• Title/Summary/Keyword: ECOST

Search Result 1, Processing Time 0.014 seconds

A Study on Distribution System Assessment and Interruption Cost Calculation for the Industry Load by the Analytic Approach Method (해석적방법론에 의한 산업용 수용가의 공급지장비 산정 및 배전계통에의 적용)

  • Kim, Yong-Ha;Woo, Sung-Min;Baek, Byum-Min;Sin, Hyung-Chul;Park, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.4
    • /
    • pp.47-55
    • /
    • 2009
  • This paper estimates interruption cost assessment for industrial load. For executing In this way first, we research customer interruption cost(CIC) for industrial load about 1,026 unit. And to assess industrial load in D/L calculate sector customer damage function(SCDF) using CIC. Second, we compute distribution reliability through annual failure rate, repair time and so on, and then, Third, distribution system that calculate VBDRA for industrial load per alternative assesses interruption cost.