• Title/Summary/Keyword: Electric Power Service

Search Result 380, Processing Time 0.027 seconds

Safety Countermeasure of the distribution box of service wire (인입선 분기함의 안전대책에 관한 연구)

  • Ha, Tae-Hyun;Bae, Jeong-Hyo;Lee, Hyun-Goo;Kim, Dae-Kyeong;Ha, Yoon-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.246-248
    • /
    • 2004
  • The lower voltage distribution box of service wire has been usually employed to supply an electric power to the consumers through low voltage overhead line. Now-a-days, electric shock accident at the distribution box of service wire installed in the seashore areas has been often occurred. The reason is mainly due to the electric leakage in the distribution box of service wire. This paper described insulation breakdown mechanism of distribution box of service wire, analysis of electric shock path and safety countermeasure of distribution box of service wire.

  • PDF

A Design of MIB for Power System Using XML Web Service (XML 웹서비스를 이용한 전력시스템 MIB 설계)

  • Jung, Nam-Joon;Yang, Il-Gwon;Song, Jae-Ju;Ko, Jong-Min;Oho, Do-Eun
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2008.06b
    • /
    • pp.473-478
    • /
    • 2008
  • 산업계에서의 제어시스템(Control System)은 크게 SCADA(Supervisory Control And Data Acquisition) 시스템, 분산 제어시스템(Distributed Control System, DCS), PLC 시스템 (Programmable Logic Controller System)으로 분류할 수 있다. 특히 전력분야의 SCADA 시스템은 목적상 실시간의 대규모 측정 정보 취득을 목적으로 운영되며, 실시간 및 이력 데이터베이스, 원격 데이터 취득, 다양한 데이터 처리, Supervisory Control 등 복잡한 기능과 다양한 전력시스템과의 정보교환이 요구된다. 다양한 전력시스템과의 정보 교환을 위한 표준화 요구에 부응하여, 향후 전력시스템은 표준화되고 공개된 정보모델을 활용한 통합시스템 개발이 요구된다. 본 논문에서는 전력 공통정보모델(CIM)과 애플리케이션 통합 정보기술을 이용한 전력시스템의 메시지 통합버스 설계에 대하여 기술하고자 한다.

  • PDF

Evaluation of optimum cost for power system ancillary service (계통운영 보조서비스 적정비용규모 산정)

  • Ma, Sam-Sun;Yoon, Yong-Beum;Ahn, Nam-Sung;Lee, Jae-Gul;Kim, Hyun-Sil
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.353-354
    • /
    • 2006
  • 계통운영 보조서비스는 전력계통의 안정성 확보, 전기품질 유지 및 전력거래 활성화를 위한 필수적인 서비스이다. 계통운영보조서비스의 비용요소는 연료비, 운영유지비, 자본비용, 기회비용으로 구분된다. 이의 적정비용규모를 산정하여 보조서비스 제공자에게 보상함으로써 전력의 공급안정성 화보에 크게 기여할 수 있게 된다. 여기서는 국내 전력시장에서 연료비와 운영유지비 측면에서 적정비용규모를 산정하고 현재 운용중인 시장규칙과 비하여 개선방안을 제시한다.

  • PDF

A Study on Development and Operation of Power Energy Consumption Consulting System (전력에너지 컨설팅 시스템 개발 및 운영방안 연구)

  • Kim, Sun-Ic;Yu, In-Hyeob;Ko, Jong-Min;Jung, Nam-Jun;Cho, Sun-Gu
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2007.05a
    • /
    • pp.544-546
    • /
    • 2007
  • 본 연구에서는 전력부가서비스 시스템으로 개발한 전력에너지 컨설팅 시스템의 주요 기능과 운영방을 소개한다. 본 시스템의 주요 기능은 전력소비 데이터 분석, 전력사용량 분석, 전력요금 분석, 전력요금 컨설팅 보고서 제공 등 4가지로 구분할 수 있다. 원격검침을 시행중인 고압고객 중 계약전력이 100kW 이상인 대수용가로부터 특히, 전력요금 절감을 필요로 하지만 별도의 설비나 인력을 보유하지 않은 10,000kW 이하 고객을 적용대상으로 하고 있다. 본 시스템은 수용가에게는 전력요금 절감을 전력회사 및 Energy Service Provider에게는 간접적 부하/수요관리 효과를 목표로 개발하였으며, 향후 대수용가를 대상으로 전력부가서비스 적용 사업화 분야에 활용될 수 있을 것이다.

  • PDF

Development of Pre-Service and In-Service Information Management System (iSIMS) (원전 가동전/중 검사정보관리 시스템 개발)

  • Yoo, H.J.;Choi, S.N.;Kim, H.N.;Kim, Y.H.;Yang, S.H.
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.24 no.4
    • /
    • pp.390-395
    • /
    • 2004
  • The iSTMS is a web-based integrated information system supporting Pre-Service and In-Service Inspection(PSI/ISI) processes for the nuclear power plants of KHNP(Korea Hydro & Nuclear Power Co. Ltd.). The system provides a full spectrum coverage of the inspection processes from the planning stage to the final report of examination in accordance with applicable codes, standards, and regulatory requirements. The major functions of the system includes the inspection planning, examination, reporting, project control and status reporting, resource management as well as objects search and navigation. The system also provides two dimensional or three dimensional visualization interface to identify the location and geometry of components and weld areas subject to examination in collaboration with database applications. The iSIMS is implemented with commercial software packages such as database management system, 2-D and 3-D visualization tool, etc., which provide open, updated and verified foundations. This paper describes the key functions and the technologies for the implementation of the iSIMS.

Forward Link Power Allocation and Capacity of IMT-2000 System (IMT-2000 시스템의 순방향 링크 전력할당과 용량유도)

  • Ro, Sang-Min;Kim, In-Kyoung;Kim, Joo-Eung;Daesik Hong;Kang, Chang-Eon;Jung, Hyun-Meen
    • Proceedings of the IEEK Conference
    • /
    • 2000.11a
    • /
    • pp.117-120
    • /
    • 2000
  • This paper discusses solutions for forward link power allocation based on 3GPP(FDD) standardization reports and which meet the required Eb/No of forward link channels. In addition, the forward link user capacity in a mixed service environment. Cell coverage is induced from the user capacity solutions using the urban propagation model. In an urban macrocell environment, the forward link user capacity turns out to be roughly 29 and 3, respectively, for voice and data service (144 kbps) at a distance of 1 km, and in an urban microcell environment, the user capacity turns out to be Toughly 14, 4, and 2, respectively, for voice and two data services (144 kbps, 384 kbps) when the cell radius is 0.2 km.

  • PDF

Study on Analysis for Power Consumption and Charge/Discharge Effect with BESS in AC High-Speed Electric Railway System (교류 고속철도계통에서 BESS의 도입을 위한 전력소비 및 충·방전효과 분석에 관한 연구)

  • Jeon, Yong-Joo;Kang, Byoung-Wook;Chai, Hui-Seok;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.20-27
    • /
    • 2014
  • The power consumption pattern of high-speed railway has rarely during night time. But, during service time, the power is consumed irregularly related to train operation. Especially certain unusual about 1-2 days of service time interval to indicate the power consumption is rapidly growing phenomenon, which causes the capacity of the power contract is the annual electricity bill to rise rapidly as the cause. Normally, amount of peak power consumption bill rate at railway substation is over 20% of total electrical bill. Therefore, high-speed railway substation is expected to be considerably larger savings by reducing the peak power of the default charge(demand power).

The Development of Application Programs for Optimal Feeder Operation Through Distribution Automatic System

  • Ha, Bok-Nam;Seol, Ieel-Ho;Jeong, Mi-Ae
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.1
    • /
    • pp.42-47
    • /
    • 2004
  • This paper presents the various application programs for the Distribution Automation System (DAS) of the Korea Electric Power Corporation (KEPCO)'s distribution system. These programs are developed to allow for optimal operation in the areas of feeder automation, relay coordination, loss minimization and so on. They are single line diagram auto creation programs for the feeder, service restoration program, protection coordination program, data error detection program, and optimal network reconfiguration program. The details of these programs are presented for validity and effectiveness.

Field Application of Recycled Aluminum Wires (재생 ACSR 전선의 실계통 적용)

  • Kim, Ju-Yong;Kim, Sang-Joon;Song, Il-Keun
    • Proceedings of the KIEE Conference
    • /
    • 1997.07d
    • /
    • pp.1396-1398
    • /
    • 1997
  • This paper presents experimental results on the recycling aluminum wires used in the actual field. Several testings were carried out with the recycled aluminum wires to prove that they are reusable. Mechanical, electrical and oxidation properties of recycled and new ACSR $160\;mm^2$ were campared after 7.5 year service aging at the salt comtaminated areas of Korean peninsular.

  • PDF