• 제목/요약/키워드: Electric forecasting

검색결과 177건 처리시간 0.03초

다중회귀모형을 이용한 104주 주 최대 전력수요예측 (Weekly Maximum Electric Load Forecasting Method for 104 Weeks Using Multiple Regression Models)

  • 정현우;김시연;송경빈
    • 전기학회논문지
    • /
    • 제63권9호
    • /
    • pp.1186-1191
    • /
    • 2014
  • Weekly and monthly electric load forecasting are essential for the generator maintenance plan and the systematic operation of the electric power reserve. This paper proposes the weekly maximum electric load forecasting model for 104 weeks with the multiple regression model. Input variables of the multiple regression model are temperatures and GDP that are highly correlated with electric loads. The weekly variable is added as input variable to improve the accuracy of electric load forecasting. Test results show that the proposed algorithm improves the accuracy of electric load forecasting over the seasonal autoregressive integrated moving average model. We expect that the proposed algorithm can contribute to the systematic operation of the power system by improving the accuracy of the electric load forecasting.

배전시스템 운영계획을 위한 신재생에너지원 발전량 예측 방법 (Renewable Power Generation Forecasting Method for Distribution System: A Review)

  • 조진태;김홍주;류호성;조영표
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제8권1호
    • /
    • pp.21-29
    • /
    • 2022
  • Power generated from renewable energy has continuously increased recently. As the distributed generation begins to interconnect in the distribution system, an accurate generation forecasting has become important in efficient distribution planning. This paper explained method and current state of distributed power generation forecasting models. This paper presented selecting input and output variables for the forecasting model. In addition, this paper analyzed input variables and forecasting models that can use as mid-to long-term distributed power generation forecasting.

Very Short-term Electric Load Forecasting for Real-time Power System Operation

  • Jung, Hyun-Woo;Song, Kyung-Bin;Park, Jeong-Do;Park, Rae-Jun
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권4호
    • /
    • pp.1419-1424
    • /
    • 2018
  • Very short-term electric load forecasting is essential for real-time power system operation. In this paper, a very short-term electric load forecasting technique applying the Kalman filter algorithm is proposed. In order to apply the Kalman filter algorithm to electric load forecasting, an electrical load forecasting algorithm is defined as an observation model and a state space model in a time domain. In addition, in order to precisely reflect the noise characteristics of the Kalman filter algorithm, the optimal error covariance matrixes Q and R are selected from several experiments. The proposed algorithm is expected to contribute to stable real-time power system operation by providing a precise electric load forecasting result in the next six hours.

전력계통 유지보수 및 운영을 위한 향후 4주의 일 최대 전력수요예측 (Daily Maximum Electric Load Forecasting for the Next 4 Weeks for Power System Maintenance and Operation)

  • 정현우;송경빈
    • 전기학회논문지
    • /
    • 제63권11호
    • /
    • pp.1497-1502
    • /
    • 2014
  • Electric load forecasting is essential for stable electric power supply, efficient operation and management of power systems, and safe operation of power generation systems. The results are utilized in generator preventive maintenance planning and the systemization of power reserve management. Development and improvement of electric load forecasting model is necessary for power system maintenance and operation. This paper proposes daily maximum electric load forecasting methods for the next 4 weeks with a seasonal autoregressive integrated moving average model and an exponential smoothing model. According to the results of forecasting of daily maximum electric load forecasting for the next 4 weeks of March, April, November 2010~2012 using the constructed forecasting models, the seasonal autoregressive integrated moving average model showed an average error rate of 6,66%, 5.26%, 3.61% respectively and the exponential smoothing model showed an average error rate of 3.82%, 4.07%, 3.59% respectively.

개선된 지역수요예측 알고리즘 (An Improved Spatial Electric Load Forecasting Algorithm)

  • 남봉우;송경빈
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2007년도 춘계학술대회 논문집
    • /
    • pp.397-399
    • /
    • 2007
  • This paper presents multiple regression analysis and data update to improve present spatial electric load forecasting algorithm of the DISPLAN. Spatial electric load forecasting considers a local economy, the number of local population and load characteristics. A Case study is performed for Jeon-Ju and analyzes a trend of the spatial load for the future 20 years. The forecasted information can contribute to an asset management of distribution systems.

  • PDF

IT2TSK 퍼지논리 기반 전력부하 예측 모델 설계에 관한 연구 (Design of Electric Power Load Forecasting Model based on IT2TSK FLS)

  • 방영근;심재선
    • 전기학회논문지
    • /
    • 제64권7호
    • /
    • pp.1088-1095
    • /
    • 2015
  • In most cases, the use of electric power is associated with the economic scale of a nation closely. Thus, the electric power load forecasting plays an important role for the national economic plan. This paper deals with the design method for the electric power load forecasting system. In this paper, RCR-MA data processing, which can make the complex properties of the original data form simple, is proposed. Next, IT2TSK FLS, which can reflect the uncertainty of data more than T1TSK FLS, is applied. Consequently, the structural advantage of the proposed system can improve the forecasting accuracy, and is verified by using two types of electric power data.

실시간기상정보와 전력패턴을 이용한 단기 전력부하예측 (Short-term Electric Load Forecasting Using the Realtime Weather Information & Electric Power Pattern Analysis)

  • 김일주;이송근
    • 전기학회논문지
    • /
    • 제65권6호
    • /
    • pp.934-939
    • /
    • 2016
  • This paper made short-term electric load forecasting by using temperature data at three-hour intervals (9am, 12pm, 3pm, and 6pm) provided by the Korea Meteorological Administration (KMA). In addition, the electric power pattern was created using existing electric power data, and temperature sensitivity was derived using temperature and electric power data. We made power load forecasting program using LabVIEW, a graphic language.

Winters' Multiplicative Seasonal Model에 의한 월 최대 전력부하의 단기예측 (Short-Term Forecasting of Monthly Maximum Electric Power Loads Using a Winters' Multiplicative Seasonal Model)

  • 양문희;임상규
    • 대한산업공학회지
    • /
    • 제28권1호
    • /
    • pp.63-75
    • /
    • 2002
  • To improve the efficiency of the electric power generation, monthly maximum electric power consumptions for a next one year should be forecasted in advance and used as the fundamental input to the yearly electric power-generating master plan, which has a greatly influence upon relevant sub-plans successively. In this paper, we analyze the past 22-year hourly maximum electric load data available from KEPCO(Korea Electric Power Corporation) and select necessary data from the raw data for our model in order to reflect more recent trends and seasonal components, which hopefully result in a better forecasting model in terms of forecasted errors. After analyzing the selected data, we recommend to KEPCO the Winters' multiplicative model with decomposition and exponential smoothing technique among many candidate forecasting models and provide forecasts for the electric power consumptions and their 95% confidence intervals up to December of 1999. It turns out that the relative errors of our forecasts over the twelve actual load data are ranged between 0.1% and 6.6% and that the average relative error is only 3.3%. These results indicate that our model, which was accepted as the first statistical forecasting model for monthly maximum power consumption, is very suitable to KEPCO.

데이터 가중 성능을 갖는 GMDH 알고리즘 및 전력 수요 예측에의 응용 (GMDH Algorithm with Data Weighting Performance and Its Application to Power Demand Forecasting)

  • 신재호;홍연찬
    • 제어로봇시스템학회논문지
    • /
    • 제12권7호
    • /
    • pp.631-636
    • /
    • 2006
  • In this paper, an algorithm of time series function forecasting using GMDH(group method of data handling) algorithm that gives more weight to the recent data is proposed. Traditional methods of GMDH forecasting gives same weights to the old and recent data, but by the point of view that the recent data is more important than the old data to forecast the future, an algorithm that makes the recent data contribute more to training is proposed for more accurate forecasting. The average error rate of electric power demand forecasting by the traditional GMDH algorithm which does not use data weighting algorithm is 0.9862 %, but as the result of applying the data weighting GMDH algorithm proposed in this paper to electric power forecasting demand the average error rate by the algorithm which uses data weighting algorithm and chooses the best data weighting rate is 0.688 %. Accordingly in forecasting the electric power demand by GMDH the proposed method can acquire the reduced error rate of 30.2 % compared to the traditional method.

대도시 지역의 경제지표를 고려한 장기전력 부하예측 기법 (Long-Term Load Forecasting in Metropolitan Area Considering Economic Indicator)

  • 최상봉;김대경;정성환
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권8호
    • /
    • pp.380-389
    • /
    • 2000
  • This paper presents a method for the regional long-term load forecasting in metropolitan area considering econimic indicator with the assumption that energy demands propoprtionally increases under the economic indicators. For the accurate load forecasting, it is very important to scrutinize the correlation among the regional electric power demands, economic indicator and other characteristics because load forecasting results may vary depending on many different factors such as electric power demands, gross products, social trend and so on. Three steps for the regional long-term load forecasting are microscopically and macroscopically used for the regional long -term load forecasting in order to increase the accuracy and practicality of the results.

  • PDF