• 제목/요약/키워드: EMTDC/PSCAD

검색결과 690건 처리시간 0.028초

Fault ride-through 요구를 고려한 풍력발전단지 연계선 보호 거리계전 알고리즘 (Distance Relaying Algorithm for Intertie Protection of a Wind Farm Considering the Fault Ride-through Requirement)

  • 강용철;강해권;정태영;김연희;이영귀
    • 전기학회논문지
    • /
    • 제59권6호
    • /
    • pp.1053-1058
    • /
    • 2010
  • A large modern wind farm should satisfy the requirements for a grid and accomplish the optimization of the wind farm system. The wind farm intertie protection system should consider a Fault Ride-Through (FRT) requirement for more reliable protection. The wind farm should keep connected to the grid in the case of a grid fault whilst it should be isolated for an intertie fault. This paper proposes a distance relaying algorithm suitable for wind farm intertie protection considering the FRT requirement. The proposed algorithm estimates the impedance based on a differential equation method because the frequency of the voltage and current deviates the nominal frequency. The algorithm extends the reach of Zone 1 up to 100 % of the length of the intertie to implement the FRT requirement. To discriminate an intertie fault from a grid fault, the algorithm uses a voltage blocking scheme because the magnitude of the voltage at the relaying point for an intertie fault becomes less than that for a grid fault. The performance of the algorithm is verified using a PSCAD/EMTDC simulator under various fault conditions. The algorithm can discriminate successfully the intertie fault from grid fault and thus helps to implement the FRT requirement of a wind farm.

분산전원 연계선로에서 지락 고장시 중성선의 과전류 해석 및 대책 (An Analysis and Countermeasure for the Neutral Line of the Overcurrent Phenomena when Ground Faults of distribution system interconnected with distributed Generations)

  • 신동열;정종만;신창훈;김동명
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.500_502
    • /
    • 2009
  • 한전의 분산전원 연계규정에 따르면 수전고객은 변압기 결선이 ${\triangle}-Yg$ 주로 사용되나 분산전원 연계선로는 변압기 결선이 $Yg-{\triangle}$ 형태로 연계되어 있다. 전원계통 고장시 ${\triangle}-Yg$ 결선 방식은 역조류가 발생되지 않으나, $Yg-{\triangle}$ 결선방식은 중성선을 통해 최대 2000[A]까지 역으로 고장전류를 공급한다[1]. 이때 보호계전기 오동작뿐만 아니라 연계용변압기, 케이블 등 설비보호를 위해서는 고장전류의 크기를 반드시 제한해야 된다. 본 논문은 연계용변압기에 의해서 공급되는 중성선의 과전류 현상을 해석하고, 이론적으로 해석된 결과를 PSCAD/EMTDC로 검증하였으며 고장전류의 크기를 저감하기 위해 NGR 저항 값을 조절하면서 고장전류의 크기를 시뮬레이션 하였다. 분산전원 연계선로에서 영상분 고장전류의 크기를 저감하는 방법으로 연계용 변압기($Yg-{\triangle}$) 1차 측에 중성선에 NGR(Neutral Grounding Reactor; 중성점 접지리액터)을 설치해야 하며 영상임피던스를 조절하는 방법을 제시하였다.

  • PDF

배전계통에 초전도한류기 도입에 따른 보호기기간의 보호협조 분석 (Analysis on the Protective Coordination of between the Protection Devices due to Location of Superconducting Fault Current Limiter in Power Distribution System)

  • 유일경;김진석;김명후;임성훈;문종필;김재철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.6_7
    • /
    • 2009
  • 배전계통에서 수요의 증가와 분산전원의 증가로 대용량 변압기의 적용이 불가피하게 되었다. 그러나, 대용량 변압기로 교체할 경우 기기가 갖는 임피던스가 작아져 배전계통에 고장발생시 고장전류의 크기가 증가되여 기존에 설치된 차단기 및 보호기기의 차단용량 초과로 인해 교체에 따른 경제적 비용 상승이 우려된다. 따라서, 대용량 변압기 적용시 고장전류 증가 문제를 해결하기 위한 방안 중 하나로 초전도한류기를 설치하는 방안을 검토하고 있다. 그러나, 초전도한류기는 고장전류의 크기에 따라 ��치시 임피던스의 크기가 다르게 된다. 이로 인해 고장전류의 값이 달라지며, 기존의 보호기기의 동작이 달라진다. 따라서 본 논문에서는 배전계통에 초전도한류기 도입 위치별 적용 할 경우 기존 보호협조에서 야기될 수 있는 문제점을 실험 및 PSCAD/EMTDC를 이용하여 분석하였다. 그 결과 초전도한류기 도입으로 인해 고장전류 크기가 감소하여 기존의 보호기기의 동작시간이 지연되는 것을 알 수 있었다.

  • PDF

농형유도 풍력발전기의 성능개선을 위한 에너지저장장치의 동작특성 분석 (Operational Analysis of Energy Storage System to Improve Performance of Wind Power System with Induction Generator)

  • 이지헌;심명보;이혜연;한병문;양승철
    • 전기학회논문지
    • /
    • 제58권6호
    • /
    • pp.1138-1145
    • /
    • 2009
  • This paper presents an active and reactive power compensator for the wind power system with squirrel-cage induction generator. The output power of a wind power system changes irregularly according to the variation of wind speed. The developed system is able to continuously compensate the active and reactive power. The 3-phase inverter operates for the compensation of reactive power, while the DC/DC converter with super-capacitors operates for the compensation of active power. The operational feasibility of the proposed model was verified by simulations with PSCAD/EMTDC and the feasibility of hardware implementation was confirmed by experimental works with a scaled hardware model. The proposed compensator can be expected that developed system may be used to compensated the abrupt power variation due to sudden change of wind speed or sudden power-drop by tower effect. It can be also applied for the distributed generation and the Micro-Grid.

전압변동과 부하량을 고려한 저압배전계통의 분산전원 설치용량 분석 (The Study on Permissible Capacity of Distributed Generation Considering Voltage Variation and Load Capacity at the LV Distribution Power System)

  • 문원식;조성민;신희상;이희태;한운기;추동욱;김재철
    • 전기학회논문지P
    • /
    • 제59권1호
    • /
    • pp.100-105
    • /
    • 2010
  • This paper describes a capacity of distributed generation which will be interconnected at low voltage distribution systems. In order to set the capacity of distributed generation, a voltage variation of distribution system is considered. Besides, the capacity of distributed generation is classified according to a capacity of pole transformer and loads. The system constructions in this paper are analyzed by using PSCAD/EMTDC. In the immediate future, it is expected to increase the installation of New and renewable energy systems which are generally interconnected to distribution power systems in the form of distributed generations like photovoltaic system, wind power and fuel cell. So the study of this kind would be needed to limit the capacity of distributed generation.

Fast Envelope Estimation Technique for Monitoring Voltage Fluctuations

  • Marei, Mostafa I.;Shatshat, Ramadan El
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권4호
    • /
    • pp.445-451
    • /
    • 2007
  • Voltage quality problems such as voltage sag, swell, flicker, undervoltage, and overvoltage have been of great concern for both utilities and customers over the last decade. In this paper, a new approach based on the $H_{\infty}$ algorithm to monitor voltage disturbances is presented. The key idea of this approach is to estimate the amplitude of the fundamental component of distorted and noisy voltage waveform instantaneously, and then the information can be extracted from the estimated envelope to identify and classify different voltage related power quality problems. The $H_{\infty}$ algorithm is characterized by a fast tracking, unlike that of existing techniques. The $H_{\infty}$ algorithm outperforms the Kalman Filter (KF) by its fast convergence and robust tracking performance against non-Gaussian noise. The paper investigates the effects of various types of noise on the performance of the $H_{\infty}$ algorithm. Digital simulation results confirm the validity and accuracy of the proposed method. The proposed $H_{\infty}$ algorithm is examined by tracking the flicker produced by a resistance welder simulated in the PSCAD/EMTDC package.

DC Microgrid Operational Method for Enhanced Service Reliability Using DC Bus Signaling

  • Hwang, Pyeong-Ik;Jang, Gilsoo;Pyo, Gi-Chan;Han, Byung-Moon;Moon, Seung-Il;Ahn, Seon-Ju
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권2호
    • /
    • pp.452-464
    • /
    • 2015
  • This paper proposes a DC microgrid operational strategy and control method for improved service reliability. The objective is to supply power to as many non-critical loads as possible, while providing an uninterrupted power supply to critical loads. The DC bus signaling method, in which DC voltage is an information carrier, is employed to implement the operational strategy in a decentralized manner. During grid-connected operation, a grid-tied converter balances the power of the microgrid by controlling the DC voltage. All loads are connected to the microgrid, and operate normally. During islanded operation, distributed generators (DGs), a backup generator, or an energy storage system balances the power. However, some non-critical loads may be disconnected from the microgrid to ensure the uninterrupted power supply to critical loads. For enhanced service reliability, disconnected loads can be automatically reconnected if certain conditions are satisfied. Control rules are proposed for all devices, and detailed microgrid operational modes and transition conditions are then discussed. Additionally, methods to determine control parameter settings are proposed. PSCAD/EMTDC simulation results demonstrate the performance and effectiveness of the proposed operational strategy and control method.

출력변동 저감 및 출력범위 예측 향상을 위한 풍력-연료전지 하이브리드 시스템의 운영방법 (Operation Scheme to Regulate the Active Power Output and to Improve the Forecasting of Output Range in Wind Turbine and Fuel-Cell Hybrid System)

  • 김윤성;문대성;원동준
    • 전기학회논문지
    • /
    • 제58권3호
    • /
    • pp.531-538
    • /
    • 2009
  • The paper deals with an operation scheme to improve the forecasting of output range and to regulate the active power output of the hybrid system consisting of a doubly fed induction generator (DFIG) and a fuel-cell. The power output of the wind turbine fluctuates as the wind speed varies and the slip power between the rotor circuit and power converter varies as the rotor speed change. The power fluctuation of a DFIG makes its operation difficult when a DFIG is connected to grid. A fuel cell system can be individually operated and adjusted output power, hence the wind turbine and fuel cell hybrid system can overcome power fluctuation by using a fuel-cell power control. In this paper, a fuel-cell is performed to regulate the active power output in comparison with the regulated active power output of a DFIG. And it also improves the forecasting of output range. Based on PSCAD/EMTDC tools, a DFIG and a proton exchange membrane fuel cell(PEMFC) is simulated and the dynamics of the output power in hybrid system are investigated.

재폐로차단기간 보호협조 동작시 초전도한류기 적용위치 및 임피던스에 따른 순간저전압 분석 (Analysis on Voltage Sag According to Impedance and Application Location of SFCL with Recloser-Recloser Coordination)

  • 김이관;노신의;김진석;김재철;임성훈;김혜림
    • 전기학회논문지
    • /
    • 제63권2호
    • /
    • pp.230-236
    • /
    • 2014
  • Superconducting fault current limiter (SFCL) has been expected as one of more effective solutions for decreasing fault current instantaneously and various types of SFCLs have been developed to apply into real power system. Recently, the application of the SFCL in a power distribution system has been reported to be contributed to the suppression of the voltage sag as well as the limitation of the fault current. However, the suppressing effect of voltage sag by the SFCL depends on component of its impedance and its application location in a power distribution system considering the recloser-recloser coordination. This paper analyzed the voltage sag caused by recloser-recloser coordination in a power distribution system and the suppression of the voltage sag due to the application location of the SFCL in a power distribution system was discussed through the PSCAD/EMTDC simulation.

Study on Application of Superconducting Fault Current Limiter Considering Risk of Circuit Breaker Short-Circuit Capacity in a Loop Network System

  • Kim, Jin-Seok;Lim, Sung-Hun;Kim, Jae-Chul
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권6호
    • /
    • pp.1789-1794
    • /
    • 2014
  • This paper suggests an application method for a superconducting fault current limiter (SFCL) using an evaluation index to estimate the risk regarding the short-circuit capacity of the circuit breaker (CB). Recently, power distribution systems have become more complex to ensure that supply continuously keeps pace with the growth of demand. However, the mesh or loop network power systems suffer from a problem in which the fault current exceeds the short-circuit capacity of the CBs when a fault occurs. Most case studies on the application of the SFCL have focused on its development and performance in limiting fault current. In this study, an analysis of the application method of an SFCL considering the risk of the CB's short-circuit capacitor was carried out in situations when a fault occurs in a loop network power system, where each line connected with the fault point carries a different current that is above or below the short-circuit capacitor of the CB. A loop network power system using PSCAD/EMTDC was modeled to investigate the risk ratio of the CB and the effect of the SFCL on the reduction of fault current through various case studies. Through the risk evaluations of the simulation results, the estimation of the risk ratio is adequate to apply the SFCL and demonstrate the fault current limiting effect.