The ability to defend against floods in urban areas was weakened, because the increase in the impervious rate of urban areas due to urbanization and industrialization and the increase in the localized torrential rainfall due to abnormal climate. In order to reduce flood damage in urban areas, various runoff reduction facilities such as detention ponds and infiltration facilities were installed. However, in the case of domestic metropolitan cities, it is difficult to secure land for the installation of storm water reduction facilities and secure the budget for improving the aged pipelines. Therefore, it is necessary to design a storage system (called the detention pond in trunk sewer) that linked the existing drainage system to improve the flood control capacity of the urban area and reduce the budget. In this study, to analyze the effect of reducing runoff amounts according to the volume of the detention pond in trunk sewer, three kinds of virtual watershed (longitudinal, middle, concentration shape) were assumed and the detention pond in trunk sewer was installed at an arbitrary location in the watershed. The volume of the detention pond in trunk sewer was set to 6 cases ($1,000m^3$, $3,000m^3$, $5,000m^3$, $10,000m^3$, $20,000m^3$, $30,000m^3$), and the installation location of the detention pond in trunk sewer was varied to 20%, 40%, 60%, and 80% of the detention pond upstream area to the total watershed area (DUAR). Also, using the results of this study, a graph of the relationship and relational equation between the volume of the detention pond in trunk sewer and the installation location is presented.
Journal of the korean academy of Pediatric Dentistry
/
v.43
no.4
/
pp.401-409
/
2016
This research investigates into overall oral health status of adolescent girl inmates in a juvenile detention facility and ordinary school students in the same age range of 11 to 18 years old and compares the results focusing on the difference between the two groups. The last 5 years dental records for girl inmates in Juvenile detention facility and for students who have visited the Department of Pediatric Dentistry at Ajou University Hospital was colleted and analyzed. The restorative treatments took up the greatest part in their history of treatments. While the percentage of extractions of permanent teeth due to dental caries had been gradually increased, in Juvenile detention facility students, throughout the transition period from middle school to high school, in dental hospital patients, the phenomenon of the same kind has hardly been detected. After that record analysis, oral examination for Juvenile detention facility students and dental hospital patients was conducted. DMFT index for dental hospital patients are 4.15, whereas, the value for Juvenile detention facility students are as twice as high to be 7.53.
Detention pond has an important role in peak flow reduction to mitigate flood damage. Design of detention pond is accomplished through the preliminary stage, and design stage in general. New development projects produce increased peak flow and flow amounts. In this case it is necessary to design the detention pond easily and simply. A simplified design method of the detention pond is suggested in this study. Used design variables are peak flow ratio(${\alpha}$) and storage ratio($S_r$). ${\alpha}$ is the peak flow ratio of before and after development of the basin. $S_r$ is a ratio of storage volume to total runoff volume. Applicability of the proposed method was also proved. The simple procedure of detention pond design is proposed in this study.
An experimental study is performed on reducing the pollutants supplied by storm water through enhancing efficiency of SS from the detention storage tank where CSOs are kept temporarily before discharge to the receiving water system. SS removal efficiency is investigated in accordance with various conditions of the detention pond-such as its length, the existence of training wall, and the use of gravel filling. The removal efficiency is strongly affected by the detention pond's length until the critical falling distance of the suspended solids is reached. For cases where the tank has a length longer than this critical condition, the removal rate shows less sensitivity. To enhance the SS removal efficiency of tanks of shorter than the critical length, we studied alternative types of tank in which inside training walls are installed. The results showed improvement of 14 to 37% in removal efficiency in 2hours detention(2 training walls). The important factor in achieving a high SS removal rate is ensuring the critical length of the detention pond, but for the cases where the basin length cannot be guaranteed, baffles or a gravel filling scheme may be introduced to attain considerable efficiency. The results of studying and comparing different storage tank conditions show that, in terms of elimination efficiency, a storage tank with gravel filling and training walls > a storage tank with gravel filling > a storage tank with training walls > an empty tank. The experimental results should contribute to development of related further research, by empirically verifying the already assumed importance of critical falling distance, training walls, and gravel filling schemes.
Kim, Seo-Jun;Hong, Sang-Jin;Yoon, Byung-Man;Ji, Un
Journal of Korea Water Resources Association
/
v.45
no.5
/
pp.495-503
/
2012
It is necessary to perform the precise analysis of unsteady flow for effective design of the side-weir detention basin installed in the river. Generally, the HEC-RAS program, which is a 1D unsteady numerical model, is mostly used to simulate the unsteady flow for rivers. However, it is difficult to have confidence of unsteady flow results simulated by HEC-RAS due to the lack of experimental data and field monitoring data for the channel with a side-weir detention basin. Therefore, the purpose of this study is to validate or verify the simulation results calculated by HEC-RAS through the experiments for the open channel with a side-weir detention basin using specially-designed unsteady discharge-supply system. The experimental cases included unsteady flows in the straight channel with and without a side-weir detention basin. Especially, for the case with a detention basin, the experiment was performed to consider only the free flow condition over the side-weir. The study results showed that values of water level and discharge obtained from HEC-RAS coincided reasonably with experimental results with the maximum error of 3% for water level and 1% for discharge in the case of the flow without the side-weir detention basin and 4% for water level and 2% for discharge with the side-weir detention basin.
Journal of the Korean Society of Hazard Mitigation
/
v.6
no.4
s.23
/
pp.37-47
/
2006
Urban development results in increased runoff volume and flowrates and shortening in time of concentration, which may cause frequent flooding downstream. Flow retardation structures to limit adverse downstream effects of urban storm runoff are used. There are various types of flow retardation measures include detention basins, retention basins, and infiltration basins. In basic planning phase, a number of planning models of detention ponds which decide storage volume by putting main variables were used to design detention ponds. The characteristics of hydrological parameters $\alpha,\;\gamma$ which are used in planning models of detention pond were analyzed. In this study, detention ponds data of Disaster Impact Assessment report at 22 sites were analyzed in order to investigate correlation between characteristic of urban drainage basin parameter and characteristics of detention pond parameter due to urbanization effects. The results showed that storage volume was influenced by peak discharge ratio $\alpha$ more than runoff coefficient ratio $\beta$ and peak discharge ratio $\alpha$ was influenced by runoff coefficient ratio $\beta$ less than regional parameter n. Storage ratio was mainly influenced by duration of design rainfall in the case of trapezoidal inflow hydrograph such as Donahue et al. method.
The flood prevention capacity of drainage facilities in urban areas has weakened because of the increase in impervious surface areas downtown owing to rapid urbanization as well as localized heavy rains caused by climate change. Detention can be installed in trunk sewers and linked to existing drainage facilities for the efficient drainage of runoff in various urban areas with increasing stormwater discharge and changing runoff patterns. In this study, the concept of detention in trunk sewers, which are storage facilities linked to existing sewer pipes, was applied. By selecting a virtual watershed with a different watershed shape, the relationship between the characteristic factors of detention in the trunk sewer and the design parameters was analyzed. The effect of reducing stormwater runoff according to the installation location and capacity of the reservoir was examined. The relationship between the installation location and the capacity of the detention trunk sewer in the Dowon district of the city of Yeosu, South Korea was verified. The effects of the existing water runoff reduction facility and the detention trunk sewer were also compared and analyzed. As a result of analyzing the effects of reducing internal inundation, it was found that the inundation area decreased by approximately 66.5% depending on the installation location of the detention trunk sewer. The detention trunk sewer proposed in this paper could effectively reduce internal inundation in urban areas.
In this study for the development of area due to the increasing of industry, population and spreading of urbanization is rapidly increasing but about seventy percent of our nation's areas consists of the mountainous districts. In such case, when those areas have the heavy rains break, they are washed away by a fast-flowing stream of a valley and overflowed. Thus it could result on human life and property damage and also the widespread of flood damage in the downstream area. To decrease those damage, the construction of flood control reservoir is necessary. This research was aim to construct the flood runoff models of a mountainous small district and to determine the probability rainfall by analyzing precipitation. The study also examined the effects of location and size of flood control reservoir on flood reduction. The result showed that the construction of detention basin was an effective way to ensure the safety of flood control and multiple detention basin had superior result for reducing amount of runoff in the down stream area than the single detention basin.
The purpose of this study is to develop an efficient model for the least cost design of multisite detention systems. The IDP (Incremental Dynamic Programming) model for optimal design is composed of two sub-models: hydrologic - hydraulic model and optimization model. The objective function of IDP is the sum of costs; acquisition cost of the land, construction cost of detention basin and pumping system. Model inputs include channel characteristics, hydrologic paramenters, design storm, and cost function. The model is applied to the Jung- Rang Cheon basin in Seoul, a watershed with detention basins in multiple branching channels. The application results show that the detention system can be designed reasonably for various conditions and the model can be applied to multi-site detention system design.
To solve the urban flood problems, it must get the enough channel conveyances and pumping capacities. It needs set up the detention system to control the flow over the channel capacity. Inspite of this detention system, the peak flow may increased by rainfall distribution and the delay of flow. This shows a design model of detention system which can consider the time problems from mutual connections of the detention storages and pumping flow using IDP(Incremental Dynamic Programming) method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.