• Title/Summary/Keyword: Digital Terrain Map

Search Result 181, Processing Time 0.023 seconds

A Study on the Generation of Perspective Image View for Stereo Terrain Analysis for the Route Decision of Highway (고속도로 노선선정에서의 입체지형분석을 위한 영상조감도 생성에 관한 연구)

  • Yeon, Sang-Ho;Hong, Ill-Hwa
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.5 no.3
    • /
    • pp.1-8
    • /
    • 2002
  • The technology for the three-dimensional terrain perspective view can be used as an important factor in planning and designing for the various construction projects. In this study, the stereo image perspective view has been generated for the multi-dimension analysis by combining useful digital map and remotely sensed satellite images. In the course of experimenting with the three-dimensional topography generated by the combination of the orthopimage by the precise GCP and DEM from the contour line, the technology has been developed to offer the multi-dimensional access to the potential construction sites from the nearby main roads. This stereo image bird's eye view has made it possible to make multi-dimensional analysis on the terrain, which provides real-time virtual access to the designated construction sites and will be a versatile application for development planning and construction projects.

  • PDF

An Implementation of Interferometric Radar Altimeter Simulator (간섭계 레이더 고도계용 시뮬레이터 구현)

  • Paek, Inchan;Lee, Sangil;Yoo, Kyungju;Jang, Jong Hun
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.26 no.1
    • /
    • pp.81-87
    • /
    • 2015
  • We present an implementation result of a computer GUI-based simulator using MATLAB to verify the performance of interferometric radar altimeter(IRA) which is possible to measure the slant range altitude and the cross-track angle to the nearest point for terrain aided navigation(TAN). After a brief description of the principle of TAN and IRA, we present that the grids are divided for the modeling of the reflected signal in digital elevation map(DEM) and so the radar cross section(RCS) of each grid is calculated and the signal-noise ratio(SNR) of the reflected signal in the radar beam width. And the signal processing procedures of the IRA and the structure of the IRA simulator are shown.

Real-Time Terrain Visualization with Hierarchical Structure (실시간 시각화를 위한 계층 구조 구축 기법 개발)

  • Park, Chan Su;Suh, Yong Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.311-318
    • /
    • 2009
  • Interactive terrain visualization is an important research area with applications in GIS, games, virtual reality, scientific visualization and flight simulators, besides having military use. This is a complex and challenging problem considering that some applications require precise visualizations of huge data sets at real-time rates. In general, the size of data sets makes rendering at real-time difficult since the terrain data cannot fit entirely in memory. In this paper, we suggest the effective Real-time LOD(level-of-detail) algorithm for displaying the huge terrain data and processing mass geometry. We used a hierarchy structure with $4{\times}4$ and $2{\times}2$ tiles for real-time rendering of mass volume DEM which acquired from Digital map, LiDAR, DTM and DSM. Moreover, texture mapping is performed to visualize realistically while displaying height data of normalized Giga Byte level with user oriented terrain information and creating hill shade map using height data to hierarchy tile structure of file type. Large volume of terrain data was transformed to LOD data for real time visualization. This paper show the new LOD algorithm for seamless visualization, high quality, minimize the data loss and maximize the frame speed.

Wind Farm Siting in Mountainous Terrain By Geomorphometric Characterization (지형형태 분류에 의한 산악지형 내 풍력단지 입지평가)

  • Kim, Hyun Goo;Hwang, Hyo Jung;Kang, Yong Heack;Yun, Chang Yeol;Jung, Bi Rin;Song, Kyu Bong
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.4
    • /
    • pp.13-19
    • /
    • 2014
  • To develop a wind farm in a mountainous terrain like Korea, it is generally more advantageous to install wind turbines along a mountain ridge where has relatively better wind resource because that is open in all directions and free from shielding by the surrounding topography. In this study, the SRTM (Shuttle Radar Topography Mission) v4.1 3 arc-second resolution digital elevation database and the geomorphometric characterization software LandSerf v2.3 are used to extract ridge lines for assessing a wind farm siting in mountainous terrain. The effectiveness of wind farm siting along a ridge line is confirmed that the most of wind turbines in the Gangwon, Taegisan, and Maebongsan wind farms in Korea's mountainous terrain are placed along the primary and secondary ridge lines where wind resource is relatively outstanding.

A Numerical Study on the Effect of Mountainous Terrain and Turbine Arrangement on the Performance of Wind Power Generation (지형에 따른 발전기 배치가 풍력 발전 성능에 미치는 영향에 관한 수치해석 연구)

  • Lee, Myung-Sung;Lee, Seung-Ho;Hur, Nahm-Keon
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.34 no.10
    • /
    • pp.901-906
    • /
    • 2010
  • A three-dimensional flow simulation was performed to investigate the flow field in a wind farm on a complex terrain. The present study aims to examine the effects of mountainous terrain and turbine arrangement on the performance of wind power generation. A total of 49 wind turbines was modeled in the computational domain; detailed blade shape of the turbines was considered. Frozen rotor method was used to simulate the rotating operation. The torque acting on the turbine blades was calculated to evaluate the performance of the wind turbines. The numerical results showed details of the flow structure in the wind farm including the velocity deficit in the separated flow regions; this velocity deficit was due to the topographical effect. The effect of the wake induced by the upstream turbine on the performance of the downstream wind turbine could also be observed from the results. The methodology of the present study can be used for selecting future wind-farm sites and wind-turbine locations in a selected site to ensure maximum power generation.

Analyzing the Disaster Vulnerability of Mt. Baekdusan Area Using Terrain Factors (지형 요소를 고려한 백두산 지역의 위험도 분석)

  • Choi, Eun-Kyeong;Kim, Sung-Wook;Lee, Young-Cheol;Lee, Kyu-Hwan;Kim, In-Soo
    • Journal of the Korean earth science society
    • /
    • v.34 no.7
    • /
    • pp.605-614
    • /
    • 2013
  • Most steep slope failures tend to take place in geographically unstable areas. Mt. Baekdusan is known as a potentially active volcano in a typical mountainous terrain. This study prepared a digital elevation model of Mt. Baekdusan area and created a hazard map based on topographical factors and structural lineament analysis. Factors used in vulnerability analysis included geographical data involving aspect and slope distribution, as well as contributory area of upslope, tangential gradient curvature, profile gradient curvature, and the distribution of wetness index among the elements that comprise topography. In addition, the stability analysis was conducted based on the lineament intensity map. Concerning the disaster vulnerability of Mt. Baekdusan region, the south and south west area of Mt. Baekdusan has a highest risk of disaster (grade 4-5) while the risk level decreases in the north eastern region.

Estimation of the Topographic Factor of Wind Speed Using GIS Information (GIS 정보를 이용한 풍속지형계수 산정)

  • Seong, Min-Ho;Choi, Se-Hyu
    • Spatial Information Research
    • /
    • v.19 no.5
    • /
    • pp.47-52
    • /
    • 2011
  • Recently damage scale by local winds and typhoon has dramatically increased. Korea has the terrain over 70% of the land and the planning of the wind load is necessary to estimate reflecting appropriately the change of the wind-speed according to the characteristic of the terrain and in the Korean Building Code(2009), this is stated and it reflects to the design process. However, in order to estimate the topographic factor of the wind speed considering the topographic characteristics in the structure design actually, it has many difficult points including the local topographic survey, etc. In this paper, the Digital Elevation Model(DEM) is created using TIN interpolation method in the form of the digital map and then the interface was designed and implemented which can automatically estimate the topographic factor of wind speed by using ESRI(R)ArcObjectTM and the Visual Basic programing language. By applying it to the terrain which positioned in the downtown area, the practicality of the topographic factor of wind speed estimation interface was checked.

Design Route Analysis of Dangerous Road for Traffic Accident using GIS (GIS를 이용한 사고 위험도로의 설계노선 분석)

  • Lee, Kye-Dong;Jung, Sung-Heuk;Lee, Jae-Kee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.6
    • /
    • pp.591-598
    • /
    • 2008
  • Recently, the government has improvement projects of dangerous road for the site that has very high accident rate due to bad geometric structures of the road. Although, route selecting of the road is a basic and important process, but the process of route selecting must consider the technical, safety and environment factor together. Also, the technology for the 3-dimensional terrain model can be used as an important factor in planning and designing for selecting alternative route projects. In the course of experimenting with the 3-dimensional topography generated by the combination of the digital map and drawing of route, the technology as been developed to offer the multi-dimensional access to the potential construction sites from the nearby main roads. This 3-dimensional digital elevation model has made it possible to make various terrain analysis base on GIS, which provides real-time virtual access to the designated construction sites for development planning and construction projects. Therefore, this study presents a reasonable plan for route selecting from some alternative routes through subjective evaluation and classify the methods linked basic design of road construction.

A Study on the Improvement of Guideline in Digital Forest Type Map (수치임상도 작업매뉴얼의 개선방안에 관한 연구)

  • PARK, Jeong-Mook;DO, Mi-Ryung;SIM, Woo-Dam;LEE, Jung-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.1
    • /
    • pp.168-182
    • /
    • 2019
  • The objectives of this study were to examine the production processes and methods of "Forest Type Map Actualization Production (Database (DB) Construction Work Manual)" (Work Manual) identify issues associated with the production processes and methods, and suggest solutions for them by applying evaluation items to a 1:5k digital forest type map. The evaluation items applied to a forest type map were divided into zoning and attributes, and the issues associated with the production processes and methods of Work Manual were derived through analyzing the characteristics of the stand structure and fragmentation by administrative districts. Korea is divided into five divisions, where one is set as the area changed naturally and the other four areas set as the area changed artificially. The area changed naturally has been updated every five years, and those changed artificially have been updated annually. The fragmentation of South Korea was analyzed in order to examine the consistency of the DB established for each region. The results showed that, in South Korea, the number of patches increased and the mean patch size decreased. As a result, the degree of fragmentation and the complexity of shapes increased. The degree of fragmentation and the complexity of shapes decreased in four regions out of 17 regions (metropolitan cities and provinces). The results indicated that there were spatial variations. The "Forest Classification" defines the minimum area of a zoning as 0.1ha. This study examined the criteria for the minimum area of a zoning by estimating the divided object (polygon unit) in a forest type map. The results of this study revealed that approximately 26% of objects were smaller than the minimum area of a zoning. The results implied that it would be necessary to establish the definition and the regeneration interval of "Areas Changed Artificially and Areas Changed Naturally", and improve the standard for the minimum area of a zoning. Among the attributes of Work Manual, "Species Change" item classifies terrain features into 52 types, and 43 types of them belong to stocking land. This study examined distribution ratios by extracting species information from the forest type map. It was found that each of 23 species, approximately 53% of species, occupied less than 0.1% of Forested land. The top three species were pine and other species. Although undergrowth on unstocked forest land are classified in the terrain feature system, their definition and classification criteria are not established in the "Forest Classification" item. Therefore, it will be needed to reestablish the terrain feature system and set the definitions of undergrowth.

Analysis of Accuracy and DTM Generation Using Digital Photogrammetry (수치사진 측량을 이용한 DTM 추출 및 정확도 분석)

  • Park, Jin-Seong;Hong, Sung-Chang;Sung, Jae-Ryeol;Lee, Byung-Hwan
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.301-306
    • /
    • 2010
  • Recently GIS is not only displaying and servicing data on the 2D, but also is changing rapidly to display and service 3D data. Also 3D related technology is developing actively. For display of 3D data, terrain DTM has become a basis. Generally, to acquire DTM, users are using LIDAR data or digital map's contour line. However, if using these data for producing DTM, users need to additional cost and data lead time. And hard to update terrain data. For possibility of solving these problem, this study did DTM extraction with automatic matching for aerial photograph, and analysed the result with measurement of Orthometric height and excuted accuracy through DTM(which extracted from digital photogrammetric technique). As a result, we can get a high accuracy of RMSE (0.215m).

  • PDF