• Title/Summary/Keyword: EA 현행화

Search Result 5, Processing Time 0.024 seconds

A Case Study of Improving EA Updating by Connecting PMS (PMS 연계를 통한 EA 현행화 개선 사례 연구: 국토해양부 정보화프로젝트 관리시스템을 중심으로)

  • Kang, Jae-Hwa;Kim, Seung-Kwan
    • Journal of Information Technology and Architecture
    • /
    • v.9 no.4
    • /
    • pp.423-432
    • /
    • 2012
  • EA (Enterprise Architecture) is an SI (System Integration) approach, i.e., a comprehensive plan for SI, which shows the elements of SI and the relationships among them. Since EA can be utilized in every stages of SI, the more large-scaled and complicated SI projects are, the more important EA is. Although many central government agencies and wide local governments implemented EA, the current level of EA utilization is still low. One of the reasons is the low level of EA updating. Some reasons of the low level of EA updating are the low frequency of EA updating, and the shortage of workers, as well. In order to improve the frequency of EA updating and alleviate the workloads of SI officers, MLTM (Ministry of land, transport, and maritime affairs) standardized the processes and documents for SI projects, and implemented PMS (Project Management System) that can support the unifying management of SI projects and be connected with EA system. We expect that EA information are updated efficiently, the level of EA utilization is boosted, and the qualities of SI products are improved, by the implementation of the PMS connected with EA system.

ITA/EA Modification Methodology and Success Story (ITA/EA 현행화 방법론 및 성공적 수행 사례)

  • Lee, Mun-Gyu;Jang, Byung-Hyun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.349-355
    • /
    • 2008
  • 2006년 07월 정보시스템의 효율적 도입 및 운용을 지원하기 위해 ITA/EA 구축이 법제화 된 이후 ITA/EA 구축 기관의 수가 급격히 증가하고 있는 추세이다. 행정안전부의 자료에 따르면 2007년 10월 기준으로 약 36개 기관이 ITA/EA를 도입하였으며, 향후 총 49개 중앙행정기관, 총 16개 광역지방자치단체가 ITA/EA 도입계획을 제출하였다. 향후 5년간($2007{\sim}2011$) 약 1900억 원에 이르는 소요예산이 계획되어 있다. 그러나 활발한 구축 열기에 비해 기 구축된 아키텍처 정보의 관리 및 활용에 대해서는 다소 미흡한 부분이 있다. 행정안전부가 발표한 ITA/EA 기 구축 기관의 ITA 성숙도 측정결과 총 4개의 성숙도 측정 영역(투입, 산출, 관리, 활용) 중 "관리", "활용" 두개 영역의 성숙도가 가장 떨어지는 사실이 이를 반증하는 결과이다. 이러한 이유로 아키텍처 정보의 관리 및 활용에 대한 이슈는 최근 ITA/EA 추진하는 조직의 최대 관심사가 되고 있다. 넥스젠엔씨지는 이러한 현행의 ITA/EA 추진의 이슈를 해결하기 위한 방안으로 기 구축된 아키텍처 정보의 현행화를 위한 ITA/EA 현행화 프레임워크(NAMF)와 구체적인 현행화 절차를 개발하였다. 또한 최근 이를 적용하여 대규모 아키텍처 정보에 대한 현행화를 완료하였다. 넥스젠엔씨지의 아키텍처 현행화 방법론과 적용 사례는 현재 ITA/EA 도입을 계획하거나, 기 도입한 조직의 아키텍처 정보 현행화 이슈 해결하는데 이바지 할 것으로 기대된다.

  • PDF

A Case Study on EA Actualizing and Structure improvement Based on Organizational Innovation in Public Agencies (공공부문 조직변화에 따른 EA 현행화 및 구조개선 사례 연구)

  • Shim, Jang-Sup;Mun, Byoung-Ju;Kim, Seon-Bong;Jo, Eun-Hee;Lim, Chong-Sok
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2013.11a
    • /
    • pp.5-8
    • /
    • 2013
  • 전 산업분야의 변화 사이클이 짧은 격변의 시대에 공공부문의 IT는 "정보시스템의 효율적 도입 및 운영 등에 관한 법률"에 따라 구축되고 운영되고 있으며, 정부의 국정기조 아래 각 기관 조직의 전략실행 수단으로 활용되고 있으며 조직목표 달성에 기여하고자 EA를 구축하고 있다. 또한 조직의 통 폐합 등 변화에 따라 기존에 운영되고 있는 시스템 및 서비스들을 효율적으로 관리하기 위해서는 작은 예산을 통하여 적기에 빠르게 모형이 표준화되고 EA 지원시스템에 목표 아키텍처로 등록되며 현행화 되는 구조개선 작업이 필요하다. 본 연구에서는 새 정부 출범시마다 변화되는 주변 환경에 따라 해당조직의 통 폐합 과정에서 추진한 지난 정부에서의 사례 제시를 통하여, 민간과 다른 특성을 가지고 프로세스의 변화에 능동적으로 대응이 어려우며 현업의 참여가 소극적인 특성을 가진 공공기관에 적합한 EA 현행화와 구조개선 사례를 제공하고 이것을 바탕으로 다른 유사 공공기관들의 업무에 활용이 가능하도록 제안 한다.

A Study on the Improvement of Administrative Information Data Set Operation of Private Universities (사립대학 행정정보 데이터세트 운영 개선 방안)

  • Kim, Hyunjung;Bae, Sungjung
    • The Korean Journal of Archival Studies
    • /
    • no.74
    • /
    • pp.187-222
    • /
    • 2022
  • The aim of this study was to analyze the operation status of administrative information datasets of private universities and present improvement plans. For the system of private universities, the generation, correction, and deletion of functions, development types, and data were analyzed politically. As a result of the analysis, it has one or more administrative information systems and uses the academic management system in common, and the system is often developed on its own through the university's infrastructure, and data is deleted by the person in charge, but the regulations are not clear. To solve these problems, it was proposed to revise the EA portal to properly investigate the current status of the administrative information system of private universities, manage records centering on systems without data correction, and revise internal regulations to conduct education.

Efficiency Improvement of Environmental Assessment Procedure through Introduction of Screening (스크리닝 도입을 통한 환경평가 절차 효율화 방안)

  • Shin, Kyung-Hee;Cho, Kong-Jang;Yim, Hyo-Sook
    • Journal of Environmental Policy
    • /
    • v.10 no.1
    • /
    • pp.129-150
    • /
    • 2011
  • This paper proposes an improvement to differentiate assessment procedure for projects in consideration of their environmental impact as a means to improve efficiency in environmental impact assessment ("EIA") procedure. The targets of analysis were limited to lower impact projects. The current EA system in Korea has already attempted to introduce separate proceedings for certain projects.Tangible results from these efforts, however, have been limited. Other countries have adopted a "screening" system to determine whether EIA is applicable to a particular project, and if so, what procedure will be used therein. Therefore, this study suggests the screening as the process wherein need for EIA is determined with respect to projects which have undergone Prior Environmental Review System(PERS) and which appear to have comparatively negligible environmental impact. In this case, EIA can be omitted and the developer can then draft a mitigation plan instead. This study found that exempting certain projects deemed as having low environmental impact can considerably shorten the duration required for both environmental assessment and consultation, thereby improving efficiency. Other expected effects from the adoption of this screening include reduction in delays in project execution due to environmental assessments and reduced red tape through the provision of increased autonomy to developers and the approving authorities.

  • PDF