• Title/Summary/Keyword: EIA (Environment Impact Assessment)

Search Result 403, Processing Time 0.019 seconds

Study on the Establishing a Guideline for Selecting Major Environmental Factors by the Project Type Criteria in EIA (환경영향평가 대상사업별 중점평가항목의 도출에 관한 연구)

  • Sung, Hyun-Chan;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.1
    • /
    • pp.9-30
    • /
    • 1994
  • Environmental Impact Assessment System, ever since its enactment in Korea fourteen years ago, has been steadily improved by introduction and implementation of new concepts and methodologies which include Environmental Impact Statement(EIS) preparation technique, selection of environmental factors, and the like. However, current guideline requires that every EIS, regardless of the specifics of the project type or characteristics of the site, must evaluate and study for all twenty-two environmental factors as set forth in the regulation. The situation causes many undesirable problems like; lack of site specific evaluation in most EISs, over-sized EIS drafts, consuming too much time and costs for EIS preparation, and so on. The objectives of this study are: - To establish a set of criteria to classify the types of the projects in terms of features of the project content and the characteristics of the site area. - To establish a guideline for selecting major environmental factors of the project type criteria, and - To provide basic materials for the preparation of complets draft EIS of the Amendment of Environmental Impact Assessment Act.

  • PDF

Review of Environmental Impact Assessment Re-consulting System - A Comparative Analysis of Korea and Foreign Countries - (환경영향평가 변경협의 및 재협의 제도 고찰 - 국내외 제도 운용현황을 중심으로 -)

  • Kim, Jin-Oh;Joo, Yong-Joon
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.5
    • /
    • pp.328-338
    • /
    • 2021
  • EIA consultation is a final decision-making process that enables a variety of stakeholders to participate in and to share important information about the expected environmental impacts caused by development projects. However, this process is often undermined through re-consultation processes by significant changes in the proposed plans. EIA re-consultation is a necessary process when an approved plan needs to be changed for a variety of importantreasons including the changes of land use, delay of construction, and surrounding environments. EIA re-consultation is also important to resolve conflicts among stakeholders and to respond flexibly to unexpected changes in surrounding environment. This study aims to analyze the operation status and the problems of current institutional systems of EIA re-consultation, and to draw implications by reviewing institutional systems of other countries such as U.S. EU, Scotland, and Japan. On the basis of the previous analysis, we propose recommendations to improve the existing EIA re-consultation process. We expect this study helps understand operation status and problems of EIA re-consultation, and provides meaningful implications to improve the existing institutional systems and practice of re-consultation.

Environmental Assessment and Environment-Friendly Development in Mountainous Area in Constructing Photovoltaic Complex (태양광단지의 산지입지에 따른 환경성평가 및 환경친화적 개발 방안)

  • Ahn, Sewoong;Joo, Hyun Soo;Lee, Hi Sun
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.2
    • /
    • pp.141-150
    • /
    • 2011
  • The construction of photovoltaic complex in mountainous area is quickly increasing recently so that the environment assessment in constructing photovoltain complex in mountainous area was performed by comparison of $CO_{2{\cdot}}$ reduction and forest damage. The case studies for environmental value assessment, which construct photovoltaic complex in mountainous area, show that the losses of around 5.1billion won arise during 15 years. The government's official target for spreading photovoltaic energy until year 2030 can be satisfied when considering other alternative sites, improvement of technology and the alternative sites of an idle space of a building or a disused site, etc, except an undeveloped mountainous area. The construction of photovoltaic complex in mountainous area can cause the great damage to the environment, especially undeveloped mountainous area such as Baekdudaegan, and this defeat its own purpose of using photovoltaic energy. Therefore, the spread of photovoltaic complex through the additional damage of forest should be sublated.

Environmental Impact Assessment for Development Projects Considering Carbon Sink and Sequestration(II) - Focused on a Housing Redevelopment Project - (탄소흡수원을 고려한 개발사업 환경영향평가 방안(II) - 주택 재개발 사업을 중심으로 -)

  • Hwang, Sang Il;Park, Sun Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.1
    • /
    • pp.79-87
    • /
    • 2011
  • In this study, we investigated the effect of carbon sequestration and sink on the environmental impact assessment of a housing redevelopment project. Through the case study, we found that the amount of carbon sequestration and sink increased with the increase of the area of park and green space and, furthermore, the amount of carbon emission decreased slightly with implementation of district heating and renewable energy. Therefore, it is necessary for its land use plan to be established to minimize the amount of net carbon emission, taking account of both the amount of present carbon emission and the amount of the future carbon sink, sequestration, and emission.

Environmental Impact Assessment for Development Projects Considering Carbon Sink and Sequestration(III) - Focused on a Bogeumjari Housing Project - (탄소흡수원을 고려한 개발사업 환경영향평가 방안(III) - 보금자리주택 사업을 중심으로 -)

  • Hwang, Sang Il;Park, Sun Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.2
    • /
    • pp.235-248
    • /
    • 2011
  • In this study, we investigated the effect of carbon sequestration and sink on the environmental impact assessment of a Bogeumjari Housing Project. Through the case study, we found that, if the project is implemented, the amount of carbon stock tends to decrease greatly while as the amount of the carbon emission tends to greatly increase. Furthermore, we found that the future land use should be planned in detail in order to maintain the soil carbon stock prior to development. Also, enlargement of undeveloped forest land area would be more efficient than that of newly planted area in terms of carbon sequestration.

The Analysis of GOCI CDOM for Observation of Ocean Environment Change (해양환경변화관측을 위한 GOCI CDOM 자료 분석)

  • Jeong, Jong-Chul
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.389-395
    • /
    • 2013
  • Geostationary Ocean Color Imager(GOCI), the World's first spaceborne ocean color observation satellite operated in geostationary orbit, was successfully launched on May 2010. The main missions of GOCI is the coastal environment monitoring of GOCI in order to meet the necessity of long-term climate change monitoring and research. The GOCI have higher spatial resolution than MODIS, $500m{\times}500m$, and 8 spectral ocean color channels. GOCI have a capability for observation on the coastal environment change, GOCI perform the observation with 8 times a day. In this paper, we presented the more improved results for observation on the coastal environment change than MODIS ocean color sensor and detected the spatial difference of CDOM for monitoring coastal environment change.

Climate Data Qualification for Water Quality Impact Assessment (수질영향평가의 신뢰수준 향상을 위한 기상자료의 검정)

  • Lee, Khil-Ha;Cho, Hongyeon
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.5
    • /
    • pp.601-613
    • /
    • 2011
  • This study is focused on a climate data integrity to improve water quality assessment due to the social development projects. The study is in an attempt to calculate both extreme ranges of weather data measurements and partly provide means to assess qualification of data which fall within the extremes at the 23 meteorological weather stations. Generally speaking, maximum temperature, minimum temperature, relative humidity, dew point temperature are in the range of reasonable accuracy. However, there found some outliers of the brightness sunshine hours in Cheonan station. Also some years in Gwangju, Seoul, Wonju, Busan, and Jeju never reach to their upper limit and perhaps the calibration of the equipment is doubtful. The users need to take cautions in using the brightness sunshine hour data in preparation of water resources planning and management by estimating evapotranspiration and river discharge, and/or growth rate of the algae (phytoplankton).

Derivation of Data Demand through Analysis of Agreed Terms and Conditions on Environmental Impact Assessment - Focusing on the Water Environment - (환경영향평가 협의 내용 분석을 통한 데이터 수요 도출방안 - 수환경 분야를 중심으로 -)

  • Jinhoo Hwang;Yoonji Kim;Seong Woo Jeon;Yuyoung Choi;Hyun Chan Sung
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.1
    • /
    • pp.29-40
    • /
    • 2023
  • The need for improvement is raised due to limitations with environmental impact assessment, and the importance for data-based environmental impact assessment is increasing. In this study, data demand was derived by analyzing Agreed Terms and Conditions in the Water Environment field (Water Quality, Hydraulic & Hydrologic Conditions, and Marine Environment) of environmental impact assessment. Agreed Terms and Conditions on environmental impact assessment in the water environment field were classified and categorized by environmental impact assessment stage (addition to status survey, impact prediction and evaluation, establishment of reduction measures, post-environmental impact survey), and data demand for each type of consultation opinion was linked. As a result of the categorization of Agreed Terms and Conditions, it was classified into 18 types in the water quality, 15 types in the hydraulic & hydrologic conditions, and 17 types in the marine environment. As a result of linking data demand, the total number of data demand was 236 in the water quality, 98 in the hydraulic & hydrologic conditions, and 73 in the marine environment. The highest number of Agreed Terms and Conditions and data demands were found in the water quality for the evaluation item and establishment of reduction measures, specifically establishment of non-point source pollution reduction measures, for the stage. The numbers were judged to be linked to the relative importance of the items and the primary purpose of environmental impact assessment. The derivation of data demand through the analysis of Agreed Terms and Conditions in the environmental impact assessment can contribute to the advancement of the preparation of environmental impact assessment reports and is expected to increase data utilization by various decision-makers by establishing a systematic database.

Temporal-spatial Analysis of Environmental Impact and Locational Characteristics for Industrial Complex Projectsin South Korea (산업단지 개발사업의 환경 영향 및 시공간적 입지 특성변화 분석)

  • Choi, Hyun-Jin;Park, Ji Hyeon;Park, Jong-Yoon
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.5
    • /
    • pp.317-327
    • /
    • 2021
  • Industrial complexes have have been played an important role in various aspects such as national industrial development, economic growth. However, it is a cluster of manufacturing facilities which has a great impact on the surrounding area and the overall domestic environment during the operation of the facility. In this study, environmental influences and siting characteristics of industrial complexes were investigated based on the environmental impact assessment report from 2009 to 2019. The development tendency of industrial complexes is continuous decline, and major development areas are Gyeonggi, Gyeongsang and Chungcheong areas. We also confirmed that the average area of defenestration due to industrial complex is on the decline. Furthermore, the residential area and educational facilities, and the exposed population affected by industrial complex is constantly increased.

A Study on the Environmental Impact Assessment for the Unconventional Gas Development (비전통 가스 개발의 국내외 환경영향평가 현황)

  • Cho, Hanna;Park, Joo-Yang
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.3
    • /
    • pp.227-235
    • /
    • 2014
  • Interest has been growing worldwide in unconventional natural gas that has become an increasingly important source of energy in the world. Unconventional gas development, including shale gas, generally involves a larger environmental impact, compared to conventional gas development, due to its intensity and scale of the operation. There are a growing number of studies on identifying and minimizing the environmental impacts of unconventional gas development. This study aims to examines the current environmental policies and regulatory systems related to the unconventional gas development. The study shows that few environmental regulation exists concerning unconventional gas development, even in the USA where unconventional gas development is most actively pursued. Regulations, however, are being developed based on studies currently underway on health and environmental risks of unconventional gas development and on guidelines designed to reduce the risks. In a world where environmental regulations are ever strengthening, review the environmental regulatory systems and guidelines about unconventional gas need to be established for Korean firms to understand environmental impacts of unconventional gas development they invest or take part in, enabling them to manage and operate gas activities in a way that minimizes environmental damages.