• Title/Summary/Keyword: Effective Lead Time

Search Result 371, Processing Time 0.031 seconds

Pipeline defect detection with depth identification using PZT array and time-reversal method

  • Yang Xu;Mingzhang Luo;Guofeng Du
    • Smart Structures and Systems
    • /
    • v.32 no.4
    • /
    • pp.253-266
    • /
    • 2023
  • The time-reversal method is employed to improve the ability of pipeline defect detection, and a new approach of identifying the pipeline defect depth is proposed in this research. When the L(0,2) mode ultrasonic guided wave excited through a lead zirconate titinate (PZT) transduce array propagates along the pipeline with a defect, it will interact with the defect and be partially converted to flexural F(n, m) modes and longitudinal L(0,1) mode. Using a receiving PZT array attached axisymmetrically around the pipeline, the L(0,2) reflection signal as well as the mode conversion signals at the defect are obtained. An appropriate rectangle window is used to intercept the L(0,2) reflection signal and the mode conversion signals from the obtained direct detection signals. The intercepted signals are time reversed and re-excited in the pipeline again, result in the guided wave energy focusing on the pipeline defect, the L(0,2) reflection and the L(0,1) mode conversion signals being enhanced to a higher level, especially for the small defect in the early crack stage. Besides the L(0,2) reflection signal, the L(0,1) mode conversion signal also contains useful pipeline defect information. It is possible to identify the pipeline defect depth by monitoring the variation trend of L(0,2) and L(0,1) reflection coefficients. The finite element method (FEM) simulation and experiment results are given in the paper, the enhancement of pipeline defect reflection signals by time-reversal method is obvious, and the way to identify pipeline defect depth is demonstrated to be effective.

Nutrients removal on Oxic/Anoxic time ratio in 2-stage-intermittent-aeration reactor (2단 간헐 포기조의 포기/비포기 시간비에 따른 영양염류 제거특성)

  • Kim, Hong Tae;Sin, Seok U;O, Sang Hwa;Gwon, Seong Hyeon
    • Journal of Environmental Science International
    • /
    • v.13 no.7
    • /
    • pp.675-680
    • /
    • 2004
  • This study was conducted to remove organics and nutrients using 2 stage intermittent aeration reactor. First reactor, using suspended microbial growth in intermittent aeration instead of anaerobic reactor in the typical BNR process, used minimum carbon source to release P, and it was possible to reduce ammonia loading going to second reactor. In the second reactor, using moving media intermittent aeration, it was effective to reduce nitrate in non-aeration time by attached microorganisms having long retention time. In aeration time, nitrification and P uptake were taken place simultaneously. From the experiment, two major results were as follows. First, the removal of organics was more than 90%, and optimum aeration/non-aeration time ratio for organic removal was corresponded with aeration/non-aeration time ratio for nitrogen removal. Second, in the first reactor, optimum aeration/non-aeration time ratio was 15/75 (min.) because it was necessary to maintain 75 min. of non-aeration time to suppress of impediment of return nitrate and to lead release of phosphate. In the second reactor, optimum aeration/non-aeration time ratio was 45/90 (min.).

An Empirical Study for the Safe and Effective Operations in Membrane LNG Ships focused on the Tank Cool Down

  • Gim, S.G.;Kim, S.W.
    • 유체기계공업학회:학술대회논문집
    • /
    • 2005.12a
    • /
    • pp.566-572
    • /
    • 2005
  • The most crucial factor in membrane LNG ships to ensure sage operations, is how to effectively control tank pressure at the time of excessive generation of boil off gas (BOG). When the ships carry out tank cool down with her retaining heel prior to arrival at loading port, the vessel encounters the critical situation of excessive BOG and high tank pressure that can lead to high degree of risk. This is to provide one of the best ways to secure safe and effective LNG ship operations focusing on the detailed methods of tank cool down to achieve ATR(Arrival Temperature requirement) without building up high tank pressure and excessive BOG and calculating the appropriate heel quantity to be unutilized for tank cool down and fuel during ballast voyage.

  • PDF

Structure, signaling and the drug discovery of the Ras oncogene protein

  • Han, Chang Woo;Jeong, Mi Suk;Jang, Se Bok
    • BMB Reports
    • /
    • v.50 no.7
    • /
    • pp.355-360
    • /
    • 2017
  • Mutations in Ras GTPase are among the most common genetic alterations in human cancers. Despite extensive research investigating Ras proteins, their functions still remain a challenge over a long period of time. The currently available data suggests that solving the outstanding issues regarding Ras could lead to development of effective drugs that could have a significant impact on cancer treatment. Developing a better understanding of their biochemical properties or modes of action, along with improvements in their pharmacologic profiles, clinical design and scheduling will enable the development of more effective therapies.

Permeability-increasing effects of hydraulic flushing based on flow-solid coupling

  • Zhang, Jiao;Wang, Xiaodong
    • Geomechanics and Engineering
    • /
    • v.13 no.2
    • /
    • pp.285-300
    • /
    • 2017
  • Shallow coal resources are increasingly depleted, the mining has entered the deep stage. Due to "High stress, high gas, strong adsorption and low permeability" of coal seam, the gas drainage has become more difficult and the probability of coal and gas outburst accident increases. Based on the flow solid coupling theory of coal seam gas, the coupling model about stress and gas seepage of coal seam was set up by solid module and Darcy module in Comsol Multiphysics. The gas extraction effects were researched after applying hydraulic technology to increase permeability. The results showed that the effective influence radius increases with the expanded borehole radius and drainage time, decreases with initial gas pressure. The relationship between the effective influence radius and various factors presents in the form: $y=a+{\frac{b}{\left(1+{(\frac{x}{x_0})^p}\right)}}$. The effective influence radius with multiple boreholes is obviously larger than that of the single hole. According to the actual coal seam and gas geological conditions, appropriate layout way was selected to achieve the best effect. The field application results are consistent with the simulation results. It is found that the horizontal stress plays a very important role in coal seam drainage effect. The stress distribution change around the drilling hole will lead to the changes in porosity of coal seam, further resulting in permeability evolution and finally gas pressure distribution varies.

The Effectiveness of Order Release Strategies considering Production Plan and Dispatching Rules (생산계획 및 우선순위규칙에 따른 Order Release 정책의 유효성에 관한 연구)

  • 최병대;이기창;박찬권;박진우
    • Journal of the Korea Society for Simulation
    • /
    • v.8 no.4
    • /
    • pp.73-87
    • /
    • 1999
  • Order Review/Release (ORR) System is the linkage between planning system and actual production. Reduction of the waiting time on the machines, work in process and lead time variation may be achieved by adopting ORR strategies. But researchers on the ORR do not agree on the effectiveness of ORR. Some say that the overall system flow time may be increased if ORR is adopted, but others say that ORR can reduce work in process, flow time and variation of flow time. The objective of this research is to clarify under what environments order release strategy is effective. Simulation study was conducted in a hypothetical job shop. The experimental results show that dispatching rule is much more important than ORR is in controlling the shop floor. But the results indicate that ORR can reduce mean shop flow time, average work in process and variation of shop flow time under such environments where utilization level is high and planned order is weekly released to the order pool. And the results also show that the effect of plan smoothing on the ORR is insignificant, which is inconsistent with the results of the previous researches.

  • PDF

The Causes and Developmental Mechanism of Insomnia (불면증의 원인과 발생기전)

  • Lee, Sung-Hoon
    • Sleep Medicine and Psychophysiology
    • /
    • v.1 no.1
    • /
    • pp.3-8
    • /
    • 1994
  • With the recent development of sleep medicine, insomnia has been perceived as a disease from a simple symptom. As there are various causes in a disease, proper treatment according to each cause is necessary for a more effective treatment In general, insomnia is classified into five categrories of physical, physiological, psychological, psychiatric and pharmacological aspects. However, such categorizations are often insufficient in treating insomnia. Furthermore understanding of the developmental mechanisms of insomnia is required. The function of sleep is developed and maintained through the balance of the reciprocal forces of sleep and arousal. These forces are contantly regulated by what is called a circadian rhythm. Sleep is induced by this rhythm which is affected by factors such as awakening time in the morning, amount of intellectual function, amount and time length of physical exercise and sunlight Insomnia could develop when this rhythm is delayed and leads to a "forbidden zone" which is a very difficult period for inducing sleep about two to four hours before the routine bedtime. Whereas sleep gradually develops in line with the circardian rhythm, arousal can occur very abruptly by any cause triggered by emotional discomfort or anxiety. Such characteristic and emotional factors as perfectionism, separation anxiety, secondary gain, insecurity, and negative cognition may provoke the inner anxiety and fear for insomnia, which can lead acute insomnia to a chronic one. As chronic insomnia is developed by multiple causes and factors, integrated approaches through analysis of above mentioned factors will be more effective in the treatment of insomnia than a simple administration of hypnotics.

  • PDF

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

Applications of Data Mining Techniques to Operations Planning for Real Time Order Confirmation (실시간 주문 확답을 위한 데이터 마이닝 기반 운용 계획 모델)

  • Han Hyun-Soo;Oh Dong-Ha
    • Korean Management Science Review
    • /
    • v.21 no.3
    • /
    • pp.101-113
    • /
    • 2004
  • In the rapidly propagating Internet based electronic transaction environment. the importance of real time order confirmation has been more emphasized, In this paper, using data mining techniques, we develop intelligent operations decision model to allow real time order confirmation at the time the customer places an order with required delivery terms. Among various operation plannings used for order fulfillment. mill routing is the first interface decision point to link the order receiving at the marketing with the production planning for order fulfillment. Though linear programming based mathematical optimization techniques are mostly used for mill routing problems, some early orders should wait until sufficient orders are gathered for optimization. And that could effect longer order fulfillment lead-time, and prevent instant order confirmation of delivery terms. To cope with this problem, we provide the intelligent decision model to allow instant order based mill routing decisions. Data mining techniques of decision trees and neural networks. which are more popular in marketing and financial applications, are used to develop the model. Through diverse computational trials with the industrial data from the steel company. we have reported that the performance of the proposed approach is effective compared to the present heuristic only mill routing results. Various issues of data mining techniques application to the mill routing problems having linear programming characteristics are also discussed.

A Study on Determining Single-Center Scheduling for LTV(LifeTime Value) Using Heuristic Method (휴리스틱 방법을 활용한 고객 생애 가치에 대한 단일 업체 일정계획 수립에 관한 연구)

  • 양광모;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.1
    • /
    • pp.83-92
    • /
    • 2003
  • Scheduling plays an important role in shop floor planning. A scheduling shows the planned time when processing of a specific job will start on each machine that the job requires. It also indicates when the job will be completed on every process. Thus, it is a timetable for both jobs and machines. There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty. Based on other objectives, many criteria may serve as s basis for developing job schedules. The process also comprises all strategic planning, capital investments, management decisions, and tasks necessary to create a new product. manufacturing processes must be created so that the product can be produced in the product facility. Purchasing new equipment and training workers may be required if new technology is to be used. Tools, fixtures, and the sequence of steps in the manufacturing processes must all be developed to allow rapid, high-quality, cost effective production. Also, it may be needed to be rearrange the production facility to adapt to the new manufacturing processes. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.