Journal of the Institute of Electronics and Information Engineers
/
v.51
no.2
/
pp.114-123
/
2014
Vehicle Black Box (Event Data Recorder EDR) only recognizes the general surrounding environments of load. In addition, general EDR is difficult to recognize the images of a sudden illumination change. It appears that the lens is being a severe distortion. Therefore, general EDR does not provide the clues of the circumstances of the accident. To solve this problem, we estimate the value of Normalized Luminance Descriptor(NLD) and Normalized Contrast Descriptor(NCD). Illumination change is corrected using Normalized Image Quality(NIQ). Second, we are corrected lens distortion using model of Field Of View(FOV) based on designed method of fisheye lens. As a result, we propose integration algorithm of two methods that correct distortions of images using each Gamma Correction and Lens Correction in parallel.
Park, Nam-Kyu;Lee, Dong-Kyu;Cho, Young-Jin;Moon, Byung-Sun;Song, Jae-Yong
Fire Science and Engineering
/
v.33
no.3
/
pp.121-127
/
2019
This study examined a fire accident caused by a defect in the vehicle ABS module. A large number of vehicles using the same manufacturer's ABS module in recent fire events showed a tendency to combust due to the same faults. As previously stated in the ABS module which shows the electrical breakdown between the power lines supplied to the constant power source by the battery. The electrical breakdown of the ABS module was caused by defects of the ABS module itself that were influenced by of the external flame. These results highlight the need to determine if there is a deficiency of the ABS module in the investigation of the cause of a fire in a vehicle which is produced by the same manufacturer.
Park, Chulhee;Park, Wan-gyu;Lee, Manbok;Kim, Choon-sam
Proceedings of the KIPE Conference
/
2018.07a
/
pp.177-179
/
2018
After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.20
no.2
/
pp.79-94
/
2021
A GNSS receiver installed in autonomous vehicles is the most essential device for its navigation. However, if an intentional jamming signal is generated, there is a risk of exposure to an accident risk due to deterioration of the GNSS sensor's performance. Research is required to prevent this, and accordingly, a jamming generating device must be provided. However, according to the provisions of the law related to jamming, this is illegal. In this paper, we implement an in-vehicle jamming device that complies with the provisions of the law and does not affect the surrounding GNSS sensors. Driving simulation is used to evaluate the performance of the GNSS algorithm, and the malfunction of autonomous vehicles occurring in the interference environment and data errors output from the GNSS sensor are analyzed.
Journal of the Korean Society of Marine Environment & Safety
/
v.29
no.2
/
pp.215-222
/
2023
Alternative marine power (AMP) is continuously used in ports and on docks because of regulations on global ship emission reduction. In Korea, the use of AMP is also mandatory under the Special Act on Port Air Quality Improvement, and efforts are under way in connection with various eco-friendly ships, such as electric-propulsion ships. In this study, AC load flow analysis was performed by modeling the situation in which onboard power is supplied through AMP. This analysis made it possible to study the electrical parameters and losses when power was supplied to the ship. In addition, through a transient stability analysis, the high-speed generation transfer limit value for uninterruptible conversion through onboard generators in the event of a system accident was derived. The results obtained when it was applied are presented
The container package type sealed water electrolysis production system installs mechanical balance of plant and electrical balance of plant as an integrated unit to enable independent operation within the package module. The auxiliary equipment required to operate the water electrolysis system must be integrated to reduce the installation area and shorten the installation time. At this time, as leak risk factors are placed in a dense space, when a hydrogen gas leak accident occurs, it can have a mutual influence on other adjacent facilities, so it contains various risk factors. In this study, when a gas leak occurs in a container packaged water electrolysis system, possible sources of leakage in the system according to the KS C IEC 60079-10-1:2015 and KGS GC101 standards were identified, and the leak rate and leak characteristics were calculated. did. The hazardous area and its range were calculated according to ventilation and dilution characteristics. In order to optimize ventilation characteristics, design of experiment was used to analyze the influence to evaluate the adequacy of ventilation, and overseas ventilation standards were analyzed and compared. In addition, the optimal ventilation structure and characteristics of the container packaged water electrolysis system were presented according to the results of the experimental design method.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.12
no.2
/
pp.99-107
/
1998
This dissertationhas confirmed the non-flam mability of cast mold transformer that is increasingly used lately. As a research progress, the investigation has been performed on the installation status and each line of the subway system which have the most mold transformer accidents, and the impediment status of the transformer for rectifier and the high-voltage distribution transformer per each manufacturer. Then, a high voltage mold of the actual mold transformer has been installed in the horiwntal heating furnace and the heat has been applied by the standard heating temperature curve of KSF 2257(Fireproof testing meth od of the construction structures: 1993). Accordingly, the combustibility of the mold transformer based on the test results has been found that 78 minutes has been required for the complete burning per the KSF 2257 combustion test curve and that, after stopping the heat application of the horizontal furnace after ignition, the flame progress has not been made but shown as the self-extinguishing characteristics when the flame progress has been checked. Thus, the non-flammability and self-extinguishability of the mold transformer have been confirmed. The result of this dissertation has indicated that the accident involving mold transformer has been progressed and expanded by the dielectric breakdown or void due to the crack in the mold rather than a fire accident caused by a short-circuit or an overload.r an overload.
Kim, Ji-Myung;Lee, Hu-Dong;Tae, Dong-Hyun;Ferreira, Marito;Park, Ji-Hyun;Rho, Dae-Seok
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.3
/
pp.585-593
/
2020
Until now, 29 fire accidents have occurred; 22 of them were caused by the interconnection of renewable energy sources that occurred during the rest period after the lithium-ion battery had been fully charged regardless of the seasons. The fire accidents of ESS were attributed to thermal runaway due to the overcharging of a few cells with the phenomenon of self-energy balancing, which is unintentional current flow from cells with a high SOC to the low cells if the SOC condition of each cell connected in parallel is different. Therefore, this paper proposes a novel configuration and operation algorithm of the BMS to prevent the self-energy balancing of ESS and presents a hybrid SOC estimation algorithm. From the test results of the self-energy balancing phenomenon between aging and normal cells based on the proposed algorithm and BMS, it was confirmed the possibility of self-energy balancing, which is unintentional current flow from cells with a high SOC to cells with a low SOC. In addition, the proposed configuration of the BMS is useful and practical to improve the safety of lithium-ion batteries because the BMS can reliably disconnect a parallel connection of the cells if the self-energy balancing current becomes excessively high.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.9
/
pp.351-358
/
2016
An Electrical Point Machine (NS:New-type Switch), which is equipped and operated at railways in Korea, has been used since the 1960s after being imported from Japan. On the other hand, although the mechanical configuration has improved the position motor control circuit, the electrical connection has not been improved, so NS may have a problem, such as the interlocking system of automatic train operation. In addition, NS is the most vulnerable part in the railway system and a huge train accident may occur due to minor defects. The existing NS wiring set of the circuit controller should be checked only if fixed. Therefore, an excessive inspection time only by a Railroad Signal expert is required. In this paper, the improvement of electrical connection in a NS wiring set, such as the position motor control circuit, was developed and the prototype was installed at Seoul Metro in the distance to go section. The results can be used to help make appropriate adjustments. The improvement of the NS wiring set enhance the maintenance efficiency, passenger service and the stability of the signal system as well as reducing the maintenance cost.
Instrument transformers are a safe measurement device designed to measure high voltage and large current. A current transformer(CT) is a type of instrument transformer designed to provide a current in its secondary winding proportional to the current flowing in its primary. It is commonly used in metering and protective relaying in the electrical power industry where it facilitates the safe measurement of large current. But, care must be taken that the secondary of a current transformer is not disconnected from its load while current is flowing in the primary, as this will produce a dangerously high voltage across the open secondary, and may permanently affect the accuracy of the transformer. Especially, industrial disaster such as an electric shock and/or a burn accident occurs occasionally by disregard of warning or attention. In this paper, we developed the detector for open of current transformer secondary terminal, and which was tested by the Korea Electrotechnology Research Institute. Test results show that Current Transformer secondary Open Detector(CTOD) interrupted within one second electronically when the 2nd terminal of current transformer opened.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.