• 제목/요약/키워드: Disconnect switch

검색결과 8건 처리시간 0.022초

정전비용과 신뢰도 분석을 통한 분할 개폐기의 적정 자동화율 도출 알고리즘에 관한 연구 (Study on the algorithm for the Reasonable Switch Automation Rate with Customer Interruption Cost and Reliability Evaluation)

  • 채희석;신희상;조성민;문종필;김재철
    • 전기학회논문지
    • /
    • 제62권4호
    • /
    • pp.467-473
    • /
    • 2013
  • The addition of disconnect switches to a distribution feeder or the replacement of the manual switches with the automatic switches do, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder and reducing the outage section. However, the improvement of reliability in power distribution system causes an increase of the investment cost, for example, replacement costs, labor costs, and so on. For this reason - the balance between investment and reliability improvement - many studies about the appropriate level of investment have been conducted. In this paper, we suggest the algorithm for determining the reasonable switch automation rate in the power distribution system. We evaluate the customer interruption cost and reliability for several cases - these cases relate with the switch automation rate - in the domestic metropolitan power distribution system, estimate the effectiveness of changing the manual switch to automatic switch quantitatively. These results can help the determining on the disconnect switch's automation rate.

경량전철 급전전력 보호 제어용 직류배전반 개발(I) (Development of DC switch gear for LRT system protection and control( I ))

  • 김남해;백병산;전용주;김지홍;이병송;김종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(II)
    • /
    • pp.995-1000
    • /
    • 2002
  • This paper presents general concept of DC switch gear(DCSWGR). Normally, DCSWGR consist of Digital protection unit(DPU), High Speed Circuit Breaker(HSCB), Disconnect Switch (DS), Programmable Logic Control(PLC), Auxiliary Relays and etc. Most of the components has its special characteristics and their interface between each others are various and complex. In this paper every constituent general design are preceded and interface between each component are examined. And also DCSWGR operation logic with logical diagram including interlock signal are introduced.

  • PDF

Static Switch Controller Based on Artificial Neural Network in Micro-Grid Systems

  • Saeedimoghadam, Mojtaba;Moazzami, Majid;Nabavi, Seyed. M.H.;Dehghani, Majid
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권6호
    • /
    • pp.1822-1831
    • /
    • 2014
  • Micro-grid is connected to the main power grid through a static switch. One of the critical issues in micro-grids is protection which must disconnect the micro-grid from the network in short-circuit contingencies. Protective methods of micro-grid mainly follow the model of distribution system protection. This protection scheme suffers from improper operation due to the presence of single-phase loads, imbalance of three-phase loads and occurrence of power swings in micro-grid. In this paper, a new method which prevents from improper performance of static micro-grid protection is proposed. This method works based on artificial neural network (ANN) and able to differentiate short circuit from power swings by measuring impedance and the rate of impedance variations in PCC bus. This new technique provides a protective system with higher reliability.

765[㎸] 변전소 시뮬레이터를 위한 조류계산 프로그램에 관한 연구 (A Study on the Load Flow Program for 765[㎸] Substation Simulator)

  • 여상민;김철환;이종포
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권4호
    • /
    • pp.201-206
    • /
    • 2003
  • Power system is analyzed by three methods of load flow, fault calculation, and voltage stability. Among there, load flow is calculated to flow of power in power in system at steady state. But, load flow is difficult to analyze to flow of power in substation, because power flow frequently alter by various equipments such as circuit bleaker, disconnect switch and shunt reactor. Particular, in 765[㎸] system, because of form of 1.5GB for stable operation, structure of substation has been very complex. In this paper, we describe technique for application of load flow algorithm in simulator for 765[㎸] substation. For this technique, we built each database for various equipments and considered form of 1.5GB Data as form of bus and line, for application of load flow, are acquired from built database, and then calculate load flow in substation. And. results of load flow are outputted in screen of operator console program.

V5.2 프로토콜의 성능 및 구조분석 (The research of 5.2 protocol performance and structure)

  • 이성우;이병란;이종영
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국해양정보통신학회 2003년도 춘계종합학술대회
    • /
    • pp.226-230
    • /
    • 2003
  • V5.2는 ETSI/ITU-T표준으로써 로컬 교환기와 가입자망간의 개방형(Open) 인터페이스(SNI=Service Node Interface) 통합 액세스 네트웍 구조를 제공하는 프로토콜로 2Mbps 이하의 교환/전용회선 서비스를 제공한다. 본 논문에서는 차세대 통신망에 필수적인 V5.2 인터페이스 시스템이 U에 시설되면서 V5.2 프로토콜의 성능이 기존의 로컬 교환기에서 제공되는 서비스를 모두 가능한지 검증하였다. V5.2 프로토콜 검증을 위하여 ETSI에서 발표한 권고 안을 기준으로 실험하였다. V5.2 표준 권고 안에서는 V5.2 프로토콜 Start-up과 각 서브 프로토콜 속성별로 구분하여 검증할 수 있는 세부 실험 절차가 제시되어 있다. 실험에서 V5.2 프로토콜 스택은 TDX-100교환기에 적합하도록 구성되었으며 여러가지 측면에서 시스템 구조의 안정성을 검증하고 실험이 진행되면서 발생한 문제점 및 대책을 기술하였다.

  • PDF

THE ANALYSIS OF PSM (POWER SUPPLY MODULE) FOR MULTI-SPECTRAL CAMERA IN KOMPSAT

  • Park Jong-Euk;Kong Jong-Pil;Heo Haeng-Pal;Kim Young Sun;Chang Young Jun
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2005년도 Proceedings of ISRS 2005
    • /
    • pp.493-496
    • /
    • 2005
  • The PMU (Payload Management Unit) in MSC (Multi-Spectral Camera) is the main subsystem for the management, control and power supply of the MSC payload operation. The PMU shall handle the communication with the BUS (Spacecraft) OBC (On Board Computer) for the command, the telemetry and the communications with the various MSC units. The PMU will perform that distributes power to the various MSC units, collects the telemetry reports from MSC units, performs thermal control of the EOS (Electro-Optical Subsystem), performs the NUC (Non-Uniformity Correction) function of the raw imagery data, and rearranges the pixel data and output it to the DCSU (Data Compression and Storage Unit). The BUS provides high voltage to the MSC. The PMU is connected to primary and redundant BUS power and distributes the high unregulated primary voltages for all MSC sub-units. The PSM (Power Supply Module) is an assembly in the PMU implements the interface between several channels on the input. The bus switches are used to prevent a single point system failure. Such a failure could need the PSS (Power Supply System) requirement to combine the two PSM boards' bus outputs in a wired-OR configuration. In such a configuration if one of the boards' output gets shorted to ground then the entire bus could fail thereby causing the entire MSC to fail. To prevent such a short from pulling down the system, the switch could be opened and disconnect the short from the bus. This switch operation is controlled by the BUS.

  • PDF

362kV GIS 차단부 3차원 전계해석 및 스페이서에 부착된 파티클의 영향 분석 (3 Dimensional Electric Field Analysis for 362kv GIS and Analysis on the effect of particle attached on spacer)

  • 류성식;석복렬;이형구;김용한;송태헌;최영찬
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 C
    • /
    • pp.1773-1775
    • /
    • 2003
  • In this Study, the insulation safety for Closing Resistor and Disconnect Switch(DS) of 362kV GIS was estimated through 3 dimensional electric field analysis. In addition, the basic study to secure the electric insulation design technique was carried out through the research on the effect of a metallic particle which is generated in the GIS. As a result of 3 dimensional electric field analysis, it was found that the insulation capability of Closing Resistor and DS of 362kV GIS is stable electrically. Also, the fundamental data to improve the insulation capability of spacer was obtained by analyzing the maximum electric field according to the attached angle of a metallic particle which is attached on the surface of a spacer.

  • PDF

공간구조론을 적용한 종합병원 외래부 유도사인 배치 및 평가에 관한 연구 - G.D.Weisman의 길찾기 요소를 중심으로 (A Study on the Guidance Signage System of Outpatient in General Hospital using Spatial Configuration Theory - View from G.D.Weisman's Way-finding Influence Factors)

  • 김석태;백진경
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제21권3호
    • /
    • pp.25-35
    • /
    • 2015
  • Purpose: Signs that are installed at unnoticeable places or that disconnect before the destination can bring errors of location information delivery. Therefore, this study aims to find out the spatial relation between structure of space and signs in the perspective of visual exposure possibility, operating arrangement and assesment by applying spatial structure theory. Methods: Effectiveness of organization of guidance signs was evaluated after the four way-finding factors(Plan Configuration, Sign System, Perceptual Access, Architectural Difference) that G.D.Weisman suggested were interpreted by spatial structure theory(J-Graph analysis, Space Syntax, Visual Graph Analysis) under the premise that it is closely related to the structure of space. Results: 1) Because the south corridor that connects each department of outpatient division is located in the hierarchy center of the space, and walking density is expected to be high, guidance signs need to be organized at the place with high integration value. 2) The depth to the destination space can be estimated through J-Graph analysis. The depth means a switch of direction, and the guidance signs are needed according to the number. 3) According to visibility graph analysis, visual exposure can be different in the same hierarchy unit space according to the shape of the flat surface. Based on these data, location adjustment of signs is possible, and the improvement effect can be estimated quantitatively. Implications: Spatial structure theory can be utilized to design and evaluate sign systems, and it helps to clearly understand the improvement effect. It is desirable to specify design and estimation of sign systems in the order of J-Graph analysis${\rightarrow}$Space Syntax Theory${\rightarrow}$visibility graph analysis.