In environmental impact assessment, noise impact assessment usually consists of three stages surveying the existing noise levels by measurements, predicting noise levels induced by construction works and predicting noise levels after the completion of project. When predicting noise level in urban area, this method does not consider acoustic phenomena like multi reflection, diffraction and absorption due to complex topographic configuration of building and terrains. For the purpose, a noise mapping tool is utilized to produce a series of noise maps, which are those for the present, for the works of construction and for the future. For accurate noise mapping, acoustical and topographic information is essential. Standard sound power levels and directivities of various construction equipments are required and scheduling of construction processes and locations of the equipments should be provided. In the case of exceeding legal limit, mitigation measures are applied to satisfy the legal limits and subsequent noise map is obtained and checked.
Recently, the scale of the construction work has been increased due to the revitalization of the construction industries. therefore, the demolition work in downtown areas is increased too. Amelioration districts are deteriorating rapidly since it followed the policy which allowed a large number of constructions in a very short period of time. therefore, the quantity of construction wastes and the designated wastes such as asbestos are increased. This study was classifying and analyzing the constructions in amelioration districts to estimate quantity of the designated wastes and the unit of the designated wastes. According to the results of this research, the average annual designated wastes was increased up to 2.59% in comparison with 2,779,334 ton in 2000, there came out 3,151,653 ton of designated wastes in 2005. For the appropriate disposal of increasing designated wastes, it is necessary to study exact estimation of the quantity of wastes.
Underground structures are built into concrete like a architecture and public works. Concrete has watertightness as such, But buildings are leaking from the cracks. Recently, construction method do a lot of close construction in the downtown area. So architects are using the method for the outer layer of a two-layer wall to save spaces. They have been using Top-down method and waterproof agent method and others to outer layer of a two-layer wall method. But, There are many leakage in underground structure from lack on requirements performance of materials. Therefore, I hope to test the outside Waterproof Method of Ground using Wire-mesh and Non-hardening Viscosity Waterproof. In addition to, I wish to apply as outside waterproof method for the section for the outer layer of a two-layer wall in underground structure.
In environmental Impact assessment, noise impact assessment usually consists of three stages-surveying the existing noise levels by measurements, predicting noise levels induced by construction works and predicting noise levels after the completion of a project. The distance-attenuation relation of a point source, which has been used to predict the noise level due to its simplicity does not consider complex acoustic phenomena like multi-reflection, -diffraction and -absorption due to complex topographic configuration of buildings and terrains. For the consideration of such physical complexities. a noise mapping tool is adopted to produce a series of noise maps, which are those for the present, tot the works of construction and for the future. For accurate noise mapping, acoustical and topographic Information is used. Standard sound power levels and directivities of various construction equipments are need and scheduling of construction processes and locations of the equipments should be provided. In the case of exceeding legal limit, mitigation measures are applied to satisfy the legal limits and subsequent noise map is obtained and checked.
This research is conducted on temporary street furniture, which is one of the significant factors that comprise the street landscape in modem cities. The primary purpose of this research is to present the guidance on direction of planning by examining the design and installation types of construction and screen fences usually established at construction sites for buildings, roads, parks and etc. The results are as follows: 1. The construction and screen fences at construction sites of urban areas used to be a mere tentative facility to prevent noise and safety accidents but have now incremented their roles to serve not only as a functional but also as an aesthetic element with a city view and harmonization with other elements taken into consideration. In particular, it is noticeable that, based on its unique feature of tentativeness, its role has developed to serve as street furniture that adds variability to the modem city. 2. There are two different types of screen fences: blackout type and transparent type. The transparent screen turns out to be used a lot at the construction site of building a skyscraper or differentiated building in downtown city area or in places where there are buildings of similar types and shapes located along the street in the vicinity of the construction site. 3. The actual cases of adopting the tentative construction and screen fences all at the same time as a single unit have been found in historically and culturally significant architectures with the screen design used to demonstrate the view after completion of construction or the characteristics of the architecture.
도심지 지가가 높아짐에 따라 건축물의 공간 활용도에 대한 기대치가 높아지게 되었고, 건축물은 더 크고, 더 깊고, 더 높게 지어지는 방향으로 나아가고 있다. 이에 따라, 공사의 첫 단계이자 전체 건물의 기초가 되는 지하 공사는 그 중요성이 날로 더해가고 있다. 최소한의 비용으로 최단기간에 터파기 공사를 완료해야 하는 도심지 공사의 특성상 공사 관계자들은 지하 공사를 계획, 설계, 시공, 설계하는 과정에서 심혈을 기울이고 있다. 그럼에도 불구하고 지하 공사 전번에 걸쳐 있는 불확실성과 위험 요소 때문에 공사 실패 사례가 발생하고 있다. 더욱이 이러한 사고가 어느 정도의 경제적 피해를 끼쳤는지에 대한 보고나 연구없이 사고 사례만 알려지기 때문에 지하 공사의 위험성에 대한 경각심이 부족한 것이 우리나라 건축의 현실이다. 이런 사고를 타산지석으로 삼아 터파기 공사 공법을 선정하고 지하 공사를 이행하는데 있어서 하나의 지침이 되기를 바라면서 지하 공사 실패 사례가 과연 어느 정도의 경제적 피해를 발생시키는지를 개산견적 기법을 도입하여 추정해 보았다.
As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.
There are several ways to solve parking problem in the downtown One of them is to manage parking efficiently, that is, to raise use-efficiency of parking place and to help drivers to select easily. When we manage the parking place m the block efficiently, It can prevent disproportion that some parking space is over capacity and the other parking one is under. It causes not only the disproportion of economic efficiency but also the congestion of local road. The precondition to manage parking efficiently is to analyse the parking characteristics. In this study we found out the characteristics of parking vehicles by analyzing the turnover per parking mesh and occupancy rate And we build up total D/B by collecting every information about parking space. We developed the Parking Management System by using GIS with D/B and digital map. The efficient Parking Management System is for convenience of drivers and efficient usage of parking space. And this system is also the basic study to be developed as the total Parking Management System by upgrading every information.
최근, 새로운 터널공법으로 국내외에서 널리 적용되고 있는 NATM공법은 터널굴착과정에서 지각의 거동을 현장계측을 통하여 관측, 그 결과를 설계 및 시공에 반영하여, 터널의 안정성과 시공의 합리성을 추구하는 것이 그 특징이라 할 수 있다. 서울시 지하철의 경우, NATM공법은 주로 도심지 난공사구간에서 채택되었다. 따라서 안전한 터널 시공을 위한 현장계측은 NATM터널 전구간에 대하여 총범위하게 실액되었다. 본 연구에서는 지반업반, 터널의 기하학적 형상 및 굴착공법 등을 고려할 때 특징적인 조건을 가지고 있는 5개의 대표적인 계측구간에 대한 측정결과를 분석하여 지반의 거동을 파락하고자 하였다. 터널좌 굴착에 있어서 중요한 의미를 가지는 지반의 거동으로는 지표 및 터널 주변 구조물의 안정성과 관련된 지표심하와, 시공의 안정문제에 관련된 터널의 변형 등으로서, 본고에서는 주로 지표심하 및 천단심하의 거동특성을 여러 가지 영향요인의 관점에서 고찰하였다.
최근 기존 도로의 확장에 대한 요구와 논의가 많아지고 있어 도심지와 산악지에 위치한 기존 터널의 확장에 대한 관심 또한 증가하고 있다. 터널 확장 계획 시에는 기존 터널을 최대한 활용한 시공방법과 안정성의 확보 방안에 대한 연구 및 고찰은 필수적이다. 본 연구에서는 시공 중인 2차로 도로터널의 3차로 확장 설계 내용을 이용하여 터널 확장시 주요 고려사항인 선형 계획, 터널 확장 방안, 굴착 방법, 보강계획 등을 제안하였다. 본 연구를 통하여 향후 터널 확장 설계시 보다 나은 기술적인 접근을 위한 방향제시 및 기술 향상을 도모할 수 있을 것으로 판단된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.