• Title/Summary/Keyword: Detention

Search Result 303, Processing Time 0.027 seconds

A study on the determination of location of the detention pond in trunk sewer for reducing runoff amounts (우수유출저감을 위한 간선저류지 위치선정에 관한 연구)

  • Lee, Sung Ho;Yoon, Sei Eui;Lee, Jae Joon
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.4
    • /
    • pp.223-232
    • /
    • 2017
  • The ability to defend against floods in urban areas was weakened, because the increase in the impervious rate of urban areas due to urbanization and industrialization and the increase in the localized torrential rainfall due to abnormal climate. In order to reduce flood damage in urban areas, various runoff reduction facilities such as detention ponds and infiltration facilities were installed. However, in the case of domestic metropolitan cities, it is difficult to secure land for the installation of storm water reduction facilities and secure the budget for improving the aged pipelines. Therefore, it is necessary to design a storage system (called the detention pond in trunk sewer) that linked the existing drainage system to improve the flood control capacity of the urban area and reduce the budget. In this study, to analyze the effect of reducing runoff amounts according to the volume of the detention pond in trunk sewer, three kinds of virtual watershed (longitudinal, middle, concentration shape) were assumed and the detention pond in trunk sewer was installed at an arbitrary location in the watershed. The volume of the detention pond in trunk sewer was set to 6 cases ($1,000m^3$, $3,000m^3$, $5,000m^3$, $10,000m^3$, $20,000m^3$, $30,000m^3$), and the installation location of the detention pond in trunk sewer was varied to 20%, 40%, 60%, and 80% of the detention pond upstream area to the total watershed area (DUAR). Also, using the results of this study, a graph of the relationship and relational equation between the volume of the detention pond in trunk sewer and the installation location is presented.

Dental Treatments and Oral Health Status of Adolescent Girl Inmates in a Juvenile Detention Facility for the Last 5 Years (최근 5년간 소년원 여학생의 치과치료 및 구강건강실태)

  • Jeon, Yowon;Baek, Kwangwoo
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.43 no.4
    • /
    • pp.401-409
    • /
    • 2016
  • This research investigates into overall oral health status of adolescent girl inmates in a juvenile detention facility and ordinary school students in the same age range of 11 to 18 years old and compares the results focusing on the difference between the two groups. The last 5 years dental records for girl inmates in Juvenile detention facility and for students who have visited the Department of Pediatric Dentistry at Ajou University Hospital was colleted and analyzed. The restorative treatments took up the greatest part in their history of treatments. While the percentage of extractions of permanent teeth due to dental caries had been gradually increased, in Juvenile detention facility students, throughout the transition period from middle school to high school, in dental hospital patients, the phenomenon of the same kind has hardly been detected. After that record analysis, oral examination for Juvenile detention facility students and dental hospital patients was conducted. DMFT index for dental hospital patients are 4.15, whereas, the value for Juvenile detention facility students are as twice as high to be 7.53.

A Development of Simplified Design Method of the Detention Pond for the Reduction of Runoff (우수유출저감용 저류지의 간편설계기법 개발)

  • Lee, Jae-Joon;Kwak, Chang-Jae
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.7
    • /
    • pp.693-700
    • /
    • 2008
  • Detention pond has an important role in peak flow reduction to mitigate flood damage. Design of detention pond is accomplished through the preliminary stage, and design stage in general. New development projects produce increased peak flow and flow amounts. In this case it is necessary to design the detention pond easily and simply. A simplified design method of the detention pond is suggested in this study. Used design variables are peak flow ratio(${\alpha}$) and storage ratio($S_r$). ${\alpha}$ is the peak flow ratio of before and after development of the basin. $S_r$ is a ratio of storage volume to total runoff volume. Applicability of the proposed method was also proved. The simple procedure of detention pond design is proposed in this study.

SS Removal-rate Efficiency of Storm-water Detention Storage Tank Depending upon Length, Inside Training Wall and Gravel Filling (우수저류조의 형상과 도류벽 및 자갈채움에 따른 SS 제거효율)

  • Lee, Jong Tae;Seo, Hong Joon;Seo, Kyung A
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.5
    • /
    • pp.655-667
    • /
    • 2009
  • An experimental study is performed on reducing the pollutants supplied by storm water through enhancing efficiency of SS from the detention storage tank where CSOs are kept temporarily before discharge to the receiving water system. SS removal efficiency is investigated in accordance with various conditions of the detention pond-such as its length, the existence of training wall, and the use of gravel filling. The removal efficiency is strongly affected by the detention pond's length until the critical falling distance of the suspended solids is reached. For cases where the tank has a length longer than this critical condition, the removal rate shows less sensitivity. To enhance the SS removal efficiency of tanks of shorter than the critical length, we studied alternative types of tank in which inside training walls are installed. The results showed improvement of 14 to 37% in removal efficiency in 2hours detention(2 training walls). The important factor in achieving a high SS removal rate is ensuring the critical length of the detention pond, but for the cases where the basin length cannot be guaranteed, baffles or a gravel filling scheme may be introduced to attain considerable efficiency. The results of studying and comparing different storage tank conditions show that, in terms of elimination efficiency, a storage tank with gravel filling and training walls > a storage tank with gravel filling > a storage tank with training walls > an empty tank. The experimental results should contribute to development of related further research, by empirically verifying the already assumed importance of critical falling distance, training walls, and gravel filling schemes.

Feasibility Analysis of HEC-RAS for Unsteady Flow Simulation in the Stream Channel with a Side-Weir Detention Basin (강변저류지가 있는 하도에서의 부정류 흐름 모의를 위한 HEC-RAS의 적용성 검토)

  • Kim, Seo-Jun;Hong, Sang-Jin;Yoon, Byung-Man;Ji, Un
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.5
    • /
    • pp.495-503
    • /
    • 2012
  • It is necessary to perform the precise analysis of unsteady flow for effective design of the side-weir detention basin installed in the river. Generally, the HEC-RAS program, which is a 1D unsteady numerical model, is mostly used to simulate the unsteady flow for rivers. However, it is difficult to have confidence of unsteady flow results simulated by HEC-RAS due to the lack of experimental data and field monitoring data for the channel with a side-weir detention basin. Therefore, the purpose of this study is to validate or verify the simulation results calculated by HEC-RAS through the experiments for the open channel with a side-weir detention basin using specially-designed unsteady discharge-supply system. The experimental cases included unsteady flows in the straight channel with and without a side-weir detention basin. Especially, for the case with a detention basin, the experiment was performed to consider only the free flow condition over the side-weir. The study results showed that values of water level and discharge obtained from HEC-RAS coincided reasonably with experimental results with the maximum error of 3% for water level and 1% for discharge in the case of the flow without the side-weir detention basin and 4% for water level and 2% for discharge with the side-weir detention basin.

An Analysis of Characteristic Parameters for the Design of Detention Pond in Urbanized Area (도시유역에서 저류지 설계를 위한 특성인자 분석)

  • Lee, Jae-Joon;Kim, Ho-Nyun;Kwak, Chang-Jae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.4 s.23
    • /
    • pp.37-47
    • /
    • 2006
  • Urban development results in increased runoff volume and flowrates and shortening in time of concentration, which may cause frequent flooding downstream. Flow retardation structures to limit adverse downstream effects of urban storm runoff are used. There are various types of flow retardation measures include detention basins, retention basins, and infiltration basins. In basic planning phase, a number of planning models of detention ponds which decide storage volume by putting main variables were used to design detention ponds. The characteristics of hydrological parameters $\alpha,\;\gamma$ which are used in planning models of detention pond were analyzed. In this study, detention ponds data of Disaster Impact Assessment report at 22 sites were analyzed in order to investigate correlation between characteristic of urban drainage basin parameter and characteristics of detention pond parameter due to urbanization effects. The results showed that storage volume was influenced by peak discharge ratio $\alpha$ more than runoff coefficient ratio $\beta$ and peak discharge ratio $\alpha$ was influenced by runoff coefficient ratio $\beta$ less than regional parameter n. Storage ratio was mainly influenced by duration of design rainfall in the case of trapezoidal inflow hydrograph such as Donahue et al. method.

Analysis of Applicability of the Detention in Trunk Sewer for Reducing Urban Inundation (도시 내수침수 저감을 위한 간선저류지 적용성 분석)

  • Lee, Sung Ho;Kim, Jung Soo;Kim, Seo Jun
    • Ecology and Resilient Infrastructure
    • /
    • v.8 no.1
    • /
    • pp.44-53
    • /
    • 2021
  • The flood prevention capacity of drainage facilities in urban areas has weakened because of the increase in impervious surface areas downtown owing to rapid urbanization as well as localized heavy rains caused by climate change. Detention can be installed in trunk sewers and linked to existing drainage facilities for the efficient drainage of runoff in various urban areas with increasing stormwater discharge and changing runoff patterns. In this study, the concept of detention in trunk sewers, which are storage facilities linked to existing sewer pipes, was applied. By selecting a virtual watershed with a different watershed shape, the relationship between the characteristic factors of detention in the trunk sewer and the design parameters was analyzed. The effect of reducing stormwater runoff according to the installation location and capacity of the reservoir was examined. The relationship between the installation location and the capacity of the detention trunk sewer in the Dowon district of the city of Yeosu, South Korea was verified. The effects of the existing water runoff reduction facility and the detention trunk sewer were also compared and analyzed. As a result of analyzing the effects of reducing internal inundation, it was found that the inundation area decreased by approximately 66.5% depending on the installation location of the detention trunk sewer. The detention trunk sewer proposed in this paper could effectively reduce internal inundation in urban areas.

Study of a Process for Flood Detention Location and Storage Capacity (재해저류지 위치결정과 용량결정 과정에 관한 연구)

  • Oh, Gun-Heung;Park, Ki-Bum;Chang, In-Soo
    • Journal of Environmental Science International
    • /
    • v.17 no.6
    • /
    • pp.601-609
    • /
    • 2008
  • In this study for the development of area due to the increasing of industry, population and spreading of urbanization is rapidly increasing but about seventy percent of our nation's areas consists of the mountainous districts. In such case, when those areas have the heavy rains break, they are washed away by a fast-flowing stream of a valley and overflowed. Thus it could result on human life and property damage and also the widespread of flood damage in the downstream area. To decrease those damage, the construction of flood control reservoir is necessary. This research was aim to construct the flood runoff models of a mountainous small district and to determine the probability rainfall by analyzing precipitation. The study also examined the effects of location and size of flood control reservoir on flood reduction. The result showed that the construction of detention basin was an effective way to ensure the safety of flood control and multiple detention basin had superior result for reducing amount of runoff in the down stream area than the single detention basin.

Optimal Design of Datention System using Incremental Dynamic Programming (동적계획법을 이용한 유수체계의 최적설계)

  • 이길성;이범희
    • Water for future
    • /
    • v.28 no.1
    • /
    • pp.153-168
    • /
    • 1995
  • The purpose of this study is to develop an efficient model for the least cost design of multisite detention systems. The IDP (Incremental Dynamic Programming) model for optimal design is composed of two sub-models: hydrologic - hydraulic model and optimization model. The objective function of IDP is the sum of costs; acquisition cost of the land, construction cost of detention basin and pumping system. Model inputs include channel characteristics, hydrologic paramenters, design storm, and cost function. The model is applied to the Jung- Rang Cheon basin in Seoul, a watershed with detention basins in multiple branching channels. The application results show that the detention system can be designed reasonably for various conditions and the model can be applied to multi-site detention system design.

  • PDF

Detention System Design Model with consideration of the rainfall distribution and mutual connection (강우 분포 및 상호 관련성을 고려한 유수체계 설계 모형)

  • Lee, Beom-Hui
    • The Journal of Engineering Research
    • /
    • v.6 no.1
    • /
    • pp.75-81
    • /
    • 2004
  • To solve the urban flood problems, it must get the enough channel conveyances and pumping capacities. It needs set up the detention system to control the flow over the channel capacity. Inspite of this detention system, the peak flow may increased by rainfall distribution and the delay of flow. This shows a design model of detention system which can consider the time problems from mutual connections of the detention storages and pumping flow using IDP(Incremental Dynamic Programming) method.

  • PDF