• Title/Summary/Keyword: Electric Power Service

Search Result 380, Processing Time 0.034 seconds

Investigation of the Preventive Diagnostic Criteria for Power Transformer (전력용 변압기 예방진단 기준치 검토)

  • Kweon, D.J.;Koo, K.S.;Kang, Y.W.;Woo, J.W.;Kwak, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.592-596
    • /
    • 2005
  • The preventive diagnostic system prevents transformers from power failure by giving alarm and observing transformers in service. And it helps to establish the plan for optimum maintenance of transformer as well as to find location or cause of fault using accumulated data. KEPCO has adopted the preventive diagnostic system at nine 345kV substations since 1997. Techniques for component sensors of preventive diagnostic system were settled but diagnostic algorithm, diagnostic criteria and practical use of accumulated data are not yet established. This paper, to build up the base of preventive diagnostic algorithm for the power transformer, investigated the preventive diagnostic criteria for power transformer.

  • PDF

The Measurement and Analysis of Radio Characteristic of 424 MHz Short Range Wireless Frequency (424 MHz 소출력 무선주파수 전파특성 측정 및 분석)

  • Lim, Yong-Hun;Choi, Hyo-Yul;O, Kyu-Whan;Lee, Beom-Seok;Hyun, Duck-Hwa
    • Proceedings of the Korea Electromagnetic Engineering Society Conference
    • /
    • 2005.11a
    • /
    • pp.437-442
    • /
    • 2005
  • This paper deals with the measurement and analysis of radio characteristic of 424 MHz for using the automation of transmission and supply of electric power, ana automatic meter reading(AMR). Normally radio propagation characteristic is the base of system design, performance evaluation and choice of position of the base station in wireless communication. It is the most accurate way to design a base station through practical measurements, but it costs much time, money and engineers. So, we developed 424 MHz short range wave propagation model for AMR service.

  • PDF

Development of Enhanced Real-Time Service Restoration Algorithm for Distribution Automation System (실 배전계통 자동화를 위한 개선된 고장복구 알고리즘 개발)

  • Oh, H.J.;Mun, K.J.;Kim, H.S.;Seo, J.I.;Hwang, G.H.;Park, J.H.;Lim, S.I.;Ha, B.N.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.159-161
    • /
    • 2000
  • This paper presents a GA for service restoration in electric power distribution systems. The aim of the service restoration is to restore service with maximizing the amount of total load restored while minimizing the number of required switch operation when a fault or overload occurs in distribution system. This paper develops GA for service restoration problem with constrained multi-objective optimization problem. The results show the effectiveness of the proposed method for solving the problem.

  • PDF

Analysis on the Fire Accident of Vehicle Due to Damage of Connector and wiring on an Anti-lock Brake System(ABS) Module (ABS 모듈의 접속부 및 전원배선 손상으로 인한 차량화재 사고사례 분석)

  • Park, Nam-Kyu;Kim, Jin-Pyo;Nam, Jung-Woo;Park, Jong-Taek;Song, Jae-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.13-19
    • /
    • 2017
  • In this paper, study of vehicle fire cases caused by connector and power wiring of anti-lock brake system(ABS) module damage is presented. The purpose of ABS module is to improve braking and steering ability under sudden stop of the vehicle by repeatedly activating and releasing the brake with electric signal via electric control unit. The electric control unit for ABS may experience incomplete contact between power line and signal line or electrical breakdown on the printed circuit board by undergoing repetitive signal change which would consequently result in electrical heat and spark, eventually leading to automotive fire. Therefore, the purpose of this paper is to provide fundamental data by analyzing connector and power wiring of ABS module damage conducive to the precise investigation on the cause of vehicle fire.

The Development Plan of the Protection Device Auto-coordination Program in the Distribution Automation System (배전자동화 적용선로 보호기기 자동정정 프로그램 개발)

  • Kang, Moon-Ho;Ha, Bok-Nam;Lim, Seong-Il;Cho, Nam-Hun;Lee, Heung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.129-131
    • /
    • 2001
  • In order to improve the reliability of power service and the effective management of distribution power system. DAS (Distribution Automation system) is widely used in KEPCO(Korea Electric Power Corporation) branch offices. Based on the present protective device coordination program which used in KEPCO. this study presents the new concept about both protective device coordination program maximizing the characteristics of DAS and development plan of protective device auto-coordination program with the merits of DAS.

  • PDF

Development of an Integrity Evaluation System (WIES) for Fuel Channels in CANDU Reactors (중수로 연료관 건전성 평가시스템(WIES) 개발)

  • Choi, Sung-Nam;Kim, Hyung-Nam;Yoo, Hyun-Joo;Kwon, Dong-Kee;Hwang, Won-Gul
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.9
    • /
    • pp.1273-1279
    • /
    • 2010
  • Pressure tubes at the CANada Deuterium Uranium (CANDU) nuclear power plants are periodically inspected in accordance with the CSA N285.4 code. If flaws that do not satisfy the criteria given in CSA N285.4 are detected, the code permits a fitness-for-service assessment to determine the acceptability of the flawed pressure tubes. In this paper, the Wolsong In-service Evaluation System (WIES) is introduced; this system has been developed for the assessment of the flawed pressure tubes and is based on CSA N285.8. Since the system evaluates the integrity of flawed pressure tubes exactly and promptly during an in-service inspection, it will help in operating the Wolsong nuclear power plants without prolonging the outage period.

Distribution Load Forecasting based with Land-use Estimation (토지용도 추정을 기반으로 한 배전계통 부하예측)

  • Kwon, Seong-Chul;Lee, Hak-Joo;Choi, Byoung-Youn
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1481-1483
    • /
    • 1999
  • Power distribution system planning for maximum customer satisfaction and system efficiency requires accurate forecast of future demand in service area. Spatial load forecasting method provides a more accurate estimation of both magnitudes and location of future electrical load. This method considers the causes of load growth due to addition of customers and per capita consumption among customers by land use (residential, commercial and industrial). So the land-use study and it's preference for small area is quite important. This paper proposes land-use preference estimation method based on fuzzy logic. Fuzzy logic is applied to computing preference scores for each land-use and by these scores the customer growth is allocated in service area. An simulation example is used to illustrate the proposed method.

  • PDF

Classifier System and Co-evolutionary Hybrid Approach to Restoration Service of Electric Power Distribution Networks

  • Filipiak, Sylwester
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.3
    • /
    • pp.288-296
    • /
    • 2012
  • The method proposed by the author is intended for assistance in decision-making (concerning changes of connections) by operators of complex distribution systems during states of malfunction (particularly in the events of malfunctions, for which the consequences encompass extended parts of the network), through designation of connection action scenarios (creating substitute configurations). It is the use by the classifying system working with the co-evolution algorithm that enables the effective creation of substitute scenarios for the Medium Voltage electric power distribution network. The author also completed works concerning the possibility of using cooperation of the evolutionary algorithm and the co-evolutionary algorithm with local search algorithms. The method drawn up may be used in current systems managing the work of distribution networks to assist network operators in taking decisions concerning connection actions in supervised electric power systems.

Implementation of a High Performance Notch Filter Algorithm for Power Line Communication System (전력선 통신 시스템을 위한 고성능 Notch Filter 알고리즘 구현)

  • Nam, Yun-Ho;Jang, Dong-Won;Kim, Kyung-Seok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.10 no.3
    • /
    • pp.159-166
    • /
    • 2010
  • As Power Line has been already installed over 60% of a residential area all over the world, Broadband Service has been possible using high-speed PLC(Power Line Communication) without new access line installed for Internet access. Because of such reason, PLC is researched as the most suitable service for Last Mile Solution. But, Power Line is designed for transmitting electric power, so peripheral Wireless Communication System is affected by a leak of electric wave. In this paper, we propose a High Performance Notch Filter algorithm in comparison with a existing notch filter for reduction of interference between existing Wireless Communication Service and Power Line Service. In addition, we implement the Notch Filter emulator appling a High Performance Notch Filter and using a embedded board.

Grid service using Vehicle-to-Grid (V2G를 이용한 전력계통 서비스)

  • Lee, Hyun-Goo;Sohn, Hong-Kwan;Ha, Tae-Hyun;Bae, Jeong-Hyo;Kim, Dae-Kyeong;Lee, Sung-Joon;Kim, Sung-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.141-142
    • /
    • 2011
  • The increase in oil prices and the rising environmental concerns are boost the electric vehicle supply. Vehicle manufactures understand this trend quite well and plan to increase the production of electric vehicle(EV) such as Nissan LEAF and GM VOLT etc.. The growth of intermittent renewable energy sources such as solar and wind power requires utilities to find additional grid coupled energy storage and regulation capacity. EVs have a battery pack and a charger. The charger can be able to deliver power back to the grid from the vehicle's battery as well as charge the battery. The concept of deploying EVs to stabilize the electric power grid is generally referred to as Vehicle-to-Grid(V2G). We present the grid service using V2G.

  • PDF