• 제목/요약/키워드: Design for Assembly

검색결과 1,507건 처리시간 0.033초

경수로 핵연료 지지격자체 구조설계에 대한 소고 (Structural Design Considerations on the Spacer Grid Assembly of PWR Nuclear Fuel)

  • 송기남
    • 한국압력기기공학회 논문집
    • /
    • 제7권3호
    • /
    • pp.54-60
    • /
    • 2011
  • A spacer grid, which supports nuclear fuel rods laterally and vertically with a friction grip, is one of the most important structural components in a PWR fuel. The form of grid strap and supporting parts such as grid spring and dimple is known to be closely related with the mechanical/structural performance of spacer grid and nuclear fuel assembly. In this study, reviewing various research results for enhancing the performance of the spacer grid, some structural design considerations and research directions on the spacer grid assembly are suggested for further study.

Numerical simulation of localization of a sub-assembly with failed fuel pins in the prototype fast breeder reactor

  • Abhitab Bachchan;Puspendu Hazra;Nimala Sundaram;Subhadip Kirtan;Nakul Chaudhary;A. Riyas;K. Devan
    • Nuclear Engineering and Technology
    • /
    • 제55권10호
    • /
    • pp.3648-3658
    • /
    • 2023
  • The early localization of a fuel subassembly with a failed (wet rupture) fuel pin is very important in reactors to limit the associated radiological and operational consequences. This requires a fast and reliable system for failure detection and their localization in the core. In the Prototype Fast Breeder Reactor, the system specially designed for this purpose is Failed Fuel Location Modules (FFLM) housed in the control plug region. It identifies a failed sub-assembly by detecting the presence of delayed neutrons in the sodium from a failed sub-assembly. During the commissioning phase of PFBR, it is mandatory to demonstrate the FFLM effectiveness. The paper highlights the engineering and physics design aspects of FFLM and the integrated simulation towards its function demonstration with a source assembly containing a perforated metallic fuel pin. This test pin mimics a MOX pin of 1 cm2 of geometrical defect area. At 10% power and 20% sodium flow rate, the counts rate in the BCCs of FFLM system range from 75 cps to 145 cps depending upon the position of DN source assembly. The model developed for the counts simulation is applicable to both metal and MOX pins with proper values of k-factor and escape coefficient.

비선형 접촉문제 해석을 통한 얼음 디스펜서 덕트 캡 조립체의 밀봉성능 평가 및 개선방안 연구 (A Study on Evaluation and Improvement of Sealing Performance of Duct Cap Assembly for Ice Dispenser By Nonlinear Contact Problem Analysis)

  • 이부윤
    • 한국기계가공학회지
    • /
    • 제17권2호
    • /
    • pp.37-46
    • /
    • 2018
  • Present research is to evaluate and improve the sealing performance of the duct cap assembly for the ice dispensers through structural analysis. The nonlinear contact problems to check the sealing performance were analyzed using ANSYS software. The results of the analyses related to the sealing performance: the displacement distribution, the contact condition between the cap-silicon and the case, and the pressure distribution on the contact surface, were examined and discussed. Based on the results of the existing design of the duct cap assembly, two cases of the design modifications to improve the sealing performance were introduced. By examining the results of the two cases, a final design improvement plan was proposed and analyzed. It is shown that the sealing performance of the proposed final design is much more favorable than the existing design. The method of structural analysis and design improvement of the duct cap assembly presented in this paper will help improve the sealing performance of the ice dispenser duct caps.

폰 카메라 렌즈모듈의 Cluster Type 조립시스템 설계 (Design of Cluster Type Assembly System for Lens Module of Phone Camera)

  • 송준엽;이창우;정연욱;김영규
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.974-977
    • /
    • 2005
  • Automatic lens assembly system is used for automatically assembling the lens module of phone camera. In this paper, we are trying to develop the cluster type automatic lens assembly with standard tray for applying for assembly field directly. This paper proposes the principle of cluster type lens assembly system and the related assembly production line concept for optimal automatic lens production line.

  • PDF

셀형유연조립시스템에서의 네트웍형 셀배치 (Network-type Cell Layout in Cellular Flexible Assembly Systems)

  • 노인규;최형호
    • 산업경영시스템학회지
    • /
    • 제19권39호
    • /
    • pp.63-73
    • /
    • 1996
  • With the success of flexible manufacturing systems (FMSs), flexible assembly systems (FASs) have been developed to automate factories further. As in a cellular FMS, a cellular FAS is considered as the most flexible and feasible assembly system configuration Because of the differences between manufacturing and assembly operation, the logic of cell formation and cell layout between a FMS and a FAS is not the same. Since the time for assembly operation is usually relatively short, the transfer time is thus very crucial for the performance of assembly systems. Therefore in assembly systems it is important to reduce the transfer time by sequencing operations efficiently and arranging machines like the sequences. The network-type layout is not only feasible for the machine arrangement based on operation sequences, but it has also layout flexibility. Therefore it is a reasonable layout configuration for cellular FASs. This paper presents a method for the cell layout based on the network-type layout in a cellular FAS design.

  • PDF

커넥팅로드 강건 설계 방안 (Robust Design of Connecting Rod)

  • 한문식;양철호
    • 한국자동차공학회논문집
    • /
    • 제22권1호
    • /
    • pp.142-147
    • /
    • 2014
  • Finite element analysis along with DOE scheme has been performed to obtain robust design of connecting rod assembly. An analysis was conducted with five loading steps. Fatigue analysis was done using commercial software FEMFAT and fatigue safety factors at the interested regions such as shank area of small end and big end were calculated. 27 design cases using 3 factors with 3 levels are constructed by design of experiment. Each case is simulated to find the most influential factors. Response for this study, maximum Von-Mises stress, has been used to determine main factors of connecting rod assembly. Among the 3 factors, compression load affected the response greatly. However, bolt assembly load and width of shank flat area showed a little influence to the response. Interaction effects among factors considered did not occur. Connecting rod assembly considered in this study showed its sensitivity to the noise factor such as compression load rather than design factor such as width of flat shank area.

화력발전소 통풍설비의 Main Bearing Assembly 설계 및 해석 (Design and Analysis of Main Bearing Assembly for Thermal Power Plant's Ventilation Equipment)

  • 류형룡;조인호;김성관;전성일;편영식
    • 대한기계학회논문집 C: 기술과 교육
    • /
    • 제1권1호
    • /
    • pp.129-138
    • /
    • 2013
  • 화력발전소의 보일러를 일정한 화력으로 가동하기 위해서는 일정한 통풍량을 유지시켜야 한다. Main Bearing Assembly Unit 일정한 통풍량을 유지시키기 위하여 Fan을 회전시킨다. 그러나 점차 발전량이 많아지는 반면에 발전을 위하여 투입되는 석탄의 질은 초기의 보일러 설계 기준보다 나빠지고 있다. 특히 원가절감의 일환으로 또는 자원의 고갈로 인한 고급품질의 석탄 확보가 어려움으로 인하여 점차 낮은 질의 석탄이 투입되고 있다. 이로 인하여 초기 설계시의 Main Bearing Assembly의 수명보다 약 절반의 수명인 2~3년의 주기로 Main Bearing Assembly의 정비교체가 요구되고 있다. 본 연구에서는 Main Bearing Assembly Unit의 역설계 해석을 통해서 수명단축의 원인을 분석하고 초기 목표 수명을 가질 수 있도록 새로운 시스템으로 개선하여 개발하고자 한다.

분해도 및 조립형상 정보를 이용한 작업시간 산정에 관한 연구 (Automatic Work Time Evaluation Based on a Verification of Disassemblability and Assembly Configuration)

  • 신철균
    • 대한산업공학회지
    • /
    • 제33권3호
    • /
    • pp.355-363
    • /
    • 2007
  • This paper presents a method of an automatic work time evaluation based on the verification of a disassemblability and assembly configuration. Even though a work time evaluation is an important field of concern for planning assembly lay-out, there are some limitations using cumbersome user query or approximated work time data without considering assembly condition. To overcome such restriction, this paper presents a method to mathematically verify assembly conditions based on the disassemblability, which is defined by the separability and stability cost. The separability cost represents a facility of the part disassembly operation, and the stability cost which represents a degree of the stability for the base assembly motion. Based upon the results, we propose a new approach of evaluating work time using neural networks. The proposed method provides an effective means of solving the work time evaluation problem and gives a design guidance of planning assembly lay-out in flexible manufacturing application. Example study is given to illustrate the concepts and procedure of the proposed schemes.