• Title/Summary/Keyword: Effort Estimation

Search Result 285, Processing Time 0.023 seconds

An assurance level and product type based evaluation effort model for CC evaluation (CC기반에서 보증수준 및 제품유형을 동시에 고려한 평가업무량 모델)

  • Choi, Sang-Soo;Choi, Seung;Lee, Wan-Seok;Lee, Kang-Soo
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.14 no.1
    • /
    • pp.25-34
    • /
    • 2004
  • Common Criteria(CC, ISO/IEC 15408) is an international standard for evaluation of Information Suity Systems(ISS). There need a suitable evidence of estimation of evaluation cost in an evaluation facility under the CC-based evaluation and assurance scheme. In this paper, we propose an evaluation effort model, which is based not only on assurance-level but also on product-type of ISS, by means of real experience of real evaluators, use-ratio concept and the Function Point of security function. The model is based not on a real evaluation environment of evaluation facility, but on CC, public PPs and product specific STs. Our result might be used as a basic model for estimation of evaluation cost and time of ISS in an CC-based evaluation and assurance scheme.

The Estimation of Software Development Effort Using Multiple Regression Method (다중회귀 분석을 이용한 소프트웨어 개발노력추정)

  • Jung Hye-Jung;Yang Hae-Sool;Shin Seok-Kyoo;Lee Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.11D no.7 s.96
    • /
    • pp.1483-1490
    • /
    • 2004
  • To accomplish a project successfuly, we have to estimate develpment effort accurately. But, development effort is different to software size and operation environment. Usually, we made use of function point for estimating development effort. In this paper. we make use of 789 project data. It is related to development projects in 1990`s. We investigate the variable affecting development effort. Also, we exedcute multiple liner regression analysis for looking linear relation about variables. We find the regression equation for multistage by dividing PDR that influ-enced development effort step by step.

Analysis of Local Tax Performance Through Tax Capacity and Tax Effort in Indonesia 2014-2018

  • RAFSANJANI, Ali Hadi;AGUSTINA, Neli
    • Asian Journal of Business Environment
    • /
    • v.12 no.2
    • /
    • pp.43-53
    • /
    • 2022
  • Purpose: This study aims to analyze the performance of local taxes in Indonesia through the estimation of tax capacity and tax effort, as well as classifying provinces based on the estimated value of tax capacity and tax effort. Research design, data and methodology: this study uses panel data of 34 provinces in Indonesia for the period of 2014-2018. The analytical method used in the tax capacity model is panel data regression to explain the factors that influence tax performance. Tax effort is estimated by the ratio of tax to tax capacity. Results: The results of the analysis show that gini ratio and regional expenditures have a significant positive effect on the tax ratio, while the share of GRDP in the manufacturing sector and HDI has a significant negative effect on the tax ratio. Based on the results, there are 19 provinces that have low tax capacity and 16 provinces that have low tax effort. Conclusions: The development of local tax performance tends to fluctuate with an average of 1.24 percent per year. Gini ratio and regional expenditure have a significant positive effect on the tax ratio, while the share of GRDP in the manufacturing sector and HDI have a significant negative effect on the tax ratio.

Software Effort Estimation Based on UCP from Customer Requirements (고객 요구사항으로부터 UCP 기반 소프트웨어 공수 산정)

  • Park, Bo Kyung;Park, Young Sik;Kim, R. Young Chul
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2019.10a
    • /
    • pp.701-703
    • /
    • 2019
  • 현재의 소프트웨어는 매우 크고 복잡하다. 고품질 소프트웨어는 요구사항 단계부터 정확하게 분석해야 한다. 그러나 자연어 요구사항은 부정확하기 때문에 유스케이스 식별이 어렵다. 게다가, 기존 요구 사항 분석 방법은 객체와 용어 식별에 대한 정확한 기준이 없다. 따라서 분석 결과는 분석가마다 다르다. 본 논문에서는 자연어 요구사항으로부터 유스케이스 추출 및 소프트웨어 공수 산정 방법을 제안한다. 제안한 방법에서는 Goal Modeling과 Fillmore의 Case 메커니즘을 개선했다. 이 방법은 자연어 요구 사항을 단계별로 분석하여 유스케이스를 모델링한다. 또한 유스케이스 점수(Use Case Point)를 이용하여 소프트웨어의 공수를 산정(Effort Estimation)한다. 제안한 방법은 고품질 소프트웨어 개발을 위해 자연어 요구사항의 변경 없이 유스케이스 추출이 가능하다. 또한 추출된 유스케이스를 통해 UCP 기반의 공수 산정을 평가할 수 있다. 본 논문에서는 우체국 시스템의 사례에 적용하였다.

A Software Cost Estimation Using Growth Curve Model (성장곡선을 이용한 소프트웨어 비용 추정 모델)

  • Park, Seok-Gyu;Lee, Sang-Un;Park, Jae-Heung
    • The KIPS Transactions:PartD
    • /
    • v.11D no.3
    • /
    • pp.597-604
    • /
    • 2004
  • Accurate software cost estimation is essential to both developers and customers. Most of the cost estimating models based on the size measure methods, such as LOC and FP, are obtained through size estimation. The accuracy of size estimation directly influences the accuracy of cost estimation. As a result, the overall structure of regression-based cost models applies the power function based on software size. Many growth phenomenon in nature such as the growth in living organism, performance of technology, and learning capability of human show an S-shaped curve. This paper proposes a model which estimates the developing effort by using the growth curve. The presented model assumes that the relation cost and size follows the growth curve. The appropriateness of the growth curve model based on Function Point, Full-Function Point and Use-Case Point, which are the general methods in estimating the software size have been confirmed. The proposed growth curve model shows similar performance with power function model. In conclusion, the growth curve model can be applied in the estimation of the software cost.

On a Logical Path Design for Optimizing Power-delay under a Fixed-delay Constraint (고정 지연 조건에서 전력-지연 효율성의 최적화를 위한 논리 경로 설계)

  • Lee, Seung-Ho;Chang, Jong-Kwon
    • The KIPS Transactions:PartA
    • /
    • v.17A no.1
    • /
    • pp.27-32
    • /
    • 2010
  • Logical Effort is a simple hand-calculated method that measures quick delay estimation. It has the advantage of reducing the design cycle time. However, it has shortcomings in designing a path for minimum area or power under a fixed-delay constraint. In this paper, we propose an equal delay model and, based on this, a method of optimizing power-delay efficiency in a logical path. We simulate three designs of an eight-input AND gate using our technique. Our results show about 40% greater efficiency in power dissipation than those of Logical Effort method.

A Study of Development Schedule Estimation Based on Development Type (소프트웨어 개발형태 기반 개발기간 추정 연구)

  • Park Seok-Gyu;Kim Woon-Yong
    • Journal of the Korea Computer Industry Society
    • /
    • v.7 no.3
    • /
    • pp.191-198
    • /
    • 2006
  • Area of software measurement is active more than thirty years. There is a huge collection of researches but still no concrete software development effort, duration and cost estimation model. The data sets used to conduct previous studies in the duration estimation model are often small and not too recent, these types of models should not be apply in recent projects that have complex architecture and various development environment. Therefore, Oligny et al. presents empirical models that predict software project duration in accordance with project platform based on project effort using the log data transformation. These models are based on the analysis of 396 project data provided by release 4 of the ISBSG Benchmark. Applying Oligny et al.'s models to 534 project data provided release 6 of the ISBSG Benchmark, the project duration is affected by development type more than development platform. Therefore, This paper presents the model of duration estimation according to development type. This paper proves the duration is more affected by development type than development platform. And, The model according to development type is more adequate for duration estimation.

  • PDF

Sigmoid Curve Model for Software Test-Effort Estimation (소프트웨어 시험 노력 추정 시그모이드 모델)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.11D no.4
    • /
    • pp.885-892
    • /
    • 2004
  • Weibull distribution Iincluding Rayleigh and Exponential distribution is a typical model to estimate the effort distribution which is committed to the software testing phase. This model does not represent standpoint that many efforts are committed actually at the test beginning point. Moreover, it does not properly represent the various distribution form of actual test effort. To solve these problems, this paper proposes the Sigmoid model. The sigmoid function to be applicable in neural network transformed into the function which properly represents the test effort of software in the model. The model was verified to the six test effort data which were got from actual software projects which have various distribution form and verified the suitability. The Sigmoid model nay be selected by the alternative of Weibull model to estimate software test effort because it is superior than the Weibull model.

Performance Analysis of MUSIC-Based Jammer DOA Estimation Technique for a Misaligned Antenna Array

  • Park, Kwansik;Seo, Jiwon
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.9 no.1
    • /
    • pp.7-13
    • /
    • 2020
  • As a countermeasure against the threat of jamming which can disrupt operation of the Global Positioning System (GPS) receivers, various kinds of technique to estimate the Direction-Of-Arrivals (DOAs) of incoming jamming signals have been widely studied, and among them, the MUltiple SIgnal Classification (MUSIC) algorithm is known to provide very high resolution. However, since the previous studies regarding the MUSIC algorithm does not consider the orientation of each antenna element of antenna arrays, there is a possibility that DOA estimation performance degrades in the case of a misaligned antenna array whose antenna elements are not oriented along the same direction. As an effort to solve this problem, there exists a previous work which presents an MUSIC-based method for DOA estimation. However, the error between the real and measured values of each antenna orientation is not taken into consideration. Therefore, in this paper, the effect of the aforementioned error on the DOA estimation performance in the case of a misaligned antenna array is analyzed by simulations.

Estimation of Effect for Vibration and Displacement Occurred by Steel Tube Jacked under Railroad (철로하부의 강관압입 시 발생되는 지반변위 및 진동에 대한 영향평가)

  • 박승욱;김홍기;박해일
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.568-577
    • /
    • 2001
  • An important and cotinuing research effort has been concentrated to estimate safety for behavior of soil nearby construction site. This construction under ground would cause the soil to deform and vibrate at any direction. This paper presents to estimation of safety for movement and reliability for vibration due to steel tube jacked under ground.

  • PDF