축-토크법을 이용한 새로운 발전기 효율시험 방법의 제안 (Proposal of A Novel Generator Efficiency Test Using The Shaft-Torque Method)

  • 김현한;옥연호;김광호
    • 전기학회논문지
    • /
    • 제63권4호
    • /
    • pp.461-468
    • /
    • 2014
  • An efficiency test for generators is generally required in case of construction of a new power plant or replacement of an existing generator. Generally, the efficiency of generator is measured by the input-output ratio under any given condition. Therefore, the best way is to directly measure the value of input and output power of a generator and calculate the efficiency values. However, it is difficult to measure a generator's input values accurately, especially for large systems. So, we are usually measuring the losses of the generator. But for measuring these values, there are several constraints for test such as preparing additional power generator and releasing the protection relay for manual operation of auxiliary equipments. Therefore, this study suggests that a novel generator efficient test method using the shaft-torque method which can be carried out while the generator is normally operating. The reliability of the result value was verified by comparing with the efficiency test results of the conventional retardation method on IEEE Std 115-1995.

원자력 증기발생기 튜브/튜브시트 확관방법별 특성평가 (The Evaluation of Tube to Tubesheet Joint Part on Nuclear S/G)

  • 심상한;배강국;김인수
    • 대한용접접합학회:학술대회논문집
    • /
    • 대한용접접합학회 1996년도 특별강연 및 춘계학술발표 개요집
    • /
    • pp.34-37
    • /
    • 1996
  • The expanding method of tube to tubesheet joint part on neclear steam generators are classified into three classes of roller expanding, explosive expanding and hydraulic expanding. After the expanded Mock-Up specimen are made by the three expanding method. The general properties, microstructure/microvickers hardness, pull-out strength, hydraulic leak pressure, of tube to tubesheet joint part were inspected. and We evaluated the operation efficiency of expansion, reproduction of expanded joint about three expanding method. Through the overall evaluation of tube to tubesheet joint part, The hydraukic expanding and explosive expanding could be certificated more useful expanding method.

  • PDF

스팀터빈 발전기 진동진단 시스템 개발 (Development of a Vibration Diagnostic System for Steam Turbine Generators)

  • 이안성;홍성욱;김호종;이현
    • 소음진동
    • /
    • 제5권4호
    • /
    • pp.543-553
    • /
    • 1995
  • Modern steam turbine generators are being built as a higher power and larger system, experiencing more frequent starts and stops of operation due to a constant change of power demands. Hence, they are inevitably more vulnerable to various vibrations, and more often exposed to the danger of sudden vibration accidents than ever before. Even under the circumstances, in order to secure the system reliability of steampower plants and there by to supply safely the public electricity, it is important to prevent a sudden vibration accident in one hand and even when it happens, to raise an operating efficiency of the plants throught swift and precise treatments in the other. In this study, an interactive vibration diagnostic system has been developed to make the on-site vibration diagnosis of steam turbine generators possible and convenient, utilizing a note-book PC. For this purpose, at first the principal vibration phenomena, such as various unbalance and unstable vibrations as well as rubbing, misalignment, and shaft crack vibrations, have been systematically classified as grouped parameters of vibration frequencies, amplitudes, phases, rotating speeds at the time of accident, and operating conditions or condition changes. A new complex vibration diagnostic table has been constructed from the causal relations between the characteristic parameters and the principal vibration phenomena. Then, the diagnostic system has been developed to screen and issue the corresponding vibration phenomena by assigning to each user-selected combination of characteristic parameters a unique characteristic vector and comparing this vector with a diagnostic vector of each vibration phenomenon based on the constructed diagnostic table. Moreover, the diagnostic system has a logic whose diagnosis may be performed successfully by inputing only some of the corresponding characteristic parameters without having to input all the parameters. The developed diagnostic system has been applied to perform the diagnosis of several real cases of steam turbine vibration accidents. And the results have been quite satisfactory.

  • PDF

수평 병렬형 풍력 발전기의 요각 및 MPPT 제어 (MPPT and Yawing Control of a New Horizontal-Axis Wind Turbine with Two Parallel-Connected Generators)

  • 이국선;최익;조황;백주훈
    • 한국전자통신학회논문지
    • /
    • 제7권1호
    • /
    • pp.81-89
    • /
    • 2012
  • 범용적으로 사용되고 있는 수평형 풍력 터빈(HAWT)은 블레이드가 장착된 터빈이 회전부인 너셀에 고정되어 타워의 최상단에 지지되는 구조이다. 터빈에서 생산되는 전력은 너셀 내부에서 증속기를 통하여 발전기로 들어가게 된다. 발전기에서 생산되는 전력은 타워를 통해서 지상과 송전선으로 연결되므로 너셀의 요잉이 발생하는 경우 송전선의 꼬임이 발생하게 된다. 따라서 이를 방지하기 위한 슬립링이나 추가적인 요잉 제어 알고리즘이 필요한 단점이 있다. 제안하는 새로운 구조의 HAWT는 베벨기어와 중공축을 이용하여 송전선 문제를 해결하였다. 또한, 병렬로 접속된 두개의 발전기를 이용하여 요잉이 용이할 뿐 아니라 생산 전력을 분산시킴으로써 인버터의 용량을 줄일 수 있다. MPPT 알고리즘과 요잉 제어를 수행하는 시뮬레이션을 통해서 제안하는 구조가 풍력 발전에 효과적임을 보였다.

Analysis of Key Parameters for Inductively Coupled Power Transfer Systems Realized by Detuning Factor in Synchronous Generators

  • Liu, Jinfeng;Li, Kun;Jin, Ningzhi;Iu, Herbert Ho-Ching
    • Journal of Power Electronics
    • /
    • 제19권5호
    • /
    • pp.1087-1098
    • /
    • 2019
  • In this paper, a detuning factor (DeFac) method is proposed to design the key parameters for optimizing the transfer power and efficiency of an Inductively Coupled Power Transfer (ICPT) system with primary-secondary side compensation. Depending on the robustness of the system, the DeFac method can guarantee the stability of the transfer power and efficiency of an ICPT system within a certain range of resistive-capacitive or resistive-inductive loads. A MATLAB-Simulink model of a ICPT system was built to assess the system's main evaluation criteria, namely its maximum power ratio (PR) and efficiency, in terms of different approaches. In addition, a magnetic field simulation model was built using Ansoft to specify the leakage flux and current density. Simulation results show that both the maximum PR and efficiency of the ICPT system can reach almost 70% despite the severe detuning imposed by the DeFac method. The system also exhibited low levels of leakage flux and a high current density. Experimental results confirmed the validity and feasibility of an ICPT system using DeFac-designed parameters.

디젤발전기의 출력비에 따른 효율을 고려한 마이크로그리드에서의 BESS와 디젤발전기의 최적 운영 기법에 관한 연구 (A Study on Methodology of Optimal Operation of BESS and Diesel Generators in a Microgrid Considering Efficiency Characteristics According to the Power Ratios of Diesel Generators)

  • 이병하
    • 전기학회논문지
    • /
    • 제65권4호
    • /
    • pp.539-546
    • /
    • 2016
  • With the growing interest of microgrid systems all over the world, many studies on microgrid operation are being carried out. The battery energy storage system(BESS) and the diesel generator are key equipments in the microgrid. In this paper, we analyze the characteristics of fuel consumption according to the power ratio of the diesel generator. Then, the formula to represent the unit cost of generation according to the power ratio of the diesel generator is derived. A new modeling of battery operation is presented considering the lifetime reduction according to increasing the cycles of charge/discharge operation of the battery. The methodology of determining the optimal operation of the battery and the diesel generator is presented by the use of the formula of fuel consumption of the diesel generator and the new modeling of battery operation. It is shown that this optimization methodology can be applied effectively for economical operation of the BESS and the diesel generator of a microgrid by case studies.

풍력발전기용 Yaw gearbox의 가속 수명시험에 관한 연구 (A Study on the Accelerated Life Test of Yaw Gearbox for Wind Turbine)

  • 이용범;이기천;이종직;임신열
    • 드라이브 ㆍ 컨트롤
    • /
    • 제21권1호
    • /
    • pp.16-21
    • /
    • 2024
  • The yaw gearbox is a key device in a wind power generator that improves power generation efficiency by rotating hundreds of tons (400 to 600 tons) of nacelle so that the blade reaches 90 degrees in the wind direction. Recently, installation sites have been advancing from land to sea as they have become super-large at (8-12) MW to increase the economic feasibility of wind power generators and utilize excellent wind resources, and the target life of large wind power generators is 25 to 30 years. The yaw gearbox of 6 to 12 sets is installed in a very complex place inside the nacelle on the tower with parallels, and it is important to secure the reliability of the yaw gearbox because if a failure occurs after installation, it costs tens to hundreds of times the price of a new product to restore. In this study, equivalent loads were calculated by analyzing failure mode and field data, accelerated life test conditions were established, and a test device was constructed to perform the accelerated life tests and performance tests to ensure the reliability of the gearbox.

Maximum Power Tracking Control for parallel-operated DFIG Based on Fuzzy-PID Controller

  • Gao, Yang;Ai, Qian
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권6호
    • /
    • pp.2268-2277
    • /
    • 2017
  • As constantly increasing wind power penetrates power grid, wind power plants (WPPs) are exerting a direct influence on the traditional power system. Most of WPPs are using variable speed constant frequency (VSCF) wind turbines equipped with doubly fed induction generators (DFIGs) due to their high efficiency over other wind turbine generators (WTGs). Therefore, the analysis of DFIG has attracted considerable attention. Precisely measuring optimum reference speed is basis of utilized maximum wind power in electric power generation. If the measurement of wind speed can be easily taken, the reference of rotation speed can be easily calculated by known system's parameters. However, considering the varying wind speed at different locations of blade, the turbulence and tower shadow also increase the difficulty of its measurement. The aim of this study is to design fuzzy controllers to replace the wind speedometer to track the optimum generator speed based on the errors of generator output power and rotation speed in varying wind speed. Besides, this paper proposes the fuzzy adaptive PID control to replace traditional PID control under rated wind speed in variable-pitch wind turbine, which can detect and analyze important aspects, such as unforeseeable conditions, parameters delay and interference in the control process, and conducts online optimal adjustment of PID parameters to fulfill the requirement of variable pitch control system.

Development of an Adaptive Overcurrent Relaying Algorithm for Distribution Networks Embedding a Large Scaled Wind Farm

  • Jang, Sung-Il;Kim, Ji-Won;Kim, Kwang-Ho
    • KIEE International Transactions on Power Engineering
    • /
    • 제3A권4호
    • /
    • pp.198-205
    • /
    • 2003
  • This paper proposes the adaptive relaying of protective devices applied in the neighboring distribution feeders for reliable and efficient operations of a wind farm interconnected with distribution networks by dedicated lines. A wind farm connected to an electric power network is one of the greatest alternative energy sources. However, the wind turbine generators are influenced by abnormal grid conditions such as disturbances occurring in the neighboring distribution feeders as well as the dedicated power. Particularly, in cases of a fault happening in the neighboring distribution feeders, a wind farm might be accelerated until protective devices clear the fault. Therefore, the delayed operation time of protective devices for satisfying the coordination might overly expose the interconnected wind turbine generators to the fault and cause damage to them. This paper describes the proper delayed operation time of protective relay satisfying the coordination of the distribution networks as well as reducing damage on the interconnected wind farm. The simulation results for the Hoenggye substation model composed of five feeders and one dedicated line using PSCAD/EMTDC showed that the proper delayed time of protective devices reflecting the fault condition and the power output of the wind farm could improve the operational reliability, efficiency, and stability of the wind farm.

Dynamic Simulation of Pump-Storage Power Plants with different variable speed configurations using the Simsen Tool

  • Kruger, Klaus;Koutnik, Jiri
    • International Journal of Fluid Machinery and Systems
    • /
    • 제2권4호
    • /
    • pp.334-345
    • /
    • 2009
  • Pumped storage power plants are playing a significant role in the contribution to the stabilization of an electrical grid, above all by stable operation and fast reaction to sudden load respectively frequency changes. Optimized efficiency and smooth running characteristics both in pump and turbine operation, improved stability for synchronization in turbine mode, load control in pump mode operation and also short reaction times may be achieved using adjustable speed power units. Such variable speed power plants are applicable for high variations of head (e.g. important for low head pump-turbine projects). Due to the rapid development of power semiconductors and frequency converter technology, feasible solutions can be provided even for large hydro power units. Suitable control strategies as well as clear design criteria contribute significantly to the optimal usage of the pump turbine and motor-generators. The SIMSEN tool for dynamic simulations has been used for comparative investigations of different configurations regarding the power converter topology, types of semiconductors and types of motor-generators including the coupling to the hydraulic system. A brief overview of the advantages & disadvantages of the different solutions can also be found in this paper. Using this approach, a customized solution minimizing cost and exploiting the maximum usage of the pump-turbine unit can be developed in the planning stage of new and modernization pump storage projects.