• 제목/요약/키워드: Dismantling system

검색결과 118건 처리시간 0.024초

엘리베이터 설치 작업용 시스템 비계 개발에 관한 연구 (A Study on the Development of System Scaffolding for Elevator Installation Work)

  • 황종문;이기열;이경선;전두성
    • 한국안전학회지
    • /
    • 제37권4호
    • /
    • pp.51-57
    • /
    • 2022
  • In recent years, the government's urban housing expansion policy has resulted in increased construction and remodeling work of residential houses and apartments, causing more industrial accidents at elevator installation sites. Typically, accidents occur during the installation and dismantling of work scaffolds inside the hoistways or using non-standardized work scaffolds due to their structural instability. In view of this, the present study deals with the development of a standardized elevator system scaffolding that can be safely installed outside the hoistway, securing the work platform inside the hoistway. An improved version of the scaffolding system eliminates the need to enter the hoistway for the scaffolding installation, thereby preventing accidents.

Development of the Selection of Optimal Conceptual Design for the Noise-reduced Aluminum System Form

  • Hong, Jong Hyun;Yeom, Dong Jun;Seo, Jung Hoon;Kim, Young Suk
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.708-709
    • /
    • 2015
  • In Korea, a series of noise-reduced aluminum forms are being recently used in apartment housing construction. However, their complicated and time-consuming work processes, and the noise which is still generated due to the inherent property of aluminum when especially installing and dismantling them are have been pointed out as a problem to be certainly solved for increasing their practical use in construction sites. The primary objectives of this study are to propose a conceptual design of a newly designed noise-reduced aluminum form in which the noise can be enormously decreased during form works. The conceptual design in this study improved problems of conventional system aluminum forms, and, later, a system aluminum form developed based on this conceptual design will be able to ensure noise-reduction and safety as well as excellent applicability.

  • PDF

사용후핵연료 운반용기 및 건식저장 기술 동향 (Technology Trends in Spent Nuclear Fuel Cask and Dry Storage)

  • 신중철;양종대;성운학;류승우;박영우
    • 한국압력기기공학회 논문집
    • /
    • 제16권1호
    • /
    • pp.110-116
    • /
    • 2020
  • As the management plan for domestic spent nuclear fuel is delayed, the storage of the operating nuclear power plant is approaching saturation, and the Kori 1 Unit that has reached its end of operation life is preparing for the dismantling plan. The first stage of dismantling is the transfer of spent nuclear fuel stored in storage at plants. The spent fuel management process leads to temporary storage, interim storage, reprocessing and permanent disposal. In this paper, the technical issues to be considered when transporting spent fuel in this process are summarized. The spent fuels are treated as high-level radioactive waste and strictly managed according to international regulations. A series of integrity tests are performed to demonstrate that spent fuel can be safely stored for decades in a dry environment before being transferred to an intermediate storage facility. The safety of spent fuel transport container must be demonstrated under normal transport conditions and virtual accident conditions. IAEA international standards are commonly applied to the design of transport containers, licensing regulations and transport regulations worldwide. In addition, each country operates a physical protection system to reduce and respond to the threat of radioactive terrorism.

In-Situ 측정법을 이용한 고리 원자로 방사선원항 평가 (Assessment of the Radiological Inventory for the Reactor at Kori NPP Using In-Situ Measurement Technology)

  • 정현철;정성엽
    • 방사성폐기물학회지
    • /
    • 제12권2호
    • /
    • pp.171-178
    • /
    • 2014
  • 원전 해체 시 원자력설비는 안전하게 해체되어야 한다. 고리 1호기나 월성 1호기와 같은 노후화된 원전의 경우 곧 원전 해체를 계획하고 있는 대상 원전이지만, 이 원전들의 가동 중단 후 해체 시 선원항 평가 기준, 제염 및 해체 기술 등의 독자적인 국내 기술 확보는 미흡한 실정이다. 본 연구의 목적은 원전 선원항 평가 기술 중 하나로 In-Situ 기법을 이용하여 대형 원전 기기를 직접 측정하여 측정대상체에 대한 선원항 평가방법을 개발하는 것이다. 원자로 헤드를 별도의 해체 없이 이동형 감마핵종분석기를 이용하여 직접 측정법으로 분석하고 간접 측정을 병행하여 측정 결과를 보완하였다. 그리고, 표면오염시료는 방사화학분석을 수행하였다. 분석 결과를 확장하여 원자로의 핵종 재고량을 계산하였다. 본 연구 결과를 토대로 각 핵종별 방사능량 변화에 따라 해체 시점을 결정할 수 있으며, 원전 해체 시 작업자의 피폭 저감에 도움이 될 것으로 기대한다.

한국원자력연구원의 해체기술 개발 현황 및 향후 전망 (The Status and Prospect of Decommissioning Technology Development at KAERI)

  • 문제권;김선병;최왕규;최병선;정동용;서범경
    • 방사성폐기물학회지
    • /
    • 제17권2호
    • /
    • pp.139-165
    • /
    • 2019
  • 한국원자력연구원에서 개발 중인 해체기술 현황 및 전망에 대해 기술하였다. 특히, 해체의 핵심기술인 제염, 원격절단, 해체 폐기물처리 및 부지 복원 분야를 중점적으로 다루었다. 제염기술로는 부품제염과 원자력시스템제염 부분을 고찰하였고, 원격절단기술 관련해서는 절단기술, 원격제어 및 해체공정 모사기술이 다루어졌다. 해체 폐기물처리기술 관련해서는, 비록 해체 후 다양한 폐기물이 발생하지만, 주 폐기물인 금속, 가연성폐기물과 난처리성 특수 폐기물인 고염 고방사성 폐액, 유기혼성폐기물 및 우라늄 복합폐기물 처리기술 등을 주로 기술하였다. 마지막으로, 해체부지 복원 분야에서는 방사선 측정, 부지재이용의 안전성평가 그리고 부지 복원기술 등을 중점적으로 기술하였다.

풍력발전기용 피치/요 베어링의 시험절차 개발 (Development on Test Procedure of Pitch and Yaw Bearings for Wind Turbine)

  • 남주석;한정우
    • 한국생산제조학회지
    • /
    • 제24권3호
    • /
    • pp.355-362
    • /
    • 2015
  • Test procedure for the design verification of wind turbine pitch and yaw bearings has been developed. Test items were selected to evaluate operational reliability of pitch and yaw bearings by considering loading and operational conditions, and by analyzing the design criteria of pitch and yaw bearings. The developed test items consisted of preliminary test, fatigue load test, extreme load test, low temperature environmental test and dismantling inspection after all the test were completed. Because it reflects the actual operational conditions of the pitch and yaw bearings, the developed test procedure has high reliability and can verify the basic design considerations in the international standard and guidelines.

RISK ASSESSMENT USING BIM BASED SAFETY MANAGEMENT SYSTEM

  • Hongseob Ahn;Hyunjoo Kim;Wooyoung Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.107-110
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, falsework (temporary structures) in construction projects is fundamentally important. However, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. It is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop the safety assessment system, this research utilizes the BIM technology and collects important information by importing data from BIM models and use it in the planning stage.

  • PDF

An experimental study on the development and verification of NCC(new concrete cutting) system

  • Park, Jong-Hyup;Han, Jong-Wook
    • Structural Engineering and Mechanics
    • /
    • 제65권2호
    • /
    • pp.203-211
    • /
    • 2018
  • This paper introduces the development process of NCC(New Concrete Cutting) system and analyzes first verification test. Based on the first verification test results, some problems of NCC system have been newly modified. We carry out the second verification test. We tried to verify cutting performance and dust control efficiency of NCC system through the cutting test of concrete bridge piers. In particular, this verification test strives to solve the problem of concrete dust, which is the biggest problem of dry cutting method. The remaining dust problems in cutting section tried to solve through this verification test. This verification test of the NCC system shows that the dust problem of dry cutting method is closely controlled and solved. In conclusion, the proposed NCC method is superior to the dry cutting method in all aspects, including cutting performance, dust vacuum efficiency and cooling effect. The proposed NCC system is believed to be able to provide eco-friendly cutting technology to various industries, such as the removal of the SOC structures and the dismantling of nuclear plants, which have recently become a hot issue in the field of concrete cutting.

아카이브와 기록학 전환을 위한 시론 (A study on Transformation of Archives System and Archival Science)

  • 이경용
    • 기록학연구
    • /
    • 제80호
    • /
    • pp.167-196
    • /
    • 2024
  • 이 글은 기록학계의 현 국가아카이브 체제에 대한 해체와 재구성 논의 검토를 통해 아카이브와 기록학의 전환 필요성을 주장하였다. 시민사회 '기록활동' 사례를 '국가아카이브 기록현장' 사례와 극명하게 대비시킴으로써 현 아카이브 체제에 대한 미시적 관점에서의 해결 과제를 제시하고자 했다. 그리고 이 과정에서 역사기록을 중심으로 하는 기록학 연구방법론의 전환 필요성을, 아카이브 접근성을 보장하기 위한 기록정보 조직화와 계층기술 등에 대한 인식 심화와 정책 전환의 의미와 관련지어서 도출해보았다.

가새 설치 여부에 따른 시스템 동바리 거동변화에 대한 해석적 연구 (An Analytical Study on the Change of System Supports according to the Brace Installation)

  • 오병한;최병정
    • 한국안전학회지
    • /
    • 제33권2호
    • /
    • pp.104-111
    • /
    • 2018
  • System supports are widely used in concrete construction due to the convenience and structural safety at the point of both installation and dismantling. However, there were frequent collapses in the construction sites due to the absence of both structural review and brace installations. Therefore, this paper examines the importance of braces in the system supports. In order to examine the importance of the brace, four types of braces were considered: 100% braces, 50% braces, 25% braces, and without braces. The maximum displacement of the 100% braced model was 0.97 mm, the 50% braced model was 1.13 mm, the 25% braced model was 1.16 mm and the non-braced model was 24.3 mm, respectively. Compared to the model with the without-braces, the model with 100% of the braces installed has a displacement of 4.0%, the model with 50% of the braces showed a displacement of 4.7%, and the model with 25% of the braces appeared to be a displacement of 4.8%. That is, the installation of the braces is effective in reducing the maximum displacement of the system supports and is effective in reducing the maximum displacement with only small number of braces installed.