• Title/Summary/Keyword: ESS (energy storage system)

Search Result 407, Processing Time 0.028 seconds

C-link Ripple Voltage Compensation Algorithm for Integrated ESS and UPS System with PV Generation (태양광 발전을 갖는 통합 ESS 및 UPS 시스템의 직류 링크 맥동전압 보상 알고리즘)

  • Kim, Min-Gi;Choi, Bong-Yeon;Kang, Jin-Wook;Kim, Jun-Gu;Won, Chung-Yuen
    • Proceedings of the KIPE Conference
    • /
    • 2014.07a
    • /
    • pp.443-444
    • /
    • 2014
  • Using the ESS(Energy Storage System) as a UPS(Uninterruptible Power Supply) is being studied recently. When the system is operating at UPS mode in integrated ESS and UPS system, the grid supplying power is disconnected and power from PV generation and battery are supplying to load. Operating in UPS mode, when PV generation power is diminished by partial or total clouded situation, DC-link voltage fluctuates. The fluctuation of DC-link voltage influences the load and system as sensitive loads may malfunction. This paper suggests the DC-link ripple voltage compensation algorithm in bi-directional converter. The algorithm stabilize the DC-link and load voltage.

  • PDF

A Study on Energy Storage System(ESS) Application for Dynamic Stability Improvement and Generation Constraint Reduction (대규모 발전단지 상시제약 감소를 위한 에너지 저장장치(ESS) 적용에 관한 연구)

  • Lee, Jae-Gul;Jung, Solyung;Choi, Jang-Hum;Kim, Yong-Hak;Yoon, Yong-Beum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.11
    • /
    • pp.1554-1560
    • /
    • 2017
  • Prepare a lose of 765kV transmission route in power system operation condition, there are some Special Protection Scheme(SPS)s in Korean power system. These SPS can make some preselected generators are tripped to avoid generator overspeed. Because of many of the new large power plants are installed to existing power generation sites due to the siting problem, the number of generator tripped by SPS should be increased. But that can be a cause of system frequency change under the Under Frequency Relay(UFR) 1st pickup level 59.0Hz. Therefore generation constraint should be considered until new transmission lines are installed. In this paper, we propose the ESS application for generation constraint mitigation by frequency damping control of ESS. To analysis an effect of ESS application, we use PSS/E dynamic simulation tool, CBEST model and controller model. The proposed ESS application is applied to the empirical Korean power system.

Characteristics of Saturation and Circulating Current Based on Winding and Iron Core Structure of Grid-connected Transformer in Energy Storage System (ESS 연계용 변압기의 결선방식 및 철심구조에 따른 순환전류와 포화특성에 관한 연구)

  • Tae, Dong-Hyun;Lee, Hu-Dong;Kim, Ji-Myung;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.39-48
    • /
    • 2020
  • Since the fire accident of ESS (energy storage system) occurred at Gochang KEPCO Power Testing Center in August 2017, 29 fire cases with significant property losses have occurred in Korea. Although the cause of fire accidents have not been identified precisely, it should be considered battery and PCS (power conditioning system) as well as unbalance issues in the distribution system. In particular, circulating currents in a neutral line of a grid-connected transformer, which can affect a magnetized current, may have a negative effect on the ESS with unintentional core saturation and surge voltages at the secondary side of the transformer. Therefore, this paper proposes the modeling of the distribution system, which was composed of a substation, grid-connected transformer, and customer loads using PSCAD/EMTDC S/W, to analyze the phenomena of circulating current and surge voltages of the transformer with unbalanced currents in the distribution system. This paper presents a countermeasure for a circulating current with the installation of NGR (neutral grounding resistor) in grid-connected transformer. From the simulation results, it is clear that exceeding the circulating current and surge voltage at the secondary side of the transformer can be one of the causes of fire accidents.

프로파일기반 개방형 ESS 시스템 기술

  • Ryu, Yeong-Su;Park, Jae-Hong
    • Information and Communications Magazine
    • /
    • v.33 no.7
    • /
    • pp.40-46
    • /
    • 2016
  • 전 세계적으로 반복되는 전력부족현상과 전력설비 노후화에 따른 공급부족에 대응하기 위하여 ESS(Energy Storage System)가 크게 주목 받고 있다. ESS는 에너지를 저장하였다가 필요시 에너지를 공급하는 장치로, 안정적이고 효율적인 에너지 수급이 가능하다. 세계적으로 ESS에 대한 연구 및 개발이 활발히 이루어지고 있다. 더불어 각 나라별 다양한 ESS 보급 및 지원 정책으로 더욱 탄력을 받고 있다. 하지만 각 제조사별 상이한 ESS 규격으로 사용자 요구에 따른 ESS 구성 및 운영에 어려움을 겪고 있다. 따라서 제조사별로 상이한 부품 간 인터페이스 규격을 수용할 수 있는 개방형 ESS 시스템 기술이 필요하다. 본 고에서는 제조사별로 상이한 부품 간 정보를 수용할 수 있는 프로파일 기반의 개방형 ESS 시스템 기술을 알아보고 개방형 ESS를 위한 프로파일을 소개한다.

Power Allocation Method for Multiple ESS Control Considering SOC Balancing in Microgrids (마이크로그리드에서 SOC균형을 고려한 ESS의 충·방전 전력배분 방법)

  • Lee, Sang-Wook;Park, Juneho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.2
    • /
    • pp.292-299
    • /
    • 2017
  • In this paper, multiple ESS(Energy Storage System) control strategy for microgrids is presented. Installation of ESS becomes mandatory when microgrids are used to supply high quality power to the loads. The one of main functions of the ESS is to maintain power balance. However ESS has limitation of its capacity and instantaneous injecting power. Power allocation method based on SOC(State Of Charge) of each ESS is proposed. P-Q control is employed as the basic control strategy for the distributed ESSs. By using the proposed method, the coefficients in the conventional P-Q control method are modified. The ESSs with higher SOC inject more active power, while those with lower SOC inject less, leading to more balanced SOC levels among the ESSs. The proposed method is demonstrated by simulation using PSCAD/EMTDC.

Economic Assessment of ESS for Peak Load Shaving in the Substation of Urban Railway (도시철도 변전소에 설치한 첨두부하 절감용 ESS의 경제성 분석)

  • Park, Jong-Young;Shin, Seungkwon;Kim, Hyungchul;Jung, Hosung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.12
    • /
    • pp.1752-1758
    • /
    • 2014
  • This paper evaluates economic benefits of ESS (Energy Storage System) for peak load shaving in the substation of urban railway. For this purpose, the method to determine capacities of ESS and PCS (Power Conditioning System) for peak load shaving is proposed. Then the economic benefits of those devices are evaluated using net present value method. The proposed methods are applied to actual measurements of loads in the substation of urban railway. The results show that electric power costs can be reduced and the economic benefits of ESS for peak load shaving mainly depends on the price of battery.

Capacity Determination of ESS for Peak Load Shaving Based on the Actual Measurement of Loads in the Substation of Urban Railway (도시철도 실측 부하에 기반한 첨두부하 절감용 ESS 용량 산정)

  • Park, Jong-Young;Jung, Hosung;Kim, Hyungchul;Shin, Seungkwon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.6
    • /
    • pp.860-865
    • /
    • 2014
  • This paper proposes the method for determination of the capacities of ESS (Energy Storage System) and PCS (Power Conditioning System) for the peak load shaving based on the load data in the substation of urban railway. In addition, this paper analyze the actual measurement of loads in the substation of urban railway. The load of a weekday in the substation of urban railway is high around rush hours in the morning and evening, which is different from that of a normal substation. The required capacities of ESS and PCS become larger as the amount of peak load shaving is higher, and are affected from the patterns of daily load in the substation.

Study on the Optimal Operation of ESS Considering Urban Railway Load Characteristic (도시철도 부하특성을 고려한 ESS의 최적 운영방안 연구)

  • Heo, Jae-Haeng;Shin, Seungkwon;Park, Jong-young;Kim, Hyeongig
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.10
    • /
    • pp.1508-1516
    • /
    • 2015
  • This paper proposes the optimal operation of ESS (Energy Storage System) in the substation of urban railway in an economical point of view. Since the load patterns of urban railway have different characteristics with the general power demand pattern, the characteristics motivate us to develop the optimal operation algorithm for ESS under Korean electricity billing system. We also introduce two different ESS operation strategies for peak load shaving and electricity consumption charge minimization respectively, and formulate each scheme. Historical data from Namgwangju substation are used for economical comparison of the strategies. The results show that the proposed algorithm is the most cost-effective ESS operation scheme among the strategies and reduces around 5 percent of electric charges compared to the charge without ESS operation.

A Study on the Design and Control Characteristics for Optimum Operation of the PV System-based ESS (PV System 기반 ESS의 최적운전을 위한 설계 및 제어 특성에 관한 연구)

  • Cha, Insu;Park, Jongbok;Jung, Gyeonghwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.5
    • /
    • pp.19-30
    • /
    • 2016
  • In this study, realize voltage regulation $220Vac{\pm}10%$ or less, frequency fluctuation $60Hz{\pm}1%$ or less over the independent operation and grid-connected operation technologies for power stabilization relates to the ESS designed and manufactured in conjunction with solar installations and solar to compensate the output reduction due to the polarization of the solar module through the polarization prevention technology for preventing the optical module efficiency is lowered, in conjunction with the BMS inverter efficiency was more than 92%, more than 90% of the charging efficiency to the target. This study was designed in conjunction with the ESS solar power plants, grid-connected operation and independent operation, Peak-Cut, it can stabilize the grid via the Peak-Shifting operation

Development of ESS Based on VRFB-LFPB Hybrid Batteries (VRFB-LFPB 하이브리드 배터리 기반의 ESS 개발에 관한 연구)

  • Cheon, Young Sik;Park, Jin Soo;You, Jinho;Lee, Jin
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.31 no.1
    • /
    • pp.61-67
    • /
    • 2018
  • High-power lithium batteries are suitable for equipment with high power output needs, such as for ESS's initial start-up. However, their management cost is increased by the installation of air-conditioning to minimize the risk of explosion due to internal temperature rise and also by a restriction on the number of charge/discharge cycles. High-capacity flow batteries, on the other hand, have many advantages. They can be used for over 20 years due to their low management costs, resulting from no risk of explosion and a high number of charge/discharge cycles. In this paper, we propose an ESS based on hybrid batteries that uses a lithium iron phosphate battery (LiFePO) at the initial startup and a vanadium redox flow battery (VRFB) from the end of the transient period, with a bi-directional PCS to operate two batteries with different DC voltage levels and using an efficient energy management control algorithm.