• Title/Summary/Keyword: District Heating Pipe

Search Result 56, Processing Time 0.044 seconds

A Study on the Application Method of Flexible Pipe for District Heating in Korea (지역난방용 Flexible Pipe 활용방안 연구)

  • Lee, Ki-Seb;Park, Nam-Soo
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.637-642
    • /
    • 2008
  • The concept of district heating involves centralised heat production where heat is distributed to consumer via a piping network. The objective of this work is to identify the Flexible Pipe from an economy, execution, maintenance point of view. Flexible Pipe has in some countries, especially in Europe, been used for many years in district heating. In spite of years of experience, there still exist doubts about the possibilities of using flexible pipes in district heating applications, mostly because of no experiences in domestic market. The advantage of flexible pipe systems is their flexibility. This holds not only for the inner pipe but also for the total pipe system including insulation and jacket. Even for the largest diameter the minimum radius of curvature is given to 1.5m. The most important difference between flexible pipe systems and preinsulated steel pipes is their simple and quick assembly. Such information could provide a basis for making reasonable hypotheses about consumer preferences, to foam a basis for making future marketing more effective.

  • PDF

Development of Three-Way Proportional Control Valve and Performance Study (3방 비례제어 조절밸브 개발 및 성능 연구)

  • Lee, Jonghwa;Jung, Taeksu;Cho, Chongdu;Kim, Jooyong
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.5
    • /
    • pp.218-223
    • /
    • 2014
  • Korea District heating corp. recently give an attention to combine the district heating and supply pipes as a two pipe system that are in the present system separated with room heating and warm water supply pipe, and the two pipe system is commonly applied for heating service in European countries. In the new two pipe system, only one heat source is supplied to a house and partitioned into room heating and warm water supply by household substation. So the effective distribution of supplied heat source in accordance to user intention is very important. This paper presents the development and performance test of three-way proportional control valve for a combined heat source system in district heating. The proposed valve is controlled to partition heat source into two different directions : hot water distributor for space heating and household substation for warm water supply in response to the pressure drops of tap water caused by the user. The performance investigation is shown within 3% of error compared to the theoretical model of the three-way proportional valve and its controllability is verified.

Failure Analysis of an Inlet Pipe of a Governor Valve in a Steam Turbine of a District Heating System (지역난방 증기 터빈 내 조속기 밸브 Inlet pipe 파손 원인 분석)

  • Chae, Hobyung;Kim, Woo Cheol;Kim, Heesan;Kim, Jung-Gu;Lee, Soo Yeol
    • Corrosion Science and Technology
    • /
    • v.21 no.1
    • /
    • pp.62-67
    • /
    • 2022
  • The objective of this study was to perform failure analysis of an inlet pipe located in a governor valve of a steam turbine in a district heating system. During the operation, the temperature of the governor valve was increased to as high as ~500 ℃, which induced thermal expansion of the inlet pipe along both axial and radial directions. While the inlet pipe did not have contact with the valve seat, the side plane of the upside was constrained by the casing part, which led the inlet pipe to experience stress field in the form of fatigue and creep. The primary crack was initiated at about 30 mm below the top where the complex stress field was anticipated. These results suggest that the main failure mechanism is a combination of thermal fatigue and creep during the operation supported by the observation of apparent beach marks on the fracture surface and pores near the cracks, respectively.

Experimental Study on the Drag Reduction & Heat Transfer Ratio in the Circular Pipe with Swirl Generater (난류발생기를 가지는 원형 파이프내에서의 마찰저감 및 열전달율에 관한 실험적 연구)

  • Kim, Seong-Su;Cho, Sung-Hwan;Yoon, Seok-Mann
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.430-435
    • /
    • 2008
  • Total lengths of domestic pipe network for district heating system are above about 2,500Km. A lots of pumping power for heat transportation through long pipe are required by the flow friction of pipe surface. Until now there have been considered about various methods to reduce the flow friction for district heating system such as using surfactants and turbulence promoters by swirl flow and baffles etc. At this study, swirl flow generator was tested about the possibility to increase the heat transfer ratio at the heat exchanger in the case which the suppling water temperature increased from $50^{\circ}C$ until $120^{\circ}C$. Experimental results showed that the heat transfer ratio increased and also pressure increase ratio increased simultaneously in the case which swirl flow generator installed. The amount of the increasing ratio for heat transfer and pressure were reached until 4.33% and 11% at the case of $120^{\circ}C$ suppling temperature which domestic district heating system were using.

  • PDF

Corrosion Failure Analysis of Air Vents Installed at Heat Transport Pipe in District Heating System (지역난방수 공급관 에어벤트 부식 파손 분석)

  • Lee, Hyongjoon;Chae, Hobyung;Cho, Jeongmin;Kim, Woo Cheol;Jeong, Joon Cheol;Kim, Heesan;Kim, Jung-Gu;Lee, Soo Yeol
    • Corrosion Science and Technology
    • /
    • v.19 no.4
    • /
    • pp.189-195
    • /
    • 2020
  • Two air vents situated on a heat transport pipe in district heating system were exposed to the same environment for 10 years. However, one air vent was more corroded than the other. It also had a hole on the top of the front-end pipe. Comparative analysis was performed for these air vents to identify the cause of corrosion and establish countermeasures. Through experimental observation of the damaged part and analyses of powders sampled from air vents, it was found that corrosion was initiated at the top of the front-end pipe. It then spread to the bottom. Energy dispersive X-ray spectroscopy results showed that potassium and chlorine were measured from the corroded product in the damaged air vent derived from rainwater and insulation, respectively. The temperature of the damaged air vent was maintained at 75 ~ 120 ℃ by heating water. Rainwater-soaked insulation around the front-end pipe had been hydrolyzed. Therefore, the damaged air vent was exposed to an environment in which corrosion under insulation could be facilitated. In addition, ion chromatography and inductively coupled plasma measurements indicated that the matrix of the damaged front-end pipe contained a higher manganese content which might have promoted corrosion under insulation.

Design Validation and Improvement of District Heating Pipe Using FE Simulation (유한요소 시뮬레이션을 통한 지역난방열배관 특성 평가 및 강화이형관의 제안)

  • Kim, Joo-Yong;Kim, Ho-Bum;Ko, Hyun-Il;An, Yong-Mo;Cho, Chong-Du
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.33 no.4
    • /
    • pp.337-345
    • /
    • 2009
  • This paper investigates the reliability of district heating pipes at thermo-elastic fatigue loading. District heating pipes, subjected to $120^{\circ}C$ and $16kg_f/cm^2$ due to water distributing service through inside the pipes, should endure long term cyclic thermal-mechanical loadings. The heating pipes are the co-centric tubes of steel pipe, poly urethane(PUR) insulator, and high density poly ethylene(HDPE) case. On installation, foam pad is externally wrapped for accommodating stress reduction near the bend sections of pipes. However, there have been frequent reports on the failures of bend sections in the middle of long term service. This study scrutinizes the observed failures near the bend sections through applying the finite element methods. Specially in this study, heating pipes are studied on the influence of foam padding on failures and proposed new designs for reinforced bend without foam pad.

PRELIMINARY DESIGN AND ECONOMICS CONSIDERATION OF P-NEW-CITY DISTRICT HEATING MAIN PIPES AND PUMPIG STATION (Flowra를 이용한 P신도시 지역난방 주 배관망 및 펌프장 예비 설계 및 경제성 검토)

  • Kim, Jin-Kwon
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2010.05a
    • /
    • pp.127-128
    • /
    • 2010
  • As P-new-city is planned and constructed, district eating utilizing an existing near-by power plant's waste heat is considered as an economic and environment friendly way of providing heating to the new city. Many pipeline diameters and pumping station location and capacity were assumed, investigated and optimized, to satisfy the customers' heat demand considering common district heating pipe-network design and construction practice, and also and construction, pumping station land price and construction and the pumping energy cost during lifetime of DH systems.

  • PDF