• Title/Summary/Keyword: Electric power load

Search Result 1,445, Processing Time 0.026 seconds

Plant Minimum Stable Load (Pmin) Test for Ilijan CCPP

  • Kim, Si Moon;Yun, Wan No;Jang, Cheol Ho;Park, Se Ik
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.1
    • /
    • pp.83-88
    • /
    • 2016
  • This paper describes the test results of plant minimum stable load (Pmin) for Ilijan Power Plant. The test was conducted on May 13 through 14, 2015 to investigate the plant operating and equipment condition in accordance with "Ilijan Plant Performance Test Procedure on Plant Minimum Stable Load" [1]. This paper also contains the assessment of the impact of Pmin to plant operating parameters and possible technical operating issues when operating at lower loads and to recommend the safe minimum load operation of Ilijan per block. In addition, this paper describes the performance calculation results of efficiency and heat rate depending on the load level.

Impact of Dynamic Load Model on Short-Term Voltage Stability of Korea Power System and Estimation of Dynamic Load Model Parameters (국내 계통의 단기 전압 안정도에 대한 부하 모델의 영향성 검토 및 부하 모델 파라미터 선정)

  • Moon, Jaemin;Kim, Jae-Kyeong;Hur, Kyeon;Nam, Suchul;Kim, YongHak
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.1
    • /
    • pp.17-24
    • /
    • 2019
  • In this paper, we analyzed the effect of power system load model on the short-term voltage stability analysis results. First, we introduced common load models. We also confirmed that some load models can not represent actual system phenomena even if the model parameters are optimized. Also, we studied about the influences of load parameters and regional characteristics of load model on the sort-term voltage stability of KEPCO power system considering the contingency. The results showed that the importance of selecting a load model was confirmed again. And we recognized about it can be understood that it should reflect the load characteristics of the area near the assumed contingency more accurately.

Investgating Effects of Peak Load of Korean Power System from Electric Heating appliances except House (비주택용 전기난방기구가 우리나라 첨두부하에 미치는 영향 검토)

  • Kim, Yong-Ha;Lee, Kwang-Sung;Heo, Dong-Ryeul;Lee, Sung-Jun;Lee, Yong-Suk;Woo, Sung-Min;Son, Seung-Kee
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.442-447
    • /
    • 2006
  • This paper investigates the shadow amount of edifice and according to time zone used by its Electric heating appliances, it is analyzed that Electric Heating Power Load affects Heal power load variation curve. Also, in case that the far infrared ray heating system, which are used as new electric heating system, occupies some of the existing Electric heating appliances, it is analyzed that the Electric heating power load affects the Peak load power in Korea.

  • PDF

Simulation and Energy Cost Calculation of Encapsulated Ice Storage System (캡슐형 빙축열시스템에 대한 운전 시뮬레이션 및 에너지비용 분석)

  • Lee, K.H.;Joo, Y.J.;Choi, B.Y.;Kim, S.J.
    • Solar Energy
    • /
    • v.19 no.3
    • /
    • pp.63-73
    • /
    • 1999
  • Ice storage systems are used to shift the peak load in day time into night time in summer. This paper describes a system simulation of partial ice storage system composed of an encapsulated ice storage tank, a screw compressor chiller, a heat exchanger, and a brine pump. For the system simulation, a one-dimensional model of ice storage tank is developed and validated by comparison with the performance data from measurements of an ice storage tank installed at a building. The control strategies considered in this study are chiller priority and storage priority being used commercially. The system is simulated with design cooling load of 600 RT peak load in design day and with off-design day cooling load, and the electric energy costs of the two control strategies for the same system size are compared. As a result of calculation, the energy consumption in a week for storage priority is higher than that for chiller priority control. However due to lower cost of night electric charge rate, energy cost for storage priority control is lower than chiller priority.

  • PDF

Electric Power Load Forecasting using Fuzzy Prediction System (퍼지 예측 시스템을 이용한 전력 부하 예측)

  • Bang, Young-Keun;Shim, Jae-Sun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.11
    • /
    • pp.1590-1597
    • /
    • 2013
  • Electric power is an important part in economic development. Moreover, an accurate load forecast can make a financing planning, power supply strategy and market research planned effectively. This paper used the fuzzy logic system to predict the regional electric power load. To design the fuzzy prediction system, the correlation-based clustering algorithm and TSK fuzzy model were used. Also, to improve the prediction system's capability, the moving average technique and relative increasing rate were used in the preprocessing procedure. Finally, using four regional electric power load in Taiwan, this paper verified the performance of the proposed system and demonstrated its effectiveness and usefulness.

A Study on Daily Cooling Load Forecast Using Fuzzy Logic (퍼지 논리를 이용한 일일 냉방부하 예측에 관한 연구)

  • 신관우;이윤섭
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.8 no.11
    • /
    • pp.948-953
    • /
    • 2002
  • The electric power load during the peak time in summer is strongly affected by cooling load, which decreases the preparation ratio of electricity and brings about the failure in the supply of electricity in the electric power system. The ice-storage system and heat pump system are possible solutions to settle this problem. In this study. the method of estimating temperature and humidity to forecast the cooling load of ice-storage system is suggested, then the method of forecasting the cooling load using fuzzy logic is suggested by simulating that the cooling load is calculated using actual temperature and humidity. The forecast of the temperature, humidity and cooling load are simulated, and it is shown that the forecasted data approach to the actual data. Operating the ice-storage system by the forecast of cooling load with night electric power will improve the ice-storage system efficiency and reduce the peak electric power load during the summer season as a result.

POWER LOAD MANAGEMENT FOR PEAK LOAD CLIPPING (POWER LOAD DIRECT CONTROL METHOD) (Peak부하(負荷) 억제(抑制)를 위한 전력부하관리(電力負荷管理) (전력부하(電力負荷) 직접제어방식(直接制御方式)))

  • Kim, Yeong-Han;Lee, Hyo-Sang;Kim, Jai-Young
    • Proceedings of the KIEE Conference
    • /
    • 1989.07a
    • /
    • pp.246-250
    • /
    • 1989
  • Owing to the rapid development of economy and the higher living standard of people, electricity demands have growth and the peak load has been increased rapidly. To cope with this impacts and to reduce the cost of service,utilities are conserned about power load management program. This paper shows a scheme of power load control and the basic structure of direct load control system. And also radio control method using the public pager which is one of the best economical and serviceable method in techniques will be introduced briefly.

  • PDF

Daily Maximum Electric Load Forecasting for the Next 4 Weeks for Power System Maintenance and Operation (전력계통 유지보수 및 운영을 위한 향후 4주의 일 최대 전력수요예측)

  • Jung, Hyun-Woo;Song, Kyung-Bin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.11
    • /
    • pp.1497-1502
    • /
    • 2014
  • Electric load forecasting is essential for stable electric power supply, efficient operation and management of power systems, and safe operation of power generation systems. The results are utilized in generator preventive maintenance planning and the systemization of power reserve management. Development and improvement of electric load forecasting model is necessary for power system maintenance and operation. This paper proposes daily maximum electric load forecasting methods for the next 4 weeks with a seasonal autoregressive integrated moving average model and an exponential smoothing model. According to the results of forecasting of daily maximum electric load forecasting for the next 4 weeks of March, April, November 2010~2012 using the constructed forecasting models, the seasonal autoregressive integrated moving average model showed an average error rate of 6,66%, 5.26%, 3.61% respectively and the exponential smoothing model showed an average error rate of 3.82%, 4.07%, 3.59% respectively.

A study on the electric power recovery in generator load test (부하 시험 발전기 전력회수에 관한 연구)

  • Lee, Myoungho
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.4
    • /
    • pp.403-408
    • /
    • 2014
  • Lots of electric power has been wasted through the load bank usually in the container boxes during the generator load test of the ship and offshore plant in the new ship building. Therefore in this research, the quantity of wasted electric power through generator load test under construction was investigated on big shipbuilding yard and quantity of electric power that can be recovered is analyzed when produced electric power during the generator load test is connected to KEPCO Grid, according to laboratory's experiment result where recovers electric power produced from small generator connected to KEPCO Grid.

Design of Electric Power Load Forecasting Model based on IT2TSK FLS (IT2TSK 퍼지논리 기반 전력부하 예측 모델 설계에 관한 연구)

  • Bang, Young-Keun;Shim, Jae-Sun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.7
    • /
    • pp.1088-1095
    • /
    • 2015
  • In most cases, the use of electric power is associated with the economic scale of a nation closely. Thus, the electric power load forecasting plays an important role for the national economic plan. This paper deals with the design method for the electric power load forecasting system. In this paper, RCR-MA data processing, which can make the complex properties of the original data form simple, is proposed. Next, IT2TSK FLS, which can reflect the uncertainty of data more than T1TSK FLS, is applied. Consequently, the structural advantage of the proposed system can improve the forecasting accuracy, and is verified by using two types of electric power data.