• Title/Summary/Keyword: ESS system

Search Result 539, Processing Time 0.024 seconds

Design of Smart Plug based Media Platform interlocking with ESS (ESS 연동형 스마트 플러그 기반의 미디어 플랫폼 설계)

  • Kang, Mingoo
    • Smart Media Journal
    • /
    • v.3 no.2
    • /
    • pp.37-42
    • /
    • 2014
  • In this paper, the function design of smart media platform control with smart monitoring, and displaying modules which have the priorities of smart plug based smart outlet, is proposed for electrical suppliance of essential information appliance in emergency power consumption situation(blackout, peaktime etc). The effect of power management will be maximized by this smart gateway interlocking with ESS(energy storage system) which has bi-directional power transmission control modules, and smart outlet based on the priority control actions.

A Study on the Off-Grid Photovoltaic Generation System with Sequential Voltage System (순차전압시스템을 고려한 독립형 태양광 발전 시스템에 관한 연구)

  • Kim, Gu-Yong;Bae, Jun-Hyung;Kim, Jong-Hae
    • Journal of IKEEE
    • /
    • v.24 no.1
    • /
    • pp.364-367
    • /
    • 2020
  • This paper presents the off-grid PV-ESS system of sequential voltage control method applied to OR logic gate. The conventional off-grid PV-ESS system with the low-voltage series connection has problems due to capacity expansion. To solve these problems, this paper proposes a noble PV-ESS system with high efficiency and low cost by applying sequential voltage control technique of the high-voltage series connection of analog circuit type. The input voltage of DC to AC inverter can be converted from the low-voltage by the combinations of series connection of the conventional cascaded 24V solar cell unit modules to the high-voltage of 384V in battery. The output voltage of the battery was 384V as the each input voltage of three phase DC to AC inverter, and the each output voltage of three phase 10kW DC to AC inverter is designed to be AC380V@60Hz as the line to line rms voltage value. To prove the validity of the theoretical analysis by PSIM simulation, the operating characteristics of sequential voltage control system with OR logic gate were confirmed through experiment results.

A Study to Prevent the Occurrence and Spread of Fire Caused by ESS Storage (ESS 저장창고로 인한 화재의 발생 및 확산방지를 위한 연구)

  • Shin, Joung Hyeon;Jo, Su Yeon;Kim, Geon-Woo;Jung, Ui In;Kim, Bong Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.140-141
    • /
    • 2021
  • ESS refers to a device that can store electrical energy produced by renewable energy generation, etc. and use it when necessary. Lithium-ion batteries are composed of high energy density and combustible electrolyte, so once ignited, it is difficult to extinguish. Many studies have been conducted to solve the problem of the battery itself as the cause of the fire. However, there is also a problem with the structure in which ESS(hereinafter referred to as ESS storage) is installed itself. Therefore, the purpose of this paper is to provide data to solve the problems related to ignition and fire spread due to the problem of ESS storage. In summer, the internal temperature of the ESS storage rises due to solar radiation to trigger a fire, so it is necessary to prevent an internal temperature rise due to solar radiation. Research on standards, materials used, structures, etc. for ESS storage and new regulations are required.

  • PDF

Operation Technology of PV-ESS Integrated Module for DC Micro Grid with Constant Power Tracking Algorithm (일정 전력 추종 알고리즘이 적용된 DC 마이크로 그리드용 PV-ESS 통합형 모듈의 운영 기술)

  • Ryu, Kyung;Kim, Jun-Mo;Lee, Jeong;Won, Chung-Yuen
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.25 no.6
    • /
    • pp.433-441
    • /
    • 2020
  • This study proposes a constant power tracking algorithm to compensate for the intermittent characteristics of Photovoltaic connected to a DC micro grid. A PV-ESS integrated module in which distributed ESS is additionally connected is utilized for the proposed algorithm. PV performs P&O MPPT control at all times. To supplement the intermittent characteristics of PV, the proposed constant power tracking algorithm maintains constant power by operating the distributed ESS of the PV-ESS integrated module in accordance with the output state of the PV. By performing PSIM simulation and an experiment, this study verifies the performance of the integrated module of PV-ESS for DC micro grids applying the constant power tracking algorithm.

Review of Dual Active Bridge Converter Applied to PV-ESS Hybrid System (태양광-ESS 하이브리드 시스템에 적용되는 DAB 컨버터 리뷰)

  • Lee, HanWoo;Lee, KyungSoo
    • Proceedings of the KIPE Conference
    • /
    • 2020.08a
    • /
    • pp.385-386
    • /
    • 2020
  • 최근, 에너지저장장치를 활용하여 태양광-ESS 하이브리드 시스템이 도입되고 있다. 태양광-ESS 하이브리드 시스템은 구성방식에 따라 다양한 전력변환장치를 활용한다. 그중 DAB 컨버터는 절연형이며, 양방향 전력전달이 가능하므로 스위칭 기법, 토폴로지 개발 등 연구가 활발히 진행되고 있다. 본 논문에서는 태양광-ESS 하이브리드 시스템에 적용되는 대표적인 벅-부스트 컨버터와 DAB 컨버터에 대해 리뷰한다.

  • PDF

Optimal Clustering of Energy Storage System for Frequency Regulation Service Considering Life Degradation (수명감소를 고려한 주파수 조정용 에너지저장장치의 최적 클러스터링)

  • Kim, Wook-Won;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.4
    • /
    • pp.555-560
    • /
    • 2016
  • Recently, many countries have placed great attention on energy security and climate changes. Governments are promoting the construction of renewable energy projects with regulatory support in Korea. Despite an increasing penetration of renewable resources, however, the photovoltaic and wind power are underutilized due to the endemic problems such as difficulties of output control and intermittent output. The Energy Storage System (ESS) is proposed as a good solution for solving the problems and has been studied in both the private business and the government. However, because of inefficient aspects, the research has been carried out for improving high costs and a small capacity. In addition, the ESS is currently installed for using only one purpose which is frequency regulation or transmission congestion relief such that has an economic limitation. Therefore, methods which are becoming economically justifiable to increase the penetration of the ESS is required. Thus, this paper presents in terms of operation efficiency to improve economic feasibility of the ESS currently used. mainly, there are two aspects for the operation efficiency. Firstly, it is intended to improve the utilization rate through a process that can utilize the ESS for various purposes. It is necessary to be able to use for other purposes by classifying and clustering for increasing the efficiency of availability. The clustering method is proposed to conduct the grouping the ESS. Especially, it is proposed to utilize ESS for frequency regulation service which is the one of ancillary services in the power system. Through case studies, it is confirmed to secure the necessary resources by clustering small size ESS.

Development and Simulation Verification of Operation System for Mobile ESS Test Equipment (ESS 이동형 시험장비용 운영시스템의 개발과 모의검증)

  • Shin, Je-Seok;Han, Hyun-Gyu;Kim, Jin-Tae;Lee, Seung-Min;Park, Chan-Wook;Lim, Geon-Pyo
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.3
    • /
    • pp.168-174
    • /
    • 2018
  • The performance test for 376MW ESS for frequency regulation currently operating in 13 substations is conducted based on the test procedure in the first and second steps. In the first step, components of ESS is moved to the certification authority where the test equipment is located in order to be proceeded with the test. In the second step, the performance test is conducted manually for the ESS equipments installed on site using the movable measurement equipment, and thus it can only be performed on some limited test items and requires a lot of time and manpower. Therefore, mobile test equipment for ESS(MOTES) is being developed that can perform automatically more test items for ESS in the field using the MOTES, and reduce manpower and time. To do this, an algorithm and a prototype of the operating system(MOS) are also being developed that can control MOTES automatically. In this paper, a development of the MOS prototype is introduced and then a simulation is performed to verify the prototype and its algorithm before the field demonstration.

A Study on the Method to Evaluate Minimum Capacity of Energy Storage System(ESS) for Micro Grid(MG) Design (확률론적 방법론을 이용한 마이크로그리드(MG)의 에너지 저장장치(ESS) 최소 필요용량 및 투자시점 결정방법)

  • Lee, Jae-Gul;Shin, Jeong-Hoon;Nam, Su-Chul;Baek, Sung-Muk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.8
    • /
    • pp.40-47
    • /
    • 2010
  • In this paper, we propose a probability method to determine minimum capacity of energy storage system(ESS) for Micro Grid(MG). Because of high capital cost of ESS, it's very important to determine optimal capacity of ESS and for stable operation of MG and we should determine minimum capacity of ESS. The proposed method has abilities to consider forced outage rate of generators and intermittent of non-dispatchable generators and minimum capacity make MG keep energy balancing by oneself.

Method of Minimizing ESS Capacity for Mitigating the Fluctuation of Wind Power Generation System (풍력발전의 출력 변동 저감을 위한 ESS 최소용량 산정기법)

  • Kim, Jae-Hong;Kang, Myeong-Seok;Kim, Eel-Hwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.5
    • /
    • pp.119-125
    • /
    • 2011
  • In this paper, we have studied about minimizing the Energy Storage System (ESS) capacity for mitigating the fluctuation of Wind Turbine Generation System (WTGS) by using Electric Double Layer Capacitor (EDLC) and Battery Energy Storage System (BESS). In this case, they have some different characteristics: The EDLC has the ability of generating the output power at high frequency. Thus, it is able to reduce the fluctuation of WTGS in spite of high cost. The BESS, by using Li-Ion battery, takes the advantage of high energy density, however it is limited to use at low frequency response. To verify the effectiveness of the proposed method, simulations are carried out with the actual data of 2MW WTGS in case of worst fluctuation of WTGS is happened. By comparing simulation results, this method shows the excellent performance. Therefore, it is very useful for understanding and minimizing the ESS capacity for mitigating the fluctuation of WTGS.

Lightweight Model for Energy Storage System Remaining Useful Lifetime Estimation (ESS 잔존수명 추정 모델 경량화 연구)

  • Yu, Jung-Un;Park, Sung-Won;Son, Sung-Yong
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.13 no.5
    • /
    • pp.436-442
    • /
    • 2020
  • ESS(energy storage system) has recently become an important power source in various areas due to increased renewable energy resources. The more ESS is used, the less the effective capacity of the ESS. Therefore, it is important to manage the remaining useful lifetime(RUL). RUL can be checked regularly by inspectors, but it is common to be monitored and estimated by an automated monitoring system. The accurate state estimation is important to ESS operator for economical and efficient operation. RUL estimation model usually requires complex mathematical calculations consisting of cycle aging and calendar aging that are caused by the operation frequency and over time, respectively. A lightweight RUL estimation model is required to be embedded in low-performance processors that are installed on ESS. In this paper, a lightweight ESS RUL estimation model is proposed to operate on low-performance micro-processors. The simulation results show less than 1% errors compared to the original RUL model case. In addition, a performance analysis is conducted based on ATmega 328. The results show 76.8 to 78.3 % of computational time reduction.