• Title/Summary/Keyword: Electrical Load Testing System

Search Result 66, Processing Time 0.032 seconds

Developement of Electrical Load Testing System Implemented with Power Regenerative Function (회생전력 기능을 갖는 전기부하시험장치 개발)

  • Do, Wang-Lok;Chai, Yong-Yoong
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.2
    • /
    • pp.179-184
    • /
    • 2016
  • The electrical load testing system developed from this study was designed to control rated-capacity-testing or variable-load-testing in an active and precise manner and save electric energy during testing, and also to convert the saved electric energy through the electrical load testing system to grid line. As for the device under testing, it was designed to be applied to not only transformer, rectifier, voltage regulator, inverter which require grid voltage source but, also applied to electric power, aerogenerator, photovoltaic, hybrid generator, battery, etc. which do not require grid voltage source. The system was designed to return the power consumed during the testing to the grid line by connecting the synchronizing pwm inverter circuit to the grid voltage source, and was also made to enable the being-tested system from disuse of approximately 93.4% energy when compared to the conventional load testing system which has used the passive resistor.

A Study on the Construction of Test circuit and Unification of Experiment Method for High Voltage Gas-insulated Load Switch using High Power Testing System (특고압 가스 절연 부하 개폐기의 통합형 대전력 시험 방법 및 회로 구성에 관한 연구)

  • Jung, Heung-Soo;Kim, Min-Young;Kim, Juen-Suk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.12
    • /
    • pp.36-46
    • /
    • 2008
  • This paper is to study on the Construction of Test circuit and Unification of Experiment Method for high voltage gas-insulated load switch using high power testing system The high power testing system is a equipment to verify electrical and mechanical performance on electrical product. The system consist of short-circuit generator, back-up breaker, making switch, impedance, high voltage transformer, low voltage transformer, measuring and protection system, etc. Using this system, we can test related to high power, for example, short-time current test, active load Current test, magnetizing Current test, capacitive current test, closed loop current test, etc. Standards of high voltage gas-insulated load switch that is in use domestic distribution line are ES 5925-0002, IEC 60265-1, IEC 62271-1 and IEEE C 37.74, etc. In this paper, we standardized on the test procedure, organization of test circuit and analysis of measured data prescribed many difference standards, and applied this test method to 600[MVA] high power testing system. So that we can test the load switch satisfied standards.

Development of a Multiple SMPS System Controlling Variable Load Based on Wireless Network

  • Ko, Junho;Park, Chul-Won;Kim, Yoon Sang
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.3
    • /
    • pp.1221-1226
    • /
    • 2015
  • This paper proposes a multiple switch mode power supply (SMPS) system based on the wireless network which controls variable load. The system enables power supply of up to 600W using 200W SMPS as a unit module and provides a controlling function of output power based on variable load and a monitoring function based on wireless network. The controlling function for output power measures the variation of output power and facilitates efficient power supply by controlling output power based on the measured variation value. The monitoring function guarantees a stable power supply by observing the multiple SMPS system in real time via wireless network. The performance of the proposed system was examined by various experiments. In addition, it was verified through standardized test of Korea Testing Certification. The results were given and discussed.

The estimation of uncertainty in new measuring system used for high-power tests (대전력시험의 새로운 측정시스템에 대한 불확도 평가)

  • Suh, Yoon-Taek;Kim, Maeng-Hyun;Kim, Dae-Won;Kang, Young-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.540-542
    • /
    • 2003
  • In the high-power tests to be performed on electrical apparatus as circuit-breaker, load switch, fuse, transformers, insulators, cable and so on, the results of tests on these apparatus are extremely important to evaluate the performance of test object. The reliability of the results depends on the reliability of measuring systems used in the laboratories where tests are performed. This paper deals with factors of uncertainty and describes estimation of uncertainty in new measuring system used in high-power testing LAB. 1 in KERI.

  • PDF

Novel Claw Pole Eddy Current Load for Testing DC Counter Rotating Motor - Part II: Design and Modeling

  • Kanzi, Khalil;Roozbehani, Sam;Dehafarin, Abolfazl;Kanzi, Majid
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.1 no.4
    • /
    • pp.412-418
    • /
    • 2012
  • Eddy current brakes are electromechanical devices used as variable mechanical loads for testing electrical machines. Accurate modeling of eddy current loss is an important t factor for optimum design of eddy brake systems. In this second part, we propose novel formulations of eddy current loss in novel claw-pole eddy brake system. The proposed model for eddy current loss in novel claw-pole eddy brake system depends on the size of the claw poles. Also, in this paper, the flux density is measured by using the magnetic circuit of the novel claw pole. The model results are compared with experimental results and they are found to be in good agreement.

Reliability testing equipment for SF_6 gas load break switch (가스절연부하개폐기의 신뢰성 평가장비)

  • Heo J.C.;Park S.J.;Kang Y.S.;Koh H.S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.560-562
    • /
    • 2004
  • $SF_6$ gas has been increasingly used as the insulating and arc-suppressing medium in switchgears which are used as the protection devices of power system. Nowadays, most of power companies adopted the $SF_6$ gas-type load break switch for increasing the reliability of distribution network by its superior durability against external environmental condition, in substitution for air-type and oil-type switches. But, it is important to establish the general estimation process for the testing and estimation for long-term reliability Accordingly, the national standard(RS C0031) was made for the reliability assessment of $SF_6$ gas load break switch and the testing facilities were also set in KERI(Korea Electrotechlology Research Institute). This paper presents the requirements of RS C0031 for reliability assessment of $SF_6$ gas load break switch and synopsis of the accelerated life testing facilities for $SF_6$ gas load break switch.

  • PDF

Development of Disturbance Power Supply (외란공급 전원장치 개발)

  • Ji, P.S.;Lee, J.P.;Lim, J.Y.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.363-365
    • /
    • 2002
  • The characteristic responds of load respect to various disturbances which can usually be occurred on actual power system is very important to analyze performance and to improve load with high-technology. The disturbance power supply is designed to provide wide range of power to testing load. This device uses PLC technology to dynamic characteristic experiment and CVVF to change frequency. Also this instrument includes data acquisition system to obtain reliable data from experiment.

  • PDF

An Automated System for Constant ${\Delta}K_{eff}$ Fatigue Crack Growth Testing through Real-time Measurement of Crack Opening Load (${\Delta}K_{eff}$ 제어 피로 균열 진전 시험 자동화 시스템에 관한 연구)

  • Shin, Sung-Chul;Song, Ji-Ho
    • Proceedings of the KSME Conference
    • /
    • 2001.06a
    • /
    • pp.447-452
    • /
    • 2001
  • An automated system is developed to perform fatigue crack growth tests under constant effective stress intensity factor range ${\Delta}K_{eff}$. In the system, crack length and crack opening load are measured in real-time by using the unloading elastic compliance method. The system consists of two personal computers, an analogue electrical subtraction circuit, a stepping motor, a stepping motor driver, a PIO board, and the application software used to integrate the whole system. The performance of the developed system was tested and discussed performing constant ${\Delta}K_{eff}$ crack growth tests on a CT specimen of 7075-T6 aluminum alloy. The performance of the system is found to be strongly dependent on the accuracy of measurements of crack opening load. Besides constant ${\Delta}K_{eff}$ testing, the system is expected to be successfully applied for automation of various fatigue tests.

  • PDF

Reliability Engineering Approach to Fatigue Crack Growth Rate Under Random Loading Using DC Eletrical Potential Method (직류전위차법을 이용한 랜덤하중하의 피로균열 진전율에 대한 신뢰성 공학적 연구)

  • Bae, Sung-In
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.20 no.2
    • /
    • pp.473-480
    • /
    • 1996
  • Automatic fatigue crack length measuring system using DC electrical potential method and the system control program for automatic fatigue testing under random load condition were made in this study. And using these system and control program, fatigue tests were executed under constant and random load condition. As the result, the propagation of crack in random loading can be represented Paris equaiton and log normal probability function. But constant and random load test show different crack propagation properties.

Reliability for SF6 gas load break switch of distribution system (배전선로용 가스절연부하개폐기의 신뢰성 향상책)

  • Park, Seung-Jae;Heo, Jong-Chul;Shin, Young-June;Kang, Young-Sik;Koh, Heui-Seog
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.452-454
    • /
    • 2003
  • $SF_6$ gas has been increasingly used as the insulating and arc-suppressing medium in switchgears which are used as the protection devices of power system. Nowadays, most of power companies adopted the $SF_6$ gas-type load break switch for increasing the reliability of distribution network by its superior durability against external environmental condition, in substitution for air-type and oil-type switches. But, it is important to establish the general estimation process for the testing and estimation for long-term reliability. Accordingly, this paper presents the reliability testing method for $SF_6$ gas load break switch which is based on the analysis of the failure mode and the statistics.

  • PDF