Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery

  • Akinsiku, Olusegun Emmanuel;Akinsulire, Akintunde
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.25-31
    • /
    • 2012
  • The growing rate of delays is adversely affecting the timely delivery of construction projects. This study therefore assesses construction stakeholders' perception of the causes of delays and its effects on project delivery in a bid to proffer solution in minimizing the occurrences of delays. Questionnaire was used to elicit responses from construction stakeholders; a total of thirty three causes of delays, seventeen resultant effects of delays and fifteen methods of minimizing construction delays were identified for the study based on literature reviews. The results suggest that client's cash flow related problems are the main causes of delays while time and cost overruns are the major identifiable effects of delays in construction projects. However, adequate project planning and budgeting were suggested as possible ways of minimizing the occurrences of delays.

Reshoring effects on deflections of multi-shored flat plate systems under construction

  • Kang, Su-Min;Eom, Tae-Sung;Kim, Jae-Yo
    • Structural Engineering and Mechanics
    • /
    • v.45 no.4
    • /
    • pp.455-470
    • /
    • 2013
  • RC flat plates that have no flexural stiffness by boundary beams may be governed by a serviceability as well as a strength condition. A construction sequence and its impact on the distributions of construction loads among slabs tied by shores are decisive factors influencing immediate and long term performances of flat plate. Over-loading and tensile cracking in early-aged slabs significantly increase the deflection of a flat plate system under construction. A reshoring work may be helpful in reducing slab deflections by controlling the vertical distributions of construction loads in a multi-shored flat plate system. In this study, a change of construction loads by reshoring works and its effects on deflections of flat plate systems under construction are analyzed. The slab construction loads with various reshoring schemes are defined by a simplified method, and the practical calculation of slab deflections with considering construction sequences and concrete cracking effects is applied. From parametric studies, the reshoring works are verified to reduce construction loads and slab deflections.

Effects of a Dam Construction on the Radial Growths of Pinus densiflora (댐건설이 소나무의 연륜생장에 미치는 영향)

  • 정연숙
    • The Korean Journal of Ecology
    • /
    • v.21 no.3
    • /
    • pp.251-255
    • /
    • 1998
  • To elucidate the effects of a hydroelectric dam construction on annual ring growth of Pinus densiflora, the annual ring widths of 68 trees collected from 7 sites were closely examined. The result was analyzed to ask three special questions first, whether there are real effects of dam construction on the radial growth second, would the magnitude of the effect be different due to two periods of under-construction and post-construction the last, would it be different among age classes. Annual ring growth has been significantly enhanced by the dam construction. Specially, its effect was marked after the construction was finished and the reservoir was filled up with water. There was, however, no remarkable evidence that pine growth would be reduced while the dam was under construction, even though there was a minor decreasing trend. The magnitude of the effect was different among age groups. That is, the changed condition after the construction enhanced relatively the growth of aged trees monre. According to other meterological research since the dam was constructed, the reasons of enhancing pine growth assumed to be the increase of daily temperature, the decreased of daily temperature difference and the increased of rainy days.

  • PDF

A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

  • Oshungade, Oluwaseun O.;Kruger, Deon
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.13-25
    • /
    • 2017
  • Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants - clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor's experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.

Analysis of Multi-Story Prestressed Concrete Structure Considering the Effect of Construction Stage (시공단계의 영향을 고려한 프리스트레스 콘크리트 다층 구조물의 해석)

  • Jeon, Chan-Ki
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.213-223
    • /
    • 2001
  • This paper presents an analytical procedure for the time-dependent analysis of the multi-story prestressed concrete structure under the construction stage. To account for the actual structural behavior, the procedure considers the effects due to the construction interval and the time-dependent losses of prestress at every construction step on the entire structural response. A numerical study is performed to demonstrate the general validity of the approach and to quantitatively evaluate the effects resulted from the time-dependent behaviors during construction. Recommendations and conclusions are developed by comparisons with structural responses using the present and conventional methods of analysis. The comparative results show that both effects of sequential construction and time-dependent prestress losses should be considered for the construction stage analysis.

  • PDF

Effects of Extending Duration of Nighttime Road Construction (도로품질 향상을 위한 야간 도로공사 시간확대의 영향분석)

  • Lee, Dongmin;Choi, Junseong;Park, Jejin;Park, Yongjin
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.153-162
    • /
    • 2017
  • PURPOSES : This study was conducted to analyze the effects arising from extending the duration of nighttime road construction on improving road quality and durability. METHODS : Most previous studies estimating the social cost of various construction conditions did not consider road pavement cooling time as a factor in improving road pavement quality. This study investigated the feasibility of achieving higher road quality and durability by extending the duration of nighttime road construction time extension. For this investigation, the effects of such an extension on traffic conditions were analyzed based on micro-simulation studies and scenario-based cost-benefit analyses, using factors including traffic volume, delay, construction cost, and road pavement cooling time. RESULTS : The results of the traffic simulation studies and cost-benefit analyses indicate that the current road construction method that emphasizes completing nighttime road construction by 6 a.m. reduces pavement life while causing relatively little traffic delay. If the night construction time is instead extended to 2 p.m., road pavement lifetime is increased, reducing road re-construction cost. These savings are greater than the cost of congestion arising from extending the duration of nighttime construction. CONCLUSIONS : The current nighttime construction durations need to be extended in order to efficiently manage roads and reduce road management costs.

Analysis on The Economic Impacts of Construction New Excellent Technology (건설신기술의 경제적 파급효과 분석)

  • Paek, Nam-Jong;Park, Hwan-Pyo;Lee, Kyo-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.115-124
    • /
    • 2011
  • The Construction New Excellent Technology was introduced to promote the development of domestic construction technology and enhance national competitiveness, by inspiring the development desire of technology developers in 1989. Domestic Construction New Excellent Technology is first introduced in 1989, the total 596 cases were assigned to the new technology and it was used the construction site. Also, it was achieved the quantitative performance of thirty-hundred applications and was effected to the domestic construction industry. However, the systematic analysis about the introduction effects of Construction New Excellent Technology are none. Therefore, the quantitative analysis of economic effects in construction industry have to a justification in according to operation of Construction New Excellent Technology system and verification of superiority. And then, the Construction New Excellent Technology system needs a developing base in the future. In this study, The Economic Impacts of Construction New Excellent Technology were analyzed in quantitatively such as a cost savings effects, the employment effects, the effects on Value-added, the import substitution effects due to use of Construction New Excellent Technology. This study will be used promotion of economics and superiority in the Construction New Excellent Technology.

A Development of Construction Industry Production Index(CIPI) with Temperature Effects (기온효과를 고려한 건설업생산지수 예측모델 개발)

  • Kim, Seok-Jong;Kim, Hyun-Woo;Chin, Kyung-Ho;Jang, Han-Ik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.103-112
    • /
    • 2013
  • After 1990s, the influence of construction industry has been decreased on national economy and construction business condition has been changed on economic recession and boom repeatedly. Larger fluctuation of business condition makes a forecast of it to be more difficult. Uncertainty in business prediction results in damages on construction companies and stakeholders. Therefore, study on forecasting a construction business is very important. This study suggests the Construction Industry Production Index(CIPI) to predict a construction business in consider of temperature effects. The results show that construction business is much influenced by temperature effects certainly and GDP. With the CBFM, this study examines CIPI for 2013 with two scenarios: 1)with GDP growth rate of 3.5% 2)with GDP growth rate of 2.4%. Thus, CIPI would be used as the economic state index to display the construction business conditions. Also, CIPI will be utilized as basic methodology in the impact of climate change in the construction industry.

RELEVANT CODES AND REGULATIONS: EFFECTS ON THE DESIGN OF INDUSTRIAL CONSTRUCTION

  • Ahmed Abdallah
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.409-416
    • /
    • 2005
  • This paper presents the possible effects and restrictions that may arise in the field of industrial construction due to compliance with relevant construction codes and regulations, as well as the ways they can be favorably handled in the design of industrial buildings. Designs should be based primarily on human design factors, while considering the human as the centre of the work environment. Design parameters should be described as a function of both the physical and psychosocial attributes of a person as well as the technical and economical aspects on the design of industrial construction. This paper is an examination of the connection that exists between design law (codes and regulations) and industrial construction. The relevant construction laws and regulations are described, including standards and codes of practice that designing and supervising engineers are obliged to observe. Possible solutions and consequences of development in the production, constructional, and ergonomic field of design are also discussed.

  • PDF

A Study on the Evaluation of the Environmental Impact of Energy Usage in Construction Sites (건설현장 내 에너지 사용량에 따른 환경영향 평가에 관한 연구)

  • Lee, Chung-Won;Tae, Sung-Ho;Jang, Hyeong-Jae;Lim, Hyo-Jin;Kim, Hyeon-Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.119-120
    • /
    • 2022
  • As the seriousness of the climate crisis is emphasized, movements to solve it are becoming active. In Korea, efforts to reduce environmental impacts across all industries are being strengthened through the Framework Act on Low Carbon Green Growth. The construction industry predicts the environmental impact of buildings during the entire life cycle, but in the construction process, there is a difference in energy usage depending on the amount of input, and it is difficult to predict the environmental impact if data cannot be collected. Therefore, this study evaluated the environmental impact of energy usage in the apartment construction process as part of the study on predicting and reducing the environmental impact of the construction process of the construction site. To this end, the environmental effects of buildings were set as global warming, resource consumption, and ozone layer effects, and the environmental effects of the actual energy use in the case were evaluated. In addition, based on the evaluation results, the characteristics of the input energy usage were compared and analyzed.