics problem. In Korea power systems, the electric railroad feeding system is directly supplied from the substation of KEPCO. Therefore, if voltages fluctuation or unbalanced voltages are created by the voltage and current distortion or voltage drop during operation, it affects directly the source of supply. The trainloads of electric railway system have non-periodic but iterative harmonic characteristics as operating condition, because the electric characteristic of the electric railroad feeding system is changed by physical conditions of the each trainload. According to the traditional study, the estimation of harmonics has been performed by deterministic way using the steady state data at the specific time. This method is easy to analyze harmonics, but it has limits in some cases which needs an assessment of dynamic load and reliability. Therefore, this paper proposes the probabilistic estimation method, moments matching method(MW) in order to overcome the drawback of deterministic method. In this paper, distributions for each harmonics are convolved to obtain the moments and cumulants of TDD(Total Demand Distortion), and this can be generalized for any number of trains. For the case study, the electric railway system of LAT(Intra Airport Transit) in Incheon International Airport is modeled using PSCAD/EMTDC dynamic simulator. The raw data of harmonics for the moments matching method is acquired from simulation of the LAT model.
The Load characteristic of electric railway requires the power demand of the high capacity which amplitude is spacial-temporally fluctuated due to frequent starting and stopping with large tractive force. The conventional electric railway mainly consists of the resistance controlled and the thyristor controlled locomotives, are compensated for their bad characteristics of the power factor$(70\sim80%)$ with installation of another capacitor improving power factor at the substation. Since 1994, VVVF train car with good characteristics of power factor(100%) have been introduced and operated in Kwa-Chon Line. From the present technical tendency, it is judged that introduction of the locomotive with various controlled methods is necessary. The protective equipments installed at the substation are complicated and various aspects to detect faults and reduce their extension, so the universal countermeasures are required. Specially in the case of the fault occurrence it is difficult to calculate the fault location because of the change in the contactline constant according to modifying the characteristics of the contactline (the dualized catenary wire and extension, etc), so much time is required for the detection of fault location. In BT-fed method distance-relays and fault-locators are not installed, we have so many difficulties in the quick accident recovery.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.1
/
pp.75-81
/
2007
This paper dealt with the design and implementation of an expert system to monitor and diagnose the lightning arresters in GIS substations. The expert system consists of a data acquisition module(DAM) based on microprocessor and diagnostic algorithms. The DAM measures and analyzes several parameters necessary for the arrester diagnosis such as system voltages, leakage current components, and temperatures. Also, it includes an intelligent surge counter which can record the date and tin, the polarity, and the amplitude of surge currents. All the data acquired is transmitted to a remote computer by a low rate wireless network specified in IEEE 802.15.4 to avoid electromagnetic intereference under high voltage and large current environments. The decision-making for the arrester diagnosis completes with a Java Expert System Shell(JESS) which is composed of a knowledge base, an inference engine and a graphic user interface(GUI).
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.6
/
pp.160-168
/
2010
This paper presents the analysis of the current as stray current and supplied current of the substation, on the DC railway power system. In DC railway power supply system, the running rails are usually used as the return conductor(negative-polarity) for traction load current. This condition mainly focuses on economic considerations, since it does not require the installation of an additional return conductor. But, problems of low resistance between the running rails for the return conductor and earth allows a significant part of the return load current to leak into the earth. This current is normally called to as leakage or stary current. This stary currents creates serious problems for any electrified matter in the underground. Therefore, reduction of stray current of the DC railway power supply system is also of direct benefit to the operational and safety aspects of the DC railway systems. In this paper, deal with the analysis of the current distribution on the DC railway power system applied the common grounding system, using SPLIT of CDEGS program.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.20
no.1
/
pp.41-47
/
2006
This paper presents harmonic evaluation of an IAT(Intra Airport Transit) system in Incheon International Airport. It will be used for electric vehicles with 80[kW] per car produced by Mitsubishi Heavy Industries Ltd, and which is constructed with SIV(Static Inverter), VVVF controller and two induction motor. The vehicles operated in the IAT system can be treated as rapidly changing DC loat and at a feeding substation, 3-phase electric power is transferred to DC 750[V] by rectifier. Since vehicles are changing continuously, the voltages for the load fluctuate in the IAT system, and moreover, the voltage fluctuation generates high-order harmonics. It results the difficulty in maintaining power quality in KEPCO systems' side. The power quality of the IAT system in Incheon International Airport is evaluated using PSCAD/EMTDC simulator in the paper. The THD(Total Harmonic Distortion) of voltages and TDD(Total Demand Distortion) of currents, indices are calculated for the IAT system using the results of PSCAD/EMTDC dynamic simulation.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.2
/
pp.51-56
/
2008
High quality power supplying of high voltage distribution lines electric railway system is the important function, high voltage distribution system is complicated witch is compose with distribution line, circuit break, protection facilities and so on. Among this components, role of substation is most important for elevation of reliability in electric power system. Therefore, the enhanced reliability considering the preventive inspection, repair work replacement is necessary. This paper proposes protection method in railway high voltage distribution lines. we model distribution system using PSCAD/EMTDC(Power System Computer Aided Design/Electro Magnetic Transients DC Analysis Program) and extract various fault data. In conclusion this methods can protection of ground fault.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.