Selection of Key Management Targets for Claim Causes through Relational Analysis on the Causes of Change Order Claims

  • Min, Kwang-Ho;Ko, Gun-Ho;Jin, Chengquan;Hyun, Chang-Taek;Han, Sang-Won
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.281-290
    • /
    • 2017
  • As various stakeholders are involved in construction projects, disputes between the parties are more likely to occur, which is a very important issue for the participants in the projects. Claims in construction projects, however, are very complex and thus difficult to manage. In particular, as the cause of a claim in the preceding stage that has not been resolved in a timely manner has an effect on the cause of a claim in the following stage, it is difficult to find a point of compromise regarding a claim caused by the relationship between the causes that occur in the preceding and following stages. In this regard, this study sought to examine the rules for the generation of change order claims, which occur most frequently among the construction claims, and thus to select the key management targets through the analysis of the relationship between the causes of claims arising in the preceding and following stages for the efficient management of claims. It is expected that the use of rules for the generation of change order claims as well as of representative and similar cases will help the construction practitioners in judging claims, considering the relationships among the causes of the claims. Meanwhile, in this study, association analysis was conducted regarding the causes of the occurrence of change order claims in a design-build delivery method, and therefore, it is necessary to verify the effectiveness of the method when applied to other delivery methods.

  • PDF

양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향 (A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement)

  • 박종순;신창준;유병기;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.5-12
    • /
    • 2008
  • 양산 부산대학교병원 건립공사는 종합병원 의료타운 신축 프로젝트이다. 계획단계부터 건설사업관리자(CMr)가 참가하여 설계 시공일괄사업자를 선정한 후, 실시설계 진행과정을 거쳐 시공단계, 시공이후단계에 이르기까지 프로젝트의 모든 단계에 건설사업관리(CM) 업무를 일관적으로 적용한 사례이다. 또한 설계와 시공의 추진에 Fast Track을 도입하여 공기단축에 성공한 것에 그 의미를 찾을 수 있다. 본 사례는 설계 이전단계에 설계시공일관업체를 선정하였으며, Fast Track수법의 적용을 염두에 둔 설계 및 공사일정계획, 설계단계의 설계관리, Fast Track에 입각한 단계별 공사발주 및 계약관리, 기본설계 실시설계단계의 VE 수행, 시공단계에서의 설계변경 관리, 시공 후 유지관리 단계의 운용관리 등 건설사업관리 업무가 모든 단계에서 다각적으로 제공되었다. 본 보고에서는 상기와 같은 건설사업관리 적용상의 과제와 개선방향, 특히 설계 시공일괄사업에서 효율적으로 CM 업무를 수행할 수 있는 방안을 제시하여, 초대형 턴키(Turnkey) 프로젝트의 CM적용에 기여하고자 한다.

  • PDF

BTL 사업주체별 문제분석과 해결방안에 관한 연구 (A Study For An Improved BTL Project Delivery Method)

  • 김창덕;박혜신;이민재;유정호
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.53-63
    • /
    • 2006
  • 2005년부터 장부는 국민경제 선순환과 국민 삶의 질 향상이라는 목표 하에, 높은 수준의 공공서비스를 조기 또는 적기에 제공하기 위한 방책의 일환으로 BTL 사업의 시행을 추진하고 있다. 그러나 시행 초기부터 낮은 사업수익률, 사업제안 비용의 부담, 제도적 구조적 사업 진입 장벽으로 인한 지방 중소규모 건설업체의 불만 등 많은 문제점을 나타내고 있어 성공적인 BTL 사업에 걸림돌이 되고 있다. 이에 정부는 지방 중소업체의 참여율을 시공 비율 규정으로 정하고 사업성이 떨어지는 적정 이하 규모 공사를 BTL사업에서 제외하는 등의 대책을 세웠으나 근본적이 해결책으로서는 미흡한 것으로 조사되고 있다. 본 연구에서는 BTL 사업 추진 중 개선되어야 할 사항들에 대해서 문헌조사 및 전문가와의 심층 면담조사 등을 통해 조사 및 분석하였다. 본 연구 결과 가장 근본적인 개선사항으로 BTL 사업 수행 주체의 구성 방식이 시공자 중심으로 되어있는 DBFO(Design, Build, Finance, and Operate) 방식에 있음을 확인하고, 이러한 사업 수행 주체의 구성 방식을 재무적 투자자가 건설사업 관리자의 전문지식을 최대한 활용할 수 있도록 하는 FCDO(Finance, Construction Management, Development and Operate) 방식으로의 전환을 개선방안으로 제시한다.

공공건설공사의 최적 입찰방식 선정모델 (A Selection Model of Suitable Tendering System for Public Construction Projects)

  • 유일한;김경래
    • 한국건설관리학회논문집
    • /
    • 제9권3호
    • /
    • pp.164-174
    • /
    • 2008
  • 사업특성을 고려한 발주방식의 선정은 해당 사업의 성공적 수행을 위한 중요한 의사결정이며, 발주방식 선정의 가장 핵심은 입찰방식의 결정이다. 국내 공공건설공사의 입찰방식을 보다 다양화하려는 취지에서 재정경제부는 2007년 10월 국가계약법시행령 개정을 통해 "기술제안입찰", "설계공모 기술제안입"을 새로이 도입하였다. 이에 본 연구는 다양한 입찰방식 중 사업특성에 적합한 대안을 선택하는 발주자의 의사결정을 위한 입찰방식 선정모델을 제시하였다. 국내외 선행연구 분석 및 면담조사를 통해 우선 모델의 framework을 구축하였으며, 다음으로 건축 및 토목 분야의 전문가 265인을 대상으로 수행한 설문조사 결과를 분석하여 입찰방식 선정기준의 상대적 가중치와 입찰방식 대안별 효용을 정량적인 평가기준으로 제시하였다. 마지막으로 발주예정인 3개의 공공건설공사에 대한 사례 적용을 통해 본 연구에서 개발한 모델의 실무 적용을 위한 구체적 방안을 제시하였다. 사례프로젝트에 모델을 적용한 결과, 입찰방식 선정기준의 선별 과정을 논리화하는 연구와 사업유형별로 표준 가중치 및 효용을 제시하는 후속적인 연구가 필요하다는 결론을 도출할 수 있었다.

색채를 통해 나타나는 도시이미지 사례 연구 (A Case Study on the Urban Image through Color)

  • 이진영;김영주
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2009년 춘계학술발표대회 논문집
    • /
    • pp.321-326
    • /
    • 2009
  • For building an urban image, various elements such as symbolic building, ethnic characteristics, historical background, natural environment, and diverse cultural elements can influence on it. Many cities in developed countries are showing their unique urban image reflecting their own culture, history, and aesthetic tastes. Especially color, one of the major design elements, has greater impact than other visual factors to form an urban characteristic. Despite the long history and cultural background, Seoul as a capital city of Korea does not show an unique city image with the perspective of color. Recently, Seoul has been designated as '2010 World Design Capital' and implements various urban design projects. As a leading city of design, Seoul is trying to make its urban identity through the own symbolic environment color. The purpose of this study is to find an environmental color scheme for developing a desirable urban design through several cases of foreign countries. For the purpose, Paris, London, Amsterdam, and Tokyo were selected as case cities. Each of the cities showed their own cultural characteristics and made their unique urban image by appropriate usage of their natural environment, symbolic building, emblem of country, and so on. We need to consider these successful cases to build up the image of Seoul.

  • PDF

건설공사보험 확대 당위성 및 예산소요 분석 연구 (An Analysis on Expanding Construction Insurance and Estimating Necessary Budget)

  • 김명수
    • 한국건설관리학회논문집
    • /
    • 제15권5호
    • /
    • pp.94-102
    • /
    • 2014
  • 본 연구에서는 건설공사보험 확대의 당위성을 분석하고 확대를 위한 예산소요를 추정하였다. 건설공사 손해배상보험은 국가계약법, 지방계약법 등 관련법규에서 의무화하고 있으며, 건설공사의 수행 중에 발생하는 예기치 못한 사고로 인한 사업목적물이나 재산상 손해의 배상을 위하여 가입하고 있다. 현재 200억 이상 PQ공사 및 대형공사만을 의무가입대상으로 공공발주자가 보험료를 지원하고 있다. 의무가입 대상 공사의 경우 발주자가 보험료를 부담하지만, 200억 미만 공공공사의 경우 업체가 자기부담으로 손해를 배상해야 하는 형평성문제가 발생한다. 비의무대상 공사라도 많은 경우가 자기비용으로 보험을 가입하고 있으며, 민간 공사의 경우도 건설공사보험 가입이 많은 것으로 나타난다. 건설공사보험을 가입하면 건설업체의 부족한 사고관리능력을 보험회사로부터 지원받아 안정적인 조업이 가능하게 된다. 따라서 중소업체에 대한 보호와 중소규모 공사의 조업안정성을 위해 200억 이상 공공공사에만 의무화 되어 있는 현재 규제를 개선하여 중소 규모 공사까지 가입 범위를 확대시킬 필요가 있다. 비의무가입 공사의 최근 3년 평균 비중은 46%이며, 보험사의 보험료율에 근거한 원가반영율은 0.2%로 산출된다. 여기에 공종별 위험도를 감안하면 비의무가입 공사의 원가반영율은 0.13%로 추정된다. 이에 따라 향후 200억 이하 공사에 대한 보험 가입을 위해 공공공사 발주가 35조원 규모라면 209억원, 40조원이라면 239억원의 예산이 추가로 필요할 것으로 추정된다.

Use of Output Specifications in PFI Housing Projects - How They Differ from Prescriptive Specifications

  • Lam, Patrick T.I.;Chan, Albert P.C.;Akintoye, Akintola;Javed, Arshad Ali
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.43-48
    • /
    • 2011
  • In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.

Spatial interpolation of geotechnical data: A case study for Multan City, Pakistan

  • Aziz, Mubashir;Khan, Tanveer A.;Ahmed, Tauqir
    • Geomechanics and Engineering
    • /
    • 제13권3호
    • /
    • pp.475-488
    • /
    • 2017
  • Geotechnical data contributes substantially to the cost of engineering projects due to increasing cost of site investigations. Existing information in the form of soil maps can save considerable time and expenses while deciding the scope and extent of site exploration for a proposed project site. This paper presents spatial interpolation of data obtained from soil investigation reports of different construction sites and development of soil maps for geotechnical characterization of Multan area using ArcGIS. The subsurface conditions of the study area have been examined in terms of soil type and standard penetration resistance. The Inverse Distance Weighting method in the Spatial Analyst extension of ArcMap10 has been employed to develop zonation maps at different depths of the study area. Each depth level has been interpolated as a surface to create zonation maps for soil type and standard penetration resistance. Correlations have been presented based on linear regression of standard penetration resistance values with depth for quick estimation of strength and stiffness of soil during preliminary planning and design stage of a proposed project in the study area. Such information helps engineers to use data derived from nearby sites or sites of similar subsoils subjected to similar geological process to build a preliminary ground model for a new site. Moreover, reliable information on geometry and engineering properties of underground layers would make projects safer and economical.

BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구 (Development of Construction Schedule Management System based on BIM)

  • 박소현;송정화;오건수
    • 대한건축학회논문집:구조계
    • /
    • 제34권3호
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Verification of the Effectiveness of Artificial Intelligence Education for Cultivating AI Literacy skills in Business major students

  • SoHyun PARK
    • 융합경영연구
    • /
    • 제11권6호
    • /
    • pp.1-8
    • /
    • 2023
  • Purpose: In the era of the Fourth Industrial Revolution, individuals equipped with fundamental understanding and practical skills in artificial intelligence (AI) are essential. This study aimed to validate the effectiveness of AI education for enhancing AI literacy among business major student. Research design, data and methodology: Data for analyzing the effectiveness of the AI Fundamental Education Program for business major students were collected through surveys conducted at the beginning and end of the semester. Structural equation modeling was employed to perform basic statistical analyses regarding gender, grade, and prior software (SW) education duration. To validate the effectiveness of AI education, seven variables - AI interest, AI perception, data analysis/utilization, AI projects, AI literacy, AI self-efficacy, and AI learning persistence - were defined and derived. Results: All seven operationally defined variables showed statistically significant positive changes. The average differences were observed as follows: 0.47 for AI interest, 0.32 for AI perception, 0.37 for data analysis/utilization, 0.27 for AI projects, 0.25 for AI literacy, 0.39 for AI self-efficacy, and 0.41 for AI learning persistence. Statistically, AI interest exhibited the most substantial average difference. Conclusions: Through this study, the applied AI education was confirmed to enhance learners' overall competencies in AI, proving its utility and effectiveness in AI literacy education for business major students. Future research endeavors should build upon these results, focusing on ongoing studies related to AI education programs tailored to learners from diverse academic backgrounds and conducting continuous efficacy evaluations.