• Title/Summary/Keyword: Duration Curve

Search Result 445, Processing Time 0.028 seconds

A Novel Ocular Delivery System for Phenylephrine Hydrochloride

  • Durrani, A.M.;Jamshaid, M.;Kellaway, I.W.
    • Archives of Pharmacal Research
    • /
    • v.19 no.5
    • /
    • pp.386-389
    • /
    • 1996
  • The in vivo behaviour of phenylephrine hydrochloride in different vehicles like gels of Carbopol $907^circledR$, Carbopol $934P^circledR$ and latex system of cellulose acetate hydrogen phthalate(CAHP) was evaluated by measuring the reduction in intraocular pressure and the mydriatic activity. The parameters that haave been utilised to assess the performance of the formulations were the area under the curve (AUC), the maximum mydriasis $(I_{max})$, ethe time of maximum response $(T_{max})$ and the duration of activity (D). The influence of viscosity and mucoadhesion on the bioavailability parameters has also been investigated. Carbopol 934P and CAHP formulations showed prolonged duration of action and greater AUC compared to Carbopol 907 aqueous solution(P<0.05).

  • PDF

Water Pollution Source Tracing Using FDC and Correlation Analysis in Geumho River Basin (FDC 및 상관관계 분석을 이용한 금호강 유역에서의 오염원추적)

  • Park, Kyung Ok;Lee, Chang Hee;Cha, Il Geun
    • Journal of Wetlands Research
    • /
    • v.18 no.3
    • /
    • pp.232-243
    • /
    • 2016
  • In order to establish the watershed water quality management strategy of Total Maximum Daily Load(TMDL), it is necessary to understand the relationship between water quality component impacts, and to identify the impacts on downstream target point of watershed water quality management of waste treatment plant(WTP) discharge and upstream/tributary loads. In this study, we determined the impacts between the water quality contaminants, and traced water pollution sources using monitoring data of ministry of environment in tributaries and main stream and WTP monitoring data. Test area is set to Geumho river basin which has characteristics of urban and rural area and composes of GeumhoA, GeumhoB, GeumhoC watershed units in TMDL. The clustering with five grades of discharge data and the correlation analysis were performed through the FDC(Flow duration curve) analysis, which more clearly identified the points and water contaminants deteriorating target water quality of downstream point. This can be used as a tool for tracing pollutants with FDC analysis, and will help us establish the watershed water quality management strategy for TMDL target point in watershed more effectively.

Study on the Application of Spatial-analysis of Pollutants and Load Duration Curve for Efficient Implementation of TMDLs system (오염원 공간분석 및 오염부하지속곡선을 통한 맞춤형 수질오염총량제 추진방안 연구)

  • Park, Baekyung;Ryu, Jichul;Na, EunHye;Seo, Jiyeon;Kim, Yongseok
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.12
    • /
    • pp.655-663
    • /
    • 2017
  • It is difficult to manage hotspot area and to establish the reduction plan considering with spatial-distribution on Korea TMDLs (Total Maximun Daily Loads) system. To solve this problems, methods of Load Duration Curve (LDC) using long-term flow and water quality data, and spatial-analysis were applied on present TMDLs. Jinwi A watershed which is enforced TMDLs plan were selected to study area. Results of application of suggested methods in this study to Jinwi watershed, Hwangguji tributary was selected to hotspot area and Jinwi tributary was exclued. Also, middle area of Hwangguji tributary was needed a reduction plan for the protection of non-point source pollution. In downstream area, livestock manure should be managed additionally. The new methods suggested in this study were useful to increase healthiness for total watershed.

Analysis of Load Duration Curve Using Long Time Flow Measurement Data of Kyeongancheon (장기간 유량측정 자료를 이용한 경안천의 부하지속곡선 특성)

  • Noh, Changwan;Kwon, Phil-Sang;Jung, Woo-Seok;Lee, Myung-Gu;Cho, Yong-Chul;Yu, Soonju
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.1
    • /
    • pp.35-48
    • /
    • 2019
  • Long term flow measurement and water quality analysis data need to determine the target and allowable load for each basin in Total Water Pollution Load Management System (TWPLMS). The Load Duration Curve (LDC) is analyzed the relationship between flow data and water quality, and evaluates the pollutant load characterization by flow conditions. LDC of Kyeongancheon is created by the Flow Duration Curve (FDC) that was analyzed 8-day interval measured flow data from 2006 to 2015 and numeric water quality target in Kyeongancheon. As a result of this study, it is necessary to manage the point source pollutant because the numeric water quality target is not satisfied in the low flows. Also the numeric water quality target has been exceed for four months from March to June of the year and continuous and systematic watershed management is required to satisfy the numeric water quality target.

Drought impact on water quality environment through linkage analysis with meteorological data in Gamcheon mid-basin (기상자료와의 연계분석을 통한 수질환경에 대한 가뭄영향 연구 - 감천중권역을 대상으로)

  • Jo, Bugeon;Lee, Sangung;Kim, Young Do;Lee, Joo-Heon
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.11
    • /
    • pp.823-835
    • /
    • 2023
  • Recently, due to the increase in abnormal climate, rainfall intensity is increasing and drought periods are continuing. These environmental changes lead to prolonged drought conditions and difficulties in real-time recognition. In general, drought can be judged by the amount of precipitation and the number of days without rainfall. In determining the impact of drought, it is divided into meteorological drought, agricultural drought, and hydrological drought and evaluation is made using the drought index, but environmental drought evaluation is insufficient. The river water quality managed through the total water pollution cap system is vulnerable to the effects of such drought. In this study, we aim to determine the drought impact on river water quality and quantify the impact of prolonged drought on water quality. The impact of rain-free days and accumulated precipitation on river water quality was quantitatively evaluated. The Load Duration Curve (LDC), which is used to evaluate the water quality of rivers, was used to evaluate water pollution occurring at specific times. It has been observed that when the number of consecutive rainless days exceeds 14 days, the target water quality in the mid-basin is exceeded in over 60% of cases. The cumulative rainfall is set at 28 days as the criteria, with an annual average rainfall of 3%, which is 32.1 mm or less. It has been noted that changes in water quality in rivers occur when there are 14 or more rainless days and the cumulative rainfall over 28 days is 32.1 mm or less in the Gamcheon Mid-basin. Based on the results of this study, it aims to quantify the drought impact and contribute to the development of a drought water quality index for future environmental droughts.

Assessment of the Non-point Source Pollution Control Strategies for Water Quality Improvement in the Haeban Stream of West Nakdong River Watershed (서낙동강 유역 해반천의 수질 개선을 위한 비점오염관리대책 효과 분석)

  • Yejin Kim
    • Journal of Wetlands Research
    • /
    • v.26 no.1
    • /
    • pp.1-9
    • /
    • 2024
  • In this study, a HSPF model was developed to simulate runoff and water quality in the Haebancheon watershed, which has a high land area ratio and population density among the West Nakdong River watersheds. Various non-point source pollution control strategies were applied, and the reduction in pollutant loads and the exceedance rate of water quality standards were analyzed. The scenarios included basic road cleaning for reducing pollutant loads, runoff reduction measures considering extensive low-impact development techniques, and inflow reduction measures to mitigate non-point source pollution entering the river. In the first step, practical conditions such as the number of vehicles for road cleaning in Kimhae City were considered, while for the second and third steps, it was assumed that 50% of the applicable land use area was used to be applicable for the LID techniques. As a result of applying all three measures, it was analyzed that the BOD pollutant load could be reduced by 58.28%, T-N by 58.49%, and T-P by 51.56%. Furthermore, the 60th percentile of water quality measurements accumulated over 5 years was set as the target water quality, and a flow-duration curve was constructed. The exceedance rate of the flow-duration curve before and after applying non-point source pollution reduction measures was analyzed. As a result, for BOD, the exceedance rate decreased from 41.57% before applying the measures to 16.32% after, showing a 25.25% reduction in the exceedance rate. For T-N, the exceedance rate decreased significantly from 40.31% before the measures to 22.84% after, and for T-P, it decreased significantly from 62.43% to 27.22%.

Establishment of Target Water Quality for TOC of Total Water Load Management System (오염총량관리제도의 TOC 목표수질 설정 방안)

  • Kim, Yong Sam;Lee, Eun Jeong
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.6
    • /
    • pp.520-538
    • /
    • 2019
  • In this study, it was proposed that a method of setting the target water quality for TOC using the watershed model and the load duration curves to manage non-biodegradable organics in the total water load management system. To simulate runoff and water quality of the watershed, the HSPF model is used which is appropriate for urban and rural areas. Additionally, the load duration curve is used to reflect the variable water quality correlated with various river flow rates in preparing the TMDL plans in the U.S. First, the model was constructed by inputting the loads calculated from the pollutant sources in 2015. After the calibration and verification process, the water quality by flow conditions was analyzed from the BOD and TOC simulation results. When the BOD achieved the target water quality by inputting the target year loads for 2020, the median and average values of TOC were proposed for the target water quality. The provisional method of TOC target water quality for the management of non-biodegradable organics, which is one of the challenges of the total water load management system, was considered. In the future, it is expected to be used as basic data for the conversion of BOD into TOC in the total water load management system.

Estimation of Design Flood Runoff in Ungaged Forest Watershed to Reduce Flood Damage within the National Park (국립공원내 홍수피해 저감을 위한 미계측 산림지역의 설계홍수량 추정)

  • Kim, Sang-Min;Im, Sang-Jun;Lee, Sang-Ho;Kim, Hyung-Ho;Ma, Ho-Seop;Jeong, Won-Ok
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.5
    • /
    • pp.107-113
    • /
    • 2009
  • The purpose of this study is to estimate the design flood runoff for ungaged forest watershed to reduce the flood damage in national park. Daewonsa watershed in Jirisan National Park was selected as study watershed, of which characteristic factors were obtained from GIS data. Flood runoff was simulated using SCS unit hydrograph module in HEC-HMS model. SCS Curve Number (CN) was calculated from forest type area weighted average method. Huff's time distribution of second-quartile storm of the Sancheong weather station, which is nearest from study watershed, was used for design flood runoff estimation. Critical storm duration for the study watershed was 3 hrs. Based on the critical duration, the peak runoff for each sub-watershed were simulated. It is recommended to monitor the long-term flow data for major stream stations in National Park for a better reliable peak runoff simulation results.

Feasibility Study on the Construction of Small Hydro-Power Plants in Gumi Sewage Treatment Plant Discharge Point (구미하수처리장 방류구에서의 소수력발전 설치 및 운영에 관한 연구)

  • Nah, Dong-Hun;Lee, Seung-Hwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.2
    • /
    • pp.173-181
    • /
    • 2010
  • This study was conducted to investigate the possible installation of small hydro-power plant at the discharge point of Gumi sewage treatment plant (STP) using treated wastewater. Sufficient amount of water to transfer to electric power and the selection of proper location are two essential elements for the construction of small hydro-power facility. Preliminary analysis based on site visit and existing data in Gumi STP were made. Capacity of the small hydro-power plants and exact location were determined by geomorphological condition and flow duration characteristics. Flow duration characteristics and its duration curve were identified using monthly rainfall data in Gumi STP. Relevant facts of small hydro-power system in other STP were referred to adopt to Gumi STP situation. Flowrate of treated effluents and effective head between flow chamber and the location of hydraulic turbine in Gumi STP are found to be $3.70m^3$/sec and 3.5m respectively. Electric generation rate based on this feasibility study was estimated to be 86.3kW/h. Yearly electric generation rate was expected to be 932.4MMh. Proposed small hydro-power plant construction in Gumi STP is to be reasonable.

Instream Flow Estimation for Gap-Stream Watershed Considering Ecosystem, Landscape, Water-friendly Environment and Water Quality (생태.경관.친수.수질을 고려한 갑천 유역의 하천유지유량 산정)

  • Kim, Tai-Cheol;Lee, Duk-Joo;Moon, Jong-Pil;Lee, Jae-Myun;Gu, Hui-Jin
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.6
    • /
    • pp.11-20
    • /
    • 2007
  • In order to make the way to determine the instream flow more practically, we have investigated many case studies and reviewed reports and papers. To validate instream flow level suggested by the case studies, DAWAST and HEC-RAS model were applied to the Gap-stream watershed in Daejeon city. Flow-duration analysis was performed both with the stream flow data gauged in the Indong, Boksu, and Hoeduck stations, and with the stream flow data estimated by the DAWAST model and the specific discharge method. Instream flow was determined among the flow-duration analysis, DAWAST, HEC-RAS model and mass balance approach. It was satisfied with various factors such as target water quality, water depth for eco-system and resorts, water surface width, flow velocity for landscape in dry season. The study suggested that the mean low flow could be replaced into the instream flow for the preliminary study because the instream flow considering ecosystem, landscape, water-friendly environment and water quality was generally close to the mean low flow.