• Title/Summary/Keyword: EPC Projects

Search Result 58, Processing Time 0.021 seconds

The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).

A Study on the Feasibility Evaluation of Overseas Wind Power Projects with RETScreen Software (RETScreen를 활용한 풍력발전사업의 투자 적절성 평가 사례 연구)

  • Lee, Ju-Su;Choi, Bong Seok;Lee, Hwa-Su;Jeon, Eui Chan
    • Journal of Climate Change Research
    • /
    • v.4 no.2
    • /
    • pp.105-114
    • /
    • 2013
  • Recently, foreign direct investment of Korea has increased significantly. Foreign direct investment is motivated by various reasons and renewable energy investments in foreign countries can be performed by many causes. Korean companies can enjoy the export of products, related EPC contracts, acquisition of the knowledge of the project management technique, pre-occupying effect of the market and profit itself. Wind power projects have biggest share in the investment amounts among the renewable energy business. So, in this study, one wind farm project was selected and supposed to be invested in China, USA, Germany and UK at the same time and the effect of electricity price, corporate income tax, inflation rate and interest rate of debt were analyzed. The result showed that investing in Germany is most profitable because of the highest electricity price and electricity price and debt interest rate are the most sensitive factors for IRR. This approach would be helpful to make decisions in investing foreign wind power projects.

Strategies for Balancing the Competitiveness between Engineering and Construction in the Korean Infrastructure Industry (국내 토목산업의 설계-시공 균형발전 방안 도출에 관한 연구)

  • Lee, Kang Wook;Han, Seung Heon;Park, Hyung Keun;Chin, Kyung Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.347-354
    • /
    • 2013
  • In the recent global construction environment, EPC contracts that integrate planning, design, procurement, and construction have been widely used for industrial facilities. Similarly, as the importance of the engineering capability such as project management consulting(PMC) and front end engineering design(FEED) has been increased, design-build contracts also have been gradually adopted for infrastructure projects. Whereas, the Korean infrastructure industry has fragmentary features which mainly emphasize on the construction sector. Therefore, this study aims at developing strategies for enhancing the engineering capability and for balancing the competitiveness between engineering and construction sectors in the Korean infrastructure industry. To this end, the authors first carried out market analysis for both global and domestic market. Then, a structured survey and expert in-depth interviews were sequentially performed in order to reflect practitioners' perspectives and needs for institutional strategies. As a result, five strategies drawn from this study are as follows: 1) rearranging the government's roles for supporting the engineering sector; 2) establishing institutional bases being compatible with global standards; 3) fostering value-added workforce for undertaking complex tasks; 4) constructing an consortium between an engineering association and general contractors; and 5) building a nationwide collaborative networks for overseas market expansion.

An Analysis of Forwarding Companies' Efficiency handling Overseas Construction Project Logistics using DEA (DEA분석을 활용한 건설프로젝트 화물포워딩 업체의 효율성 분석)

  • Lee, Jun-Woo;Park, Sung-Hoon;Oh, Jae-Gyun;Yeo, Gi-Tae
    • Journal of Digital Convergence
    • /
    • v.16 no.6
    • /
    • pp.75-84
    • /
    • 2018
  • Although many logistics companies are interested in project logistics, the existing research has been limited to the growth potential of project logistics market and the high barrier and importance of project logistics. This study analyzes using DEA the operational efficiency of forwarding companies registered in major overseas construction EPC companies and performing logistics services for overseas plant construction projects. For efficiency analysis, Super-SBM analysis and Malmquist analysis are used among DEA analysis techniques. As a result of the Super-SBM analysis, DMU 5 ranked first at 1.807. DMU 5 is more efficient than the other large corporations because it has the stable supply of its parent company H and the smallest input and output variables among the large corporations. As a result of Malmquist analysis, TCI, which is a technological development, showed a fluctuation while TECI showed a relatively stable variation. In addition, there is a difference in scale between major companies and small and medium sized companies. So, it is necessary to identify the efficiency improvement strategy for each group and apply it to the practical work.

Overseas Construction Order Forecasting Using Time Series Model (시계열 모형을 이용한 해외건설 수주 전망)

  • Kim, Woon Joong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.107-116
    • /
    • 2018
  • Since 2010, Korea's overseas construction orders have seen dramatic fluctuations. I propose causes and remedies for the industry as a whole. Orders have recorded an annual average of $63.8 billion dollars from 2011 to 2014, reaching its highest at $71.6 billion dollars(2010) which marked the peak of Korea's overseas construction. However, due to a decline in international oil prices, starting in the last half of 2014, Korea's overseas construction orders have followed suit recording $46.1 billion dollar in 2014, $28.2 billion dollars in 2016, and $29.0 billion dollars in 2017. Facing uncertainty in Korea's overseas construction market, caused by continued slow growth of the global economy, Korean EPC contractors are at a critical point in regards to their award-winning capabilities. Together with declining oil prices, the challenges have never been bigger. To mitigate the challenges, I would suggest policy direction as a way to grow and develop the overseas construction industry. Proper counterplans are needed to foster Korea's overseas construction industry. Forecasting total order amount for overseas construction projects is essencial. Analyzing contract award & tender structure and its changing trends in both overseas and world construction markets should also be included. Korea has great potential and global competitiveness. These measures will serve to enhance Korea's overall export strategy in uncertain overseas markets and global economy.

Document Management for Jordan Research and Training Reactor Project by ANSIM (원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리)

  • Park, Kook-Nam;Choi, Min-Ho;Kwon, Yongse
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

Proposal for Developed Procurement and Material management System On Using Previous System Analysis in Plant Engineering (플랜트 구매조달 및 자재관리 시스템 개발 요구사항 분석을 통한 개발 방향 제시)

  • Lee, Seung-Hun;Kim, Sun-Kuk;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.204-209
    • /
    • 2006
  • Despite the recent depression of the construction industry, overseas plant market especially Middle East plant market is booming owing to the high oil price. Since many Middle Eastern countries are placing orders of big scale projects based on the high oil price, Korean EPC contractor are trying to get over the depression through theses plants. Presently, since the plant market is in prosperous condition in general, it is not hard to get overseas orders; however the original licenses that requirehigher technology and high added values are exclusive for advanced engineering companies which great difficulty is predicted for developing countries like us to join the crowd. Therefore, the objective of this study is to propose establishment of material management system on the filed to gain optimized effect of material management in connection with procurement system that all the procurement related personals execute tasks in advanced level by systemizing the task operation within the knowledge and task ability in time for plant construction procurement as a method to strengthening the competitiveness of Korean companies.

  • PDF

A Study on Weight Estimation and Calculation of the Pipe Rack Structures for FPSO EPC Projects (FPSO Topsides Pipe Rack 견적 중량 추산 방법 연구)

  • Lee, Soo-Ho;Ahn, Hyun-Sik;Kim, Han-sung;Heo, Yoon;Bae, Jae-Ryu;Kim, Ki-Su;Ham, Seung-Ho;Lee, Sung-Min;Roh, Myung-Il
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.5
    • /
    • pp.362-370
    • /
    • 2016
  • The weight estimation and calculation of FPSO topsides is first performed at the bidding stage of projects. At this time, it is difficult to estimate and calculate accurately the weight because most of items of FPSO are not apparently defined. Especially, in the case of the pipe rack module, its portion of the total weight and the range of weight variation are large due to special features of piping and electric equipment in the module. Thus, it is very important to estimate and calculate accurately its weight in the task of the weight estimation and calculation of FPSO topsides. In this study, the past data for the weight of the pipe rack module were collected and analyzed, the WBS (Work Breakdown Structure) for the pipe rack module was constructed, and primary variables and secondary variables for developing a weight estimation and calculation model were selected. That is, after analyzing the past data, the volume was selected as the primary variable and the regression analysis was performed based on the variable. Then, several secondary variables were selected and incorporated into a weight estimation and calculation model. At this time, the weight per discipline was assumed from ratios of the total weight. Finally, the weight of the pipe rack module was estimated and calculated by using the developed model. As a result, the deviation from the model was better than that (-20 % ~ 60 %) of other studies about the weight estimation and calculation of FPSO topsides. Thus, the validity and applicability of the weight estimation and calculation of the pipe rack could be checked.