• Title/Summary/Keyword: Dynamic Schedule

Search Result 181, Processing Time 0.026 seconds

Design of Radio Resource Management System for WiBro MBS (WiBro 에서 MBS 서비스 제공을 위 한 무선자원관리 시스템 설계)

  • Tcha, Yong-Joo;Yum, Suk-Joon;Oh, Yun-Seok;Lee, Seong-Choon
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.256-259
    • /
    • 2007
  • Multicast and Broadcast Service (MBS) provides flexible and efficient transmission of the same information to multiple users using shared radio resources on WiBro network. The advantage of this service is to achieve the most efficient use of radio and network resources as well as to lessen sender's processing load when sending the same information to multiple users. Though radio resources are saved since a multicast or broadcast transport connection is associated with a service flow, it is hard to change MBS service channel dynamically. In this paper, we propose a Radio Resource Management System (RRMS) for supporting dynamic scheduling of MBS service channels. Results show that our proposed scheme using Radio Resource Allocation Table (RRAT) can efficiently support MBS services by providing dynamic schedule for MBS service channels.

  • PDF

A Study of linking methodology of Direct Load Control and Unit Commitment Considering System Spinning Reserve Characteristics (계통운전예비력특성을 감안한 직접부하제어와 기동정지계획의 연계방법에 관한 연구)

  • Lee, Buhm
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.7 no.4
    • /
    • pp.826-832
    • /
    • 2003
  • This paper presents a new linking methodology of direct load control(DLC) and unit commitment(UC) considering system spinning reserve characteristics. To consider system spinning reserve characteristics, we formulate new constraints. And to link DLC and UC, we employed 3-Dimensional dynamic programming which has DLC state, UC state, and stage. As a result, economical DLC and UC schedule of the power system is possible. This method is applied to the test system, and the usefulness of the method is verified.

Development of Linking Methodology of Direct Load Control and System Economic Operation (직접부하제어와 계통경제운용의 연계기법 개발)

  • Lee, Buhm
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2003.05a
    • /
    • pp.594-597
    • /
    • 2003
  • To link direct load control and economic operation considering system spinning reserve characteristics, this paper presents a new metholodogy. By formulating new constraints, considering system spinning reserve characteristics is possible. And by employing 3-D dynamic programming, linking direct load control and economic operation is possible. As a result, economical DLC and operation schedule of the power system is possible. The usefulness of the method is verified by applying to the test system.

  • PDF

A Study on the Decision of an Optimal Maintenance Period for Ship's Machinery Items using the Cumulative Hazard Rate Function for Weibull Distribution (Weibull형 고장분포를 갖는 선박용 부품의 최적 보전시기의 결정수법에 관한 연구)

  • 유희한
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.24 no.2
    • /
    • pp.90-96
    • /
    • 2000
  • The technology of preventive maintenance and corrective maintenance is widely applied to ships in order to maintain the good voyageable condition. One of the most important fields of marine engineering is to seek the maximum availability and to solve the stochastic maintenance problem such that the cost for corrective maintenance is minimized. Accordingly, for the purpose of making the most suitable maintenance schedule which minimizes the expected cost function, this paper suggests the method to grasp the failure characteristics by the ship's maintenance data that are collected from the past. And, suggests the method to estimate the optimal maintenance interval by using the dynamic programming and the cumulative hazard rate function attained from the maintenance data.

  • PDF

Fabrication Scheduling of Products with Common and Unique Components at a Single Facility (공통 및 고유부품으로 구성되는 제품의 부품공급을 위한 단일설비 일정계획)

  • 윤상흠
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.28 no.4
    • /
    • pp.105-114
    • /
    • 2003
  • This paper considers a single facility scheduling problem for the fabrication of components supporting the subsequent assembly into products. Each product consists of two types of components, one is common to all products and the other is unique to itself. The unique components are processed individually and the common components are processed in batches, and a distinct setup is incurred for the production of a batch of common components. Under the so-called “batch availability” environment, we propose an efficient dynamic programming(DP) procedure for the optimal sequencing and batching schedule with minimum total completion times of products in the situation that each product is said to be complete if both common and unique components of the product are finished. Computational results show that the proposed DB procedure is more efficient than the previous work which has considered the same problem as this paper.

Research of Direct Load Control Considering Unit Commitment (기동정지계획을 고려한 직접부하제어에 관한 연구)

  • Lee, Buhm;Kim, Y.H.;Kim, H.J.;Moon, H.K.;Jung, H.S.;Lee, Y.K.;Choi, S.K.
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.220-222
    • /
    • 2001
  • This paper describes the optimizing method of direct load control (DLC) considering unit commitment which is based on dynamic programming. To consider the unit commitment on DLC, 3-Dimensional dynamic programming as a new unit commitment method is developed. And, this method is applied to DLC. As a result, optimization of operating schedule with DLC is possible. This method is applied to the test system, and usefulness of the method is verified.

  • PDF

Effective Task Scheduling and Dynamic Resource Optimization based on Heuristic Algorithms in Cloud Computing Environment

  • NZanywayingoma, Frederic;Yang, Yang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.12
    • /
    • pp.5780-5802
    • /
    • 2017
  • Cloud computing system consists of distributed resources in a dynamic and decentralized environment. Therefore, using cloud computing resources efficiently and getting the maximum profits are still challenging problems to the cloud service providers and cloud service users. It is important to provide the efficient scheduling. To schedule cloud resources, numerous heuristic algorithms such as Particle Swarm Optimization (PSO), Genetic Algorithm (GA), Ant Colony Optimization (ACO), Cuckoo Search (CS) algorithms have been adopted. The paper proposes a Modified Particle Swarm Optimization (MPSO) algorithm to solve the above mentioned issues. We first formulate an optimization problem and propose a Modified PSO optimization technique. The performance of MPSO was evaluated against PSO, and GA. Our experimental results show that the proposed MPSO minimizes the task execution time, and maximizes the resource utilization rate.

A Study on Dynamic Scheduling in Flexible Manufacturing System Environment (유연생산시스템 환경 하에서의 동적 일정계획에 관한 연구)

  • Lee Sang-Wan;Kim Hae-Sic;Cho Sung-Youl
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.27 no.2
    • /
    • pp.17-23
    • /
    • 2004
  • Changes in manufacturing system are those that occur during production and cause the systems to behave unpredictably. So scheduling problem in this dynamic Industrial environments is very complex. The main concept of this dissertation is to continuously monitor a manufacturing system status(Rate of Prior Job, Rate of Large Job, Rate of Shortest due date Job, Job Interval Time) and detect or predict a change so that scheduling system will react by modifying production schedule(dispaching rule) to lessen the effects of this change.

Endurance test procedure and validation of Multipurpose tactical vehicle (다목적 전술차량의 주행내구도 시험 절차 및 검증)

  • Jeong, Eui-Bong;Kang, Dong-Suk;Choi, Ji-Ho;Kim, Han-Shang;Choi, Man-Sick
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.256-261
    • /
    • 2014
  • Endurance test procedures of multipurpose tactical vehicle is constructed by comparing the Korea defence standard and TOP-2-2-506. The plan was to make the best reflect the operational environment and the actual production purposes. Endurance test of multipurpose tactical vehicle more stringent than the existing other military vehicles validation procedures. But the test plan, it is possible to reduce the cost and schedule of long verification that occurs because of the Endurance test. Through a comparison of the dynamic characteristic analysis, change of test center was to ensure the reliability and validity.

  • PDF

A Study on Economic Analyse for Direct Load Control considering Energy Payback (Energy Payback을 고려한 직접부하제어의 경제성 분석)

  • Kim, H.J.;Kim, I.S.;Kim, Y.H.;Lee, Buhm;Choi, S.K.;Moon, J.H.;Lee, H.N.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.311-314
    • /
    • 2001
  • This paper describes the optimizing method of direct load control (DLC) considering unit commitment which is based on dynamic programming. To solve DLC problem considering unit commitment, 3-dimensional dynamic programming as a new unit commitment method is developed. And, energy payback is concerned for DLC. As a result, optimization of operating schedule with DLC is possible. This method is applied to the test system, and usefulness of the method is verified.

  • PDF