• Title/Summary/Keyword: Discharge hydrograph

Search Result 153, Processing Time 0.025 seconds

Uncertainty of Discharge-SS Relationship Used for Turbid Flow Modeling (탁수모델링에 사용하는 유량-SS 관계의 불확실성)

  • Chung, Se-Woong;Lee, Jung-Hyun;Lee, Heung-Soo;Maeng, Seung-Jin
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.12
    • /
    • pp.991-1000
    • /
    • 2011
  • The relationship between discharge (Q) and suspended sediment (SS) concentration often is used for the estimation of inflow SS concentration in reservoir turbidity modeling in the absence of actual measurements. The power function, SS=aQb, is the most commonly used empirical relation to determine the SS load assuming the SS flux is controlled by variations of discharge. However, Q-SS relation typically is site specific and can vary depending on the season of the year. In addition, the relation sometimes shows hysteresis during rising limb and falling limb for an event hydrograph. The objective of this study was to examine the hysteresis of Q-SS relationships through continuous field measurements during flood events at inflow rivers of Yongdam Reservoir and Soyang Reservoir, and to analyze its effect on the bias of SS load estimation. The results confirmed that Q-SS relations display a high degree of scatter and clock-wise hysteresis during flood events, and higher SS concentrations were observed during rising limb than falling limb at the same discharge. The hysteresis caused significant bias and underestimation of SS loading to the reservoirs when the power function is used, which is important consideration in turbidity modeling for the reservoirs. As an alternative of Q-SS relation, turbidity-SS relation is suggested. The turbidity-SS relations showed less variations and dramatically reduced the bias with observed SS loading. Therefore, a real-time monitoring of inflow turbidity is necessary to better estimate of SS influx to the reservoirs and enhance the reliability of reservoir turbidity modeling.

Runoff Analysis Using the Discrete, Linear, Input-Output Model (선형 이산화 입력-출력 모형에 의한 유출해석)

  • Kwak, Ki Seok;Kang, In Shik;Jeong, Yeon Tae;Kang, Ju Bok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.859-866
    • /
    • 1994
  • It is difficult to make an exact estimate of the peak discharge or the runoff depth of flood and establish the proper measure for the flood protection since the water stage or discharge has been nearly measured at most medium or small river basins. The objective of this study is to estimate parameters of the discrete, linear, input-output model for medium or small river basin. The On-Cheon River basin in Pusan was selected for the study area. The runoff data used in the study has been observed since June 1993, and the effective rainfall was determined using the storage function method. The parameter sets of the discrete, linear, input-output model were estimated using the least squares method and the correlation function method, respectively. The calculated hydrographs by the discrete, linear, input-output model regenerated the observed outflow hydrographs well, and also the simulated flood hydrograph was comparable to the observed one. Therefore, it is believed that the discrete, linear, input-output model is simpler than other runoff analysis methods, and can be applied to a medium or small river basin.

  • PDF

The Estimations of A Conceptual Time Distribution of Rainfall and Design Flood (강우의 개념적 시간분포와 설계홍수량 산정에 관한 연구)

  • Lee Byung Woon;Jang Dae Won;Kim Hung Soo;Seoh Byung Ha
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.937-942
    • /
    • 2005
  • It is necessary to estimate the runoff hydrograph and peak flood discharge using law of probability for synthetic flood control policy and design of hydraulic structures. Rainfall analysis is needed in the process of peak flood discharge estimation and the time distribution of a design rainfall is a very important process in the analysis. In this study, we estimate design flood for a small urban basin and a rural basin of medium scale which have different travel times. The Huff method is widely used in Korea for the time distribution of design rainfall to estimate design flood. So, we use Huff method and a conceptual method which is suggested in this study for the comparative purpose. The 100-year frequency rainfall is used to estimate design flood for each basin and the design flood is compared with the existing design flood. As the result, the design flood is overestimated $14.6m^3/sec$ by Huff method and is underestimated $70.9m^3/sec$ by a conceptual method for the rural basin. For the small urban basin, the design flood is excessively overestimated $294.65m^3/sec$ by Huff method and is overestimated $173m^3/sec$ by a conceptual method. The reason of excessive overestimation by Huff method in the small urban basin is that the increased rate of rainfall intensity according to the decrease of duration is large and the duration exceeds the time of concentration when the increased rainfall intensity is concentrated in a quartile. Therefore, we suggested a conceptual method for the time distribution of design rainfall by considering the rainless period and duration. Especially, the conceptual method might be useful for the small urban basin with short concentration time which the design flood is overestimated by Huff method.

  • PDF

Flood Runoff Simulation Using Physical Based Distributed Model for Imjin-River Basin (물리적기반의 분포형모형을 활용한 임진강유역 홍수유출모의)

  • Park, Jin-Hyeog;Hur, Young-Teck
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.1
    • /
    • pp.51-60
    • /
    • 2009
  • 2/3 of the Imjin River Basin area is located in North Korea, so it was hard to acquire reliable rainfall and hydrological information. This point is one of the factors that has added to flood damage. In this study, flood runoff for the river basin was simulated using hydrological radar, which is installed in an effort to reduce flood damage in the Imjin River Basin, which habitually suffers from flood damage. The feasibility of the distributed flood model was reviewed for the river basin, which is lacking in hydrological data such as rainfall and recent soil data. Based on the hydrograph, observed value was not consistent partially because of insufficient data, but peak discharge and the overall pattern showed relatively precise runoff results which can be applied in actual work.

Development of a Comprehensive Flood Index through Standardizing Distributions of Runoff Characteristics (유출특성 분포함수의 표준화를 통한 종합홍수지수의 개발)

  • Wi, Sung-Wook;Chung, Gun-Hui;Kim, Tae-Woong
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.6
    • /
    • pp.605-617
    • /
    • 2008
  • This study developed a flood index which evaluates runoff characteristics. Runoff characteristics expressed in a hydrograph were reflected in the flood index in the form of characteristic factors such as a rising curve gradient, a peak discharge, a flood response time, and a flood discharge volume prior to peak. This study applied the standardization method to estimate the relative severity of the characteristic factors by transforming the distribution of characteristic factors into the standard normal distribution. The flood index developed in this study is a comprehensive flood index (CFI) which makes up for the weak points of a flash flood index (FFI) in determining relative severities. The CFI was applied to Han River basin and Selma River basin, and was compared with the FFI based on the correlation analysis and the regression analysis. The CFI could comprehensively evaluate flood runoff characteristics because the CFI is not dominated by a specific characteristic factor, and the CFI could explain more efficiently the relationship between rainfall and runoff than the FFI.

A Rainfall-runoff Analysis Method of SWMM Model Considering Building Height (건물 높이를 고려한 SWMM 모형의 강우-유출해석 방법 제안)

  • Lee, Hyoungtaek;Cho, Eunsaem;Yoo, Chulsang
    • Journal of Wetlands Research
    • /
    • v.20 no.1
    • /
    • pp.14-19
    • /
    • 2018
  • In this study, the method considering the influence of the high-rise building in urban rainfall-runoff analysis using SWMM was proposed. The method proposed in this study was to calculate the time of reaching the surface of the rainwater considering the size and height of the building, and to modify the basin width to reflect this. In the method proposed in this study, the concentration time considering the size and height of the building is calculated and based on this time the basin width is modified. The proposed method was verified with the experimental result of Isidoro et al. (2012). As a result, the proposed method was found to be valid since the simulated hydrograph was fairly identical to experimental result. In both hydrographs, it was confirmed that the change of the discharge characteristic, such as decrease of peak discharge and lag of peak time, over increasing density of the building was similar each other.

Watershed-based PMF and Sediment-runoff Estimation Using Distributed Hydrological Model (분포형 수문모형을 이용한 유역기반의 PMF 및 유사-유출량 산정)

  • Yu, Wansik;Lee, Giha;Kim, Youngkyu;Jung, Kwansue
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.2
    • /
    • pp.1-11
    • /
    • 2018
  • Probable Maximum Flood (PMF) is mostly applied for the designs of large-scale hydraulic structures and it is estimated by computing the runoff hydrograph where Probable Maximum Precipitation (PMP) is inserted as design rainfall. The existing PMP is estimated by transferring the heavy rainfall from all watersheds of korea to the design watershed, however, in this study, PMP was analyzed by selecting only rainfall events occurred in the design watershed. And then, Catchment-scale Soil Erosion Model (CSEM) was used to estimate the PMF and sediment-runoff yield according to the watershed-based estimated PMP. Although the PMF estimated in this study was lower than the existing estimated PMF in the Yongdam-dam basin, it was estimated to be higher than the 200-year frequency design flood discharge. In addition, sediment-runoff yield was estimated with a 0.05 cm of the maximum erosion and a 0.06 cm of the maximum deposition, and a total sediment-runoff yield of 168,391 tons according to 24-hour PMP duration.

Flood Hindcast in the Tidal Reaches of the Han River (한강감조구간(漢江感潮區間)의 홍수추정(洪水推定))

  • Choi, Byung Ho;Suh, Kyung Suck
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.7 no.3
    • /
    • pp.133-139
    • /
    • 1987
  • Three disastrous floods experienced over the tidal reaches of the Han River are investigated numerically with the use of one-dimensional finite-difference tidal flow model. The hindcast scheme involves processing flood hydrograph at Indogyo to provide the necessary discharge variation at upstream boundary and predicting tidal elevations at downstream boundary that computes the response in terms of flood levels and discharges within the tidal reaches. Computed results of 1925, 1972 and 1984 floods are presented and discussed.

  • PDF

GIS Application Model for Spatial Simulation of Surface Runoff from a Small Watershed(I) (소유역 지표유출의 공간적 해석을 위한 지리정보시스템의 응용모형(I) -격자 물수지 모형의 개발 및 적용-)

  • 김대식;정하우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.3_4
    • /
    • pp.23-33
    • /
    • 1995
  • Geographic data which are difficult to handle by the characteristics of spatial variation and variety turned into a possibility to analyze with tlie computer-aided digital map and the use of Geographic Information System(GIS). The purpose of this study is to develop and apply a GIS application model (GISCELWAB) for the spatial simulation of surface runoff from a small watershed. This paper discribes the modeling procedure and the applicability of the cell water balance model (CELWAB) which calculates the water balance of a cell and simulates surface runoff of watershed simultaneously by the interaction of cells. The cell water balance model was developed to simulate the temporal and spatial storage depth and surface runoff of a watershed. The CELWAB model was constituted by Inflow-Outflow Calculator (JOC) which was developed to connect cell-to-cell transport mechanism automatically in this study. The CELWAB model requests detail data for each component of a cell hydrologic process. In this study, therefore, BANWOL watershed which have available field data was selected, and sensitivity for several model parameters was analyzed. The simulated results of surface runoff agreed well with the observed data for the rising phase of hydrograph except the recession phase. Each mean of relative errors for peak discharge and peak time was 0.21% and2.1 1% respectively. In sensitivity analysis of CELWAB , antecedent soil moisture condition(AMC) affected most largely the model.

  • PDF

Estimation of Storm Hydrographs in a Small Forest Watershed Using a Distributed Hydrological Model (분포형 수문모형을 이용한 산림소유역의 홍수수문곡선의 추정)

  • Lee, Sang-Ho;Woo, Bo-Myeong;Im, Sang-Jun
    • Korean Journal of Ecology and Environment
    • /
    • v.41 no.1
    • /
    • pp.43-53
    • /
    • 2008
  • This study was conducted to simulate storm hydrographs on a small forested watershed using TOPMODEL, which is a distributed hydrological model. The Myeongseong watershed, which is 58.3 ha in size, was selected to monitor rainfall and runoff data. The Monte Carlo simulation was also used to calibrate parameters of TOPMODEL. Six rainfall-runoff pairs collected at the watershed in the year 1997 were used for parameter calibration, and eight rainfall-runoff pairs collected during the period of $1998\sim1999$ were used for validation effort. The errors of runoff volume ranged from -2.74% to 1.81%, and an average value of model efficiency in terms of runoff volume was 0.92 for the calibration period. The average value of observed peak discharge was $0.324m^3\;s^{-1}$ for six rainfall-runoff pairs, while the prediction value was $0.295m^3\;s^{-1}$. The simulation errors of peak discharge varied according to rainfall characteristics and antecedent condition, within ranges of -27.65% to -1.13%. The model efficiency for the validation period was 0.92. For the validation period, observed peak discharges have an average value of $0.087m^3\;s^{-1}$ and average value of simulated peak discharge was $0.090m^3\;s^{-1}$. Observed and simulated values of time to peak for the calibration period were 18.3 hrs and 11.0 hrs, respectively, and 16.6 hrs and 13.5 hrs, respectively, for the validation period.