• Title/Summary/Keyword: E-J power

Search Result 823, Processing Time 0.029 seconds

A Study on the Power System Restoration Simulator (전력계통 고장복구 교육 시스템에 관한 연구)

  • Lee H.J.;Park S.M.;Lee K.S.;Lee J.G.;Min S.W.;Han C.K.;Park J.K.;Moon Y.H.
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.7
    • /
    • pp.323-327
    • /
    • 2005
  • This paper presents an operator training simulator for power system restoration against massive black-out. The system is designed especially focused on the generality and convenient setting up for initial condition of simulation. The former is accomplished by using power flow calculation methodology, and PSS/E data is used to define the initial situation. The proposed simulator consists of three major components - the power flow(PF) module, data conversion(COW) module and GU subsystem. PF module calculates power flow, and then checks overvoltage of buses and overflow of lines. COW module composes an Y-Bus array and a data base at each restoration action. The initial Y-Bus array is constructed from PSS/E data. The user friendly GUI subsystem is developed including graphic editor and built-in operation manual. As a result, the maximum processing time for one step operation is 15 seconds, which is adequate for training purpose. Comparison with PSS/E simulation proves the accuracy and reliability of the training system.

Low Cost Class-I Converter for Power Conversion Operation of Piezoelectric Transformer (전력용 압전 변압기 구동을 위한 저가형 클래스-E 컨버터)

  • Kim T. I.;Park J. H.;Lee S. M.;Choi S. J.;Cho B. H.
    • Proceedings of the KIPE Conference
    • /
    • 2004.07b
    • /
    • pp.696-699
    • /
    • 2004
  • This paper proposes the Low Cost Class-E Converter with Power Conversion Operation of Piezoelectric Transformer. The Power Piezoelectric transformer capacity used in the proposed circuit is 15W and the electric equivalent circuit is presented. Class E type converter has some merits such as small component count, small size, and low cost. The topology has also ZVS conditions for main switch, thus in efficiency aspect, it is also competitive for commercial feasibility. The analysis and design guideline are suggested and also they are verified by experimental results.

  • PDF

The development of TGOV5 model representing a steam turbine and boiler for implementation into EMTDC (EMTDC용 1차 에너지계 모델(TGOV5) 개발)

  • Hur, J.;Kim, D.J.;Yoon, J.Y.;Moon, Y.H.;Lee, J.;Yoon, Y.B.
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.282-285
    • /
    • 2001
  • In general, the PSS/E program based on RMS mathematical models is used for analyzing the steady state and transient stability phenomena of full-scale large power system. Whereas, the EMTDC program unlike PSS/E, studies the specific reduced small-scale power systems as a basis of instantaneous value mathematical models and used to analyze the Electro-Magnetic transient characteristics. The PSS/E provides various control models such as exciter, governor, PSS models and TGOV5 model but there are few control models in EMTDC. In this paper, we developed EMTDC model for TGOV5 of a steam turbine and boiler which represents governor action, main, reheat and low-pressure effects, including boiler effects. The EMTDC model is developed by examining PSS/E control block and using User Define Model(UDM) in addition to default.lib provided by EMTDC. We verify the correctness of developed TGOV5 model with PSS/E and EMTDC simulation results using Governor Step(GSTEP) method.

  • PDF

The development of Governor models for implementation into EMTDC and the verification of Governor models using GSTEP (EMTDC용 조속기 모델 개발 및 GSTEP을 이용한 검증)

  • Hur, J.;Kim, D.J.;Yoon, J.Y.;Moon, Y.H.;Lee, J.;Yoon, Y.B.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.71-74
    • /
    • 2001
  • In general, the PSS/E program based on RMS mathematical models is used for analyzing the steady state and transient stability phenomena of full-scale large power system. Whereas, the EMTDC program unlike PSS/E, studies the specific reduced small-scale power systems as a basis of instantaneous value mathematical models and used to analyze the Electro-Magnetic transient characteristics. The PSS/E provides various control models such as exciter, governor and PSS models, But there are few control models in EMTDC. In this paper, we developed EMTDC models for governor which have been applied in KEPCO system. The EMTDC models are developed by examining PSS/E control block and using User Define Model in addition to default.lib provided by EMTDC. we verify the correctness of developed governor models with PSS/E and EMTDC simulation results using Governor Step(GSTEP) method.

  • PDF

Analysis of Back-to-Back HVDC system featured for Asynchronous Connection (비동기 전력계통 연계를 위한 Back-To-Back 직류설비의 운전특성 해석)

  • Kwak, J.S.;Wook, W.J.;Koh, B.E.;Kim, C.K.;Shim, E.B.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1289-1291
    • /
    • 2000
  • The operation of Back-To-Back HVDC system for asynchronous connection is described. It can exchange electric power up to 300 MW between separately operated two rower systems, making the interaction on each system minimum. The analysis is done under three different AC transmission lines interconnected to BTB HVDC.

  • PDF

Analysis of HVDC Converter Commutation Process (HVDC 전력변환기의 Commutation 동작분석)

  • Kwak, J.S.;Wook, W.J.;Koh, B.E.;Kim, C.K.;Shim, E.B.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1286-1288
    • /
    • 2000
  • Commutation failure can be considered as the severest abnormal operation of thyristor HVDC converter. During the failure, power conversion from DC to AC is stopped until the AC voltage get recovered. The process of thyristor converter is subscribed at normal and abnormal state, respectively. The detection and the protection for Cheju HVDC are explained by computer simulation results.

  • PDF

A Study on Fatigue Crack Growth Behavior and R-Curve Characteristics of Gas Piping Material (가스배관재의 피로균열진전거동과 파괴저항특성곡선에 관한 연구)

  • Son, J.D.;Lim, M.B.
    • Journal of Power System Engineering
    • /
    • v.11 no.1
    • /
    • pp.127-133
    • /
    • 2007
  • SG-365 steel is an important material and used for manufacturing a pressure vessel which the gas piping. In this investigation, the elastic plastic fracture toughness of this material is evaluated by the unloading compliance method according to the ASTM E813-97 and E1152-97 method on the smooth and side groove 1CT specimens. The effect of smooth and side groove is studied on the elastic plastic fracture toughness. The side grooved specimen is very useful in estimation of the $J_{IC}$. It is much easier than the smooth specimen to the onset of the ductile tearing by the R curve method. Besides, it improves the accuracy of toughness values, decreases a phenomenon of the tunneling and shear lip by the side groove.

  • PDF

Modeling of Hanlim's gas turbine generator & qualitative analysis of PSS operation (한림가스터빈 발전기/제어계의 모델링 및 PSS 동작의 정성적 분석)

  • Choi, K.S.;Moon, Y.H.;Kim, D.J.;Choo, J.B.;Lyu, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 1996.11a
    • /
    • pp.95-98
    • /
    • 1996
  • Response speed of generator/control system kas increased with the aid of the development of power electronics. Even though it is desirable to enhance response speed for the control system(AVR/Gov) of generator itself, in case a certain generator/control system with high response excitation system is connected with bulk power system, terminal voltage and active power of some generators can oscillate with adjoining generators or near area when even a little of disturbance take place. PSS(Power System Stabilizer) is used to damp rotor swing by adding the supplementary signal in phase with speed. As the stable AVR response is very important before PSS is installed, modeling and analysis of generator/control system was performed. Next we have analysed PSS response of Hanlim's gas turbine by transmission line open/close test.

  • PDF