• Title/Summary/Keyword: Drought flow

Search Result 168, Processing Time 0.026 seconds

Analysis of Hydraulic Characteristics by Sediment Protection Weir on Natural River Estuary (자연하도 하구부의 방사보에 의한 수리학적특성 해석)

  • Ahn, Seung-Seop;Choi, Yun-Young
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.4 no.1
    • /
    • pp.51-60
    • /
    • 2001
  • This study examines the effects of removal of the sediment protection weir at Taehwa river mouth on hydraulic and around river environment considering the fact that the effects of the sediment protection weir which is installed to protect water level drop of Ulsan harbor caused by sediments according to flood in Taehwa river, Dong-chun, and so forth may add water quality contamination by flow stagnance in normal and drought period and accumulation of pollutants. The result is as follows. First, it is estimated from the examination of variation characteristics water depth and level for Taehwa river before and after removal of the sediment protection weir that about 0.01m of water depth down according to removal of the sediment protection weir occurs when low flow runs between the sediment protection weir which is located about 2.3km away from the estuary and Samho-gyo which is about 9.0km away from the sediment protection weir, and about 0.01~0.56m(directly upstream point of the sediment protection weir 0.56m, Myongchon-gyo 0.14m, Ulsan-gyo 0.03m, and Taehwa-gyo 0.02m) downs when design flood flows between the sediment protection weir and the upstream of Taehwa-gyo which is 10km away from the sediment protection weir. Therefore, it is thought that variation of hydraulic characteristics of water depth down and so on according to removal of the sediment protection weir is slight because water depth variation is only about 1cm between directly upstream point of the sediment protection weir and Samho-gyo. Next, it is estimated from the examination of variation characteristics of flow velocity for Taehwa river before and after removal of the sediment protection weir that about 0.0lm/s of flow velocity increase occurs between the directly upstream point of the sediment protection weir which is about 2.4km away from the estuary and the directly upstream point of Samho-gyo when low flow runs, and about 0.01~0.44m/s increases between the sediment protection weir and Samho-gyo when design flood flows. Therefore, riverbed erosion by the increased flow velocity is concerned but it is thought that the concern about riverbed erosion is not great because the mean velocity is about 0.07~1.36m/s when low flow runs, and about 1.02~2.41m/s when design flood flows for the sector which experiences the flow velocity variation.

  • PDF

Development and evaluation of ANFIS-based conditional dam inflow prediction method using flow regime (ANFIS 기반의 유황별 조건부 댐 유입량 예측기법 개발 및 평가)

  • Moon, Geon-Ho;Kim, Seon-Ho;Bae, Deg-Hyo
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.7
    • /
    • pp.607-616
    • /
    • 2018
  • Flow regime-based ANFIS Dam Inflow Prediction (FADIP) model is developed and compared with ANFIS Dam Inflow Prediction (ADIP) model in this study. The selected study area is the Chungju and Soyang multi-purpose dam watersheds in South Korea. The dam inflow, precipitation and monthly weather forecast information are used as input variables of the models. The training and validation periods of the models are 1987~2010 for Chungju and 1984~2010 for Soyang dam watershed. The testing periods for both watersheds are 2011~2016. The results of training and validation indicate that FADIP has better training ability than ADIP for predicting dam inflow in normal and low flow regimes. In the result of testing, ADIP shows low predictability of dam inflow in the low flow regime due to the model tuning on all flow regime together. However, FADIP demonstrates the improved accuracy over the entire period compared to ADIP, especially during the normal and low flow seasons. It is concluded that FADIP is valuable for the prediction of dam inflow in the case of drought years, and useful for water supply management of the multi-purpose dam.

Computation of composite suitability index for fish and macroinvertebrate species in the Gongneung River (공릉천에서의 어류와 저서무척추 동물에 대한 복합 서식처 적합도 지수의 계산)

  • Kim, Seung Ki;Choi, Sung-Uk
    • Ecology and Resilient Infrastructure
    • /
    • v.4 no.2
    • /
    • pp.105-114
    • /
    • 2017
  • This study performed physical habitat simulation for fish and macroinvertebrate species in the Gongneung River. Target fishes were selected as Rhinogobius brunneus and Zacco platypus. Target macroinvertebrate species were selected as Hydropsyche kozhantschikovi and Chironomidae. Habitat suitability curves were constructed by using monitoring data from the monitoring project which is called "the survey and evaluation of aquatic ecosystem health". For calculation of CSI, weighted mean method was used. For macroinvertebrates species, the weighting factor derived from analytic hierarchy method was considered. River2D, which is capable to simulate flow in two-dimensional space, was selected for flow computation. Composite suitability index was simulated for target fish and macroinvertebrate species for discharge of drought, low, normal, and averaged-wet flow. Simulation results show that Chironomidae and Hydropsyche kozhantschikovi prefer the pool and riffle habitat, respectively. Rhinogobius brunneus and Zacco platypus show high suitability in riffle habitat.

Comparison of Water Supply Reliability by Dam Operation Methods (댐 운영방식에 따른 이수안전도의 비교)

  • Choi, Si Jung;Lee, Dong-Ryul;Moon, Jang Won
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.6
    • /
    • pp.523-536
    • /
    • 2014
  • A water supply reliability is mainly influenced by water demand, reservoir storage, and inflow change caused from drought. The water supply reliability can vary depending on the method of dam operation. In Korea, the deficit-supply method which complements water deficit as water shortage occurs in downstream areas has been used for the national water resources master plan using K-WEAP, but the prime flow method, an alternative approach, would show different results of water supply reliability in comparison to the deficit-supply method. The objective of this research is to compare and analyze differences in water supply reliability according to dam operation methods. These results can be used to re-evaluate water supply reliability of dam in a circumstance considering steady dam release for instreamflow in downstream and hydroelectric power generation.

Analysis of changes in cross section and flow rate due to vegetation establishment in Naeseong stream (내성천 하도 내 식생활착에 의한 단면 및 유량변화 분석)

  • Lee, Tae Hee;Kim, Su Hong
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.3
    • /
    • pp.203-215
    • /
    • 2021
  • In the present study, hydrologic data and topographical data from 2010 to 2019 were collected from three gauging stations placed in the watershed of Naeseong stream to determine changes and rates of changes in rainfall, water level & mean velocity, and water level & discharge, together with changes in rates of erosion and deposition at cross-sections of the river. Besides, effects of regulated and non-regulated rivers according to the presence of artificial regulation of flow rate of the river via artificial structure located at Seo stream (Yeongju si (Wolhogyo) station), the tributary free from construction of dams, were compared and analyzed. Results of analyses conducted in the present study revealed vegetational establishment and landforming due to increasing area of vegetational sandbar evolved in the flood plain (intermediate- or high- water level) by the drought sustained from 2013 to 2015. Continuous erosion of river bed was appeared because of narrowed flow area with low water level and increased velocity and tractive force on river bed.

A Probabilistic Determination of the Active Storage Capacity of A Reservoir Using the Monthly Streamflows Generated by Stochastic Models (월유하량(月流下量)의 추계학적(推計學的) 모의발생자료(模擬發生資料)를 사용(使用)한 저수지(貯水池) 활용(活用) 저수용량(貯水容量)의 확률론적(確率論的) 결정(決定))

  • Yoon, Yong Nam;Yoon, Kang Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.6 no.3
    • /
    • pp.63-74
    • /
    • 1986
  • A methodology for the probabilistic determination of active storage capacity of an impounding reservoir is proposed with due considerations to the durations and return periods of the low flow series at the reservoir site. For more reliable probabilistic analysis the best-fit stochastic generation model of Monte Carlo type was first selected for the generation of monthly flow series, the models tested being the Month Carlo Model based on the month-by-month flow series (Monte Carlo-A Type), Monte Carlo Model based on the standardized sequential monthly flow series (Monte Carlo-B Type), and the Thomas-Fiering Model. Monte Carlo-B Model was final1y selected and synthetic monthly flows of 200 years at Hong Cheon dam site were generated. With so generated 200 years' monthly flows partial duration series of low flows were developed for various durations. Each low flow series was further processed by a nonsequential mass analysis for specified draft rates. This mass analysis furnished the storage-draft-recurrence interval relationship which gives the reservoir storage requirement for a specified water demand from the reservoir during a drought of given return period. Illustrations are given on the application of these results in analyzing the water supply capacity of a particlar reservoir, existing or proposed.

  • PDF

System Development for the Estimation of Pollutant Loads on Reservoir (저수지 유역의 오염부하 산정 시스템 개발)

  • Sim, Sun-Bo;Lee, Yo-Sang;Go, Deok-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.1
    • /
    • pp.35-44
    • /
    • 1998
  • An integrated system of GIS and water quality model was suggested including the pollutant loads from the watershed. The developed system consists of two parts. First part is the GIS module. The geographic information system of the study area was built to provide the information on landuse and several surface factors concerning the overland flow processes of water and pollutants. Second part is the modeling modules which include storm event pollutant load model(SEPLM)., non-storm event pollutant load model(NSPLM), and river water quality simulation model(RWQSM). Models can calculate the pollutant load from the study area. The databases and models are linked through the interface modules resided in the overall system, which incorporate the graphical display modules and the operating scheme for the optimal use of the system. The developed system was applied to the Chungju multi-purpose reservoir to estimate the pollutant load during the four selected rainfall events between 1991 and 1993,. based upon monthly basis and seasonal basis in drought flow, low flow, normal flow and wet flow.

  • PDF

Analyzing the Effect of Groundwater Dam Construction Using Groundwater Modeling (지하수 모델링을 통한 지하수댐 건설 효과 분석)

  • Kim, Ji-Wook;Lim, Kyung-Nam;Park, Hyun-Jin;Rhee, Bo-Kyoung
    • Journal of Soil and Groundwater Environment
    • /
    • v.18 no.3
    • /
    • pp.11-22
    • /
    • 2013
  • SEAWAT, a linked modeling program of Visual MODFLOW was used to analyze the change in groundwater levels and salinity related groundwater dam construction in Cheongsan island, Wando-Gun, Jeollanam-Do. The steady-state model results show the groundwater flow and salinity distribution of the studied area. The groundwater flows from north-west and south-east highlands into the river, located in the middle part of the basin, and is eventually discharged to the ocean. Part of the sea water infiltrates into the river; and through the estuary's alluvium aquifer, the sea water intrusion takes place spreading to about 830 m from the ocean. The transient model results show that after the groundwater dam construction, groundwater levels will rise to a maximum of 2.0 m upstream, and the groundwater storage will increase 21,000 after 10 years. Meanwhile 31% of the total area affected by sea water intrusion will decrease. To conclude, the groundwater dam is a very useful method for a secure water resource in preparation for drought and water shortages in the island regions.

A Study on Relationship between Streamflow Variability and Baseflow Contribution in Nakdong River Basin (낙동강 수계에서의 하천유량 변동성과 기저유출 기여도의 관계 분석)

  • Han, Jeong Ho;Lim, Kyoung Jae;Jung, Younghun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.1
    • /
    • pp.27-38
    • /
    • 2016
  • More severe and frequent flood and drought have increased the attentions on the river management. In particular, baseflow is an important element among many streamflow characteristics because streamflow is mainly consisted of direct runoff and baseflow. In this regard, this study attempted to analyze the relationship between streamflow variability and baseflow contributions on Nakdong river basin. For this, two Streamflow Variability Indices (SVI) were used: Coefficient of Variation (CV) and Coefficient of Flow Regime (CFR). Furthermore, baselow separation was individually conducted by three methods (PART, WHAT and BFLOW), and based on this, Baseflow Index (BFI) was calculated. Also, we used the daily streamflow data retrieved from 27 gauge stations in Nakdong river basin for baseflow separation. The results showed that BFI calculated by three models ranges from 0.14 to 0.90 for 27 gauge stations. For SVI, BFI has much higher correlation with CV than with CFR. Also, the inversely proportional relationship between BFI and CV showed that higher baseflow contribution, less streamflow variability.

Comparison of Water Infiltration and Retention Capacity in a Forest Soil of Different Surface Depression Patterns (지면 굴곡에 따른 산림 토양의 물 침투와 저류능력 비교)

  • Cho, Yoori;Kim, Jongho;Lee, Dowon
    • Journal of Korean Society of Forest Science
    • /
    • v.107 no.1
    • /
    • pp.108-111
    • /
    • 2018
  • Increasing soil surface roughness can be effective in enhancing infiltration of rainfall and depression storage capacity of forest soil and reducing surface run-off. In this study, a forest slope with hemispherical depressions shows greater infiltration of water, whereas depression storage capacity is higher in soil with depressions perpendicular to a water flow pathway. Soil pitting or forming surface depressions can be used as a countermeasure after forest fires and a practical way to reduce drought stress of forest soil.