• 제목/요약/키워드: Design Project Planning

검색결과 588건 처리시간 0.025초

복합행정타운 내 보건소의 공간구성요소와 면적구성에 관한 건축계획적 연구 - 서울특별시 사례를 중심으로 - (A Study on the Architectural Planning of Spatial Organization Elements & Aerial Composition of Public Health Center within Governments Complexes Town - Focused on case studies in Seoul Metropolis -)

  • 변용진;박재승
    • 한국실내디자인학회논문집
    • /
    • 제19권3호
    • /
    • pp.224-233
    • /
    • 2010
  • As urban function has become diversified and complicated, multifunctional complex facilities to satisfy new functional desires are necessary. Since local autonomy started, many facilities previously run and managed by central administrative agencies are now under management of localities, and functionally, the necessity for governments complexes town to satisfy diverse taste of populace such as creating local community becomes imminent. Analyzing characteristics by space composition factor of the public health center, newly built as part of such governments complexes town and understanding required area of each part, this project is to be used as basic material for construction plan of public health center that is equipped with local characters while devising construction of the public health center in the governments complexes town. Research method is to analyze four public health center facilities located in governments complexes town sites built after 2007, among twenty five public health centers in Seoul, by spatial functions. Also, based on statistical documents of usage of public health center facilities, research over spatial compositional factors and area composition has been conducted. As a result, connectivity between local government building located inside the governments complexes town and public health center and that of spatial composition factor by part, area ratio by part and floor type of public health center are comprehended. Connectivity type of public health centers are divided into horizontal and vertical connectivity and it is found that spatial composition of public health center is compartmentalized into low level, mid level and high level, to make access by users easier. Level type is decided as radial, rotational and combined by hallway connecting facilities.

방사성폐기물 안전관리 데이터베이스 기본설계 (Database Basic Design for Safe Management Radioactive Waste)

  • 손동찬;안경일;정덕진;조용백
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2003년도 가을 학술논문집
    • /
    • pp.470-483
    • /
    • 2003
  • 국내 방사성폐기물의 발생$\cdot$누적량이 증가되고 결과적으로 관리해야 할 정보의 수량 또한 일부 기관에서는 방사성폐기물 안전관리 관련 업무의 전산화가 추진하고 있거나 추진할 예정이다. 방사성폐기물 안전관리 관련 정보는 국가 방사성폐기물 관리사업과 연계되어 활용되어야 함을 고려할 때, 국가 차원의 통합적인 방사성폐기물 안전관리 데이터베이스의 구축을 위한 데이터 형식 및 프로토콜 (Protocol)의 표준화가 요구된다. 원자력안전기술원(KINS)에서는 방대한 종류 및 수량의 국내 방사성폐기물 안전관리 관련 정보를 효율적으로 관리하기 위하여, 최신 정보통신 기술 (IT)을 적용한 국가 차원의 종합적인 데이터베이스 (DB)를 구축 운용하고자 한다. 국내 방사성폐기물 안전관리 통합정보시스템의 구축을 통하여 발생$\cdot$저장중인 폐기물의 이력을 체계적으로 추적$\cdot$관리할 수 있을 뿐만 아니라 기간별/기관별 발생추이 분석 및 향후 발생$\cdot$누적 예상량에 대한 신뢰도 있는 추이분석 결과를 생산함으로써, 정부의 국가 방사성폐기물 관리정책 수립 및 관련 산업계의 사업 계획단계에 필수정보를 제공할 수 있다. 이에 본 논문은 정보제공의 주요 요소인 데이터베이스 설계 내용을 소개한다.

  • PDF

토목시설물에 대한 BIM기반 공사관리 기법 연구 (A Study on the Construction Management Method based on BIM for Civil Engineering Project)

  • 김성훈;이상호;남상혁;선오영
    • 한국전산구조공학회논문집
    • /
    • 제24권4호
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling)은 원칙적으로 건설 전 생애주기에 걸쳐 활용되어야 그 효과를 극대화 할 수 있으나, 아직은 계획 및 설계단계에 비하여 공사단계에서는 그 활용도가 상당히 낮은 수준이었다. 최근 대형 국책사업이 발주, 시공되면서 효율적인 공사관리를 위한 방법으로 3D 성과품 검토나 4D 공정관리 등 BIM기법 중 일부가 도입되고 있다. 본 연구에서는 토목시설물의 공사단계에서 BIM 활용방안에 대하여 제시하였다. 토목공사의 종류별, 관리 분야별 BIM 활용방안에 대하여 논의하고, 서울 지하철 919공구에 실제로 적용하여 그 효용성에 대하여 분석하였다. 특히, 현장에 구축된 BIM 기반의 웹 공사관리 시스템은 공사중, 현장과 본사를 비롯해 발주처와 감리단 등 다수의 공사 주체들이 BIM을 보다 효과적으로 사용하도록 함으로써, BIM의 공사단계 활용성을 높일 뿐만 아니라 유지관리 단계까지 확장하여 이용될 수 있다.

농어촌 보건소의 기능별 공간구성 및 면적배분에 관한 연구 (A Study on the Functional Space Configuration and Area Distribution of Rural Public Health Center)

  • 조희영;윤소희;김석태
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제22권1호
    • /
    • pp.51-61
    • /
    • 2016
  • Purpose: To improve and establish functions for public health centers in rural public, an analysis will be done on arrangement plan and area by function for public health centers in farming and fishing villages. After finding out this relationship and architectural characteristics, spatial organization and area ratio for providing efficient medical service and the relationship between the two will be examined. Methods: 8 of them were selected and site visit and interview with the person in charge were conducted to investigate the current status. The drawings collected for analysis were input as CAD data and schematized. The relationship between the arrangement type and area for the public health centers in farming and fishing villages was analyzed and based on this, an analysis was done on agricultural scale and characteristics, and putting these analyzed results together, an appropriate method of improvement was proposed for spatial organization by function for public health centers in farming and fishing villages and to provide efficient service. Results: Firstly, the Plan types found in the public health centers in farming and fishing villages could be classified into three including single-type, multiple-type and radial-type. Secondly, according to an analysis of areas by function, in the case of treatment function, there was a difference in the area ration for selective treatment. This ratio is considered to be greatly influenced by the project each public health center focuses on. Thirdly, I could become aware of the relationship between spatial organization and area ratio based on the analysis of arrangement and area derived above. Implication: As the data to refer to in future research on spatial organization for public health centers, if the object of analysis becomes more expanded and investigated, it will be utilized in detail for spatial planning of public health centers, thereby being expected to contribute to more efficient and qualitatively enhanced medical service provided by public health centers.

정부의 시각예술 지원정책 (Government Visual Arts Support Policy)

  • 현영란
    • 커뮤니케이션디자인학연구
    • /
    • 제60권
    • /
    • pp.402-412
    • /
    • 2017
  • 1990년대 이후 정부역할은 거버넌스로 이행되었다. 거버넌스는 네트워크를 통한 정부와 민간기구의 협력체계를 강조한다. 정부의 시각예술지원 정책은 문화부를 중심으로 한국문화예술위원회, 지역문화재단과의 협력체계를 통해 다각적으로 이루어졌다. 1990년대 정부의 시각예술 지원은 이전보다 전시지원 건수가 많아졌으며, 2000년대 시각예술지원의 특성은 장르별 지원체계에서 장르를 통합 방식으로 변화하였다. 창작역량을 강화하기 위한 창작지원, 신진미술가들, 다원예술지원, 융복합지원사업이 증가하였고 작품제작비를 지원해 주는 방식이 늘어났다. 2010년 이후에는 장르별 통합한 '시각예술'사업지원이 시행되었으며, 2013년 협업을 통한 융복합 공동기획 프로젝트로 지원이 이루어졌다. 또한 해외레지던스프로그램 국제교류를 통해 보다 많은 전시지원이 활발하게 이루어졌다. 2005년 이후 독일뿐만 아니라 인도, 이란, 아시아 국가와의 협력으로 확대되었다. 지방정부의 비엔날레지원 외에도, 지역문화재단을 통한 창작공간지원과 지역협력형사업이 진행되고 있다.

Tunnel wall convergence prediction using optimized LSTM deep neural network

  • Arsalan, Mahmoodzadeh;Mohammadreza, Taghizadeh;Adil Hussein, Mohammed;Hawkar Hashim, Ibrahim;Hanan, Samadi;Mokhtar, Mohammadi;Shima, Rashidi
    • Geomechanics and Engineering
    • /
    • 제31권6호
    • /
    • pp.545-556
    • /
    • 2022
  • Evaluation and optimization of tunnel wall convergence (TWC) plays a vital role in preventing potential problems during tunnel construction and utilization stage. When convergence occurs at a high rate, it can lead to significant problems such as reducing the advance rate and safety, which in turn increases operating costs. In order to design an effective solution, it is important to accurately predict the degree of TWC; this can reduce the level of concern and have a positive effect on the design. With the development of soft computing methods, the use of deep learning algorithms and neural networks in tunnel construction has expanded in recent years. The current study aims to employ the long-short-term memory (LSTM) deep neural network predictor model to predict the TWC, based on 550 data points of observed parameters developed by collecting required data from different tunnelling projects. Among the data collected during the pre-construction and construction phases of the project, 80% is randomly used to train the model and the rest is used to test the model. Several loss functions including root mean square error (RMSE) and coefficient of determination (R2) were used to assess the performance and precision of the applied method. The results of the proposed models indicate an acceptable and reliable accuracy. In fact, the results show that the predicted values are in good agreement with the observed actual data. The proposed model can be considered for use in similar ground and tunneling conditions. It is important to note that this work has the potential to reduce the tunneling uncertainties significantly and make deep learning a valuable tool for planning tunnels.

공공부문 IT프로젝트 발주시스템 선진화에 관한 연구 - SW분할발주 제도를 중심으로- (A Study on the Advancement of IT project Order System in Public sector - Focused on the SW partitioning order institution -)

  • 이명희;이재두
    • 한국정보처리학회:학술대회논문집
    • /
    • 한국정보처리학회 2017년도 춘계학술발표대회
    • /
    • pp.595-597
    • /
    • 2017
  • 세계 SW시장은 급성장하고 있지만, 국내시장이 글로벌 강국에 영향을 주기에는 많이 부족하다. 인터넷 속도 1위국임에도 SW성장이 더딘 이유는 무엇일까? 그것은 국내 SW산업발전의 기반이 마련되지 않았기 때문이다. 이로써 정부는 SW중심사회를 선언하여 각 분야의 정책을 준비하였는데 공공부문 SW분할발주 제도를 IT프로젝트에 적용하려는 움직임이 있어 전체 SW산업의 약 30%를 차지하는 공공부문을 중심으로 SW분할발주 제도 시행시 예상되는 SI프로젝트 문제점 및 개선방안을 연구하고자 한다. SW분할발주 제도는 기획~설계와 개발~구현 단계로 구분됨에 따라 SI프로젝트에 적용함에 있어 문제가 발생될 수 있다. 그러므로 프로젝트와 분리 분할발주, 선진사례 및 분할발주 유관산업 프로젝트 사례를 분석하였으며 제도적, 기술적, 관리적 관점에서 개선방안을 도출하였다. 본 논문은 IT프로젝트에 종사하는 이들의 SW제값받기 및 환경개선을 기대하고 SW분할발주의 제도 시행 전 공급자와 수요자가 인식해야 하는 문제점에 대한 해결방안을 제공하여 SW산업과 SI프로젝트의 경쟁력을 강화하는 체계 형성의 방향을 제시한다.

사례기반추론 기법을 이용한 교량 공사비 추론 모형 구축 (Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method)

  • 김민지;문현석;강인석
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.42-52
    • /
    • 2013
  • 본 연구는 기존의 선형적인 공사비 예측방법의 한계를 극복하고 사례기반추론 (Case Based Reasoning, CBR)기법을 통해 기획단계의 실적정보를 활용하여 신뢰도 높은 공사비 예측 모델을 제시하는 것이 목적이다. 이를 위하여 사례기반추론 기법과 유전자알고리즘 (Genetic Algorithm, GA)의 선택연산을 복합적으로 활용한 스프레드시트 기반의 교량공사비 추론모델을 제시하였다. 추론모델의 검증을 위하여 국내 교량공사 시공사례 4건을 적용하였으며, 적용 결과 평균 8.69%의 오차율로 나타나 교량공사비의 예측 정확도가 타 분석방법과 비교하여 상대적으로 높은 것으로 파악하였다. 연구에서 제시된 교량공사비 예측모델은 초기 설계단계에서 상세제원에 대한 정보를 획득할 수 없을 경우에, 교량의 대표적 제원정보 만으로 공사비 선택범위를 최소화된 오차율로 예측할 수 있으므로, 개선된 보정 방법으로서 교량공사의 합리적인 개략공사비 산정에 활용될 수 있을 것으로 판단된다.

울산시 태화강 수변 경관 변천에 관한 연구 (Study on the Changes in Riverfront Landscape of Taehwa River, Ulsan City)

  • 정민기;한삼건
    • 대한건축학회논문집:계획계
    • /
    • 제34권8호
    • /
    • pp.117-128
    • /
    • 2018
  • The central of Ulsan was formed and has been developed in alluvial plains the Riverfront of Taehwa River and Dongcheon River Fortresses including Gyebyeonseong of the late Silla, Chisoseong of the Goryeo, Ulsan Gyeonsangjwabyeongyeongseong, Ulsaneupseong, Ulsanwaeseong and Yeompoyeongseong as well as Gugangseowon and Old Ulsanhyanggyo and other facilities well display such fact. In the southern areas of Taehwa River, Byeokpajeong of Samsan, Buddhist temples and pavilion architectures used to be located. In its upstream areas, Eonyangeupseong, Eonyanghyanggo, Banguseowon and Daegokcheon Petroglyph exist as well. As such, the Riverfront of Taehwa River are a central space where the civilization of Ulsan has grown and developed, and are regarded as a core scenic asset of Ulsan. However, the look and nature of Taehwa River changed significantly due to Ulsan irrigation project and the construction of modern bridges such as Ulsangyo and Ulsan railway bridge during the period of Japanese occupation. The old look of the area started to be ruined by water contaminations and developments of waterfront lands that resulted from the development of Ulsan Industrial Center in 1962. The water quality of Taehwa River has been improved as a result of allotting a huge budget and administrative powers before and after 1997, the year when Ulsan was elevated to a metropolitan city. However, the surrounding views around Taehwa River changed greatly due to various urban development projects including apartment complex constructions. This is because the development of the Riverfront started from a land utilization project, in which the construction of apartment complexes was included in the initial phase; as a result, the areas were changed to be private scenic assets for those apartments. Aware of such issue, this study aims to identify major scenic elements that were present in the period before such developments in the river's surrounding areas from literature and geography materials; and to reveal how various urban development projects that have been performed from the period of Japanese occupation have changed the scenic elements of Riverfront of Taehwa River. The purpose of this study is to identify qualitative and quantitative changes in scenic elements of the Riverfront of Taehwa River as well as the characteristics of the resulting changes in the surrounding scenery.

대표물량 기반의 도로공사 설계단계의 개략공사비 예측모델 (Quantity-based Early Cost Estimation Model for Road Construction Projects)

  • 김두연;김병일;여동훈;한승헌
    • 대한토목학회논문집
    • /
    • 제29권3D호
    • /
    • pp.373-379
    • /
    • 2009
  • 건설 프로젝트에 있어 공사비 산정은 예산편성, 대안검토, 입찰, 공사수행 등의 각 단계에 따른 의사결정 과정의 주요한 근거가 된다. 이에 따라 사업 초기 단계에서 보다 정확한 사업비를 산정하기 위하여 다양한 방법들이 적용되어 왔으며, 여러 연구를 통해 각 단계의 특성에 적합한 예측 방법론이 필요하다는 문제인식이 이루어져 왔다. 도로공사의 경우, 특히 타당성 조사 및 설계 초기단계에서 기준의 부재 등으로 정확한 사업비 산정에 어려움이 있는 것으로 분석되었다. 본 연구는 이러한 노선결정 이전까지의 단계를 대상으로 설계 초기단계에 적합한 대표공종의 물량 예측에 기반한 공사비 산정체계를 제시하였다. 이를 위하여 87건의 실시 설계 데이터를 분석하여 대표공종을 도출하고, 전체를 토공, 배수공, 포장공, 기타공종으로 구분하여 각 공종별 특성에 기반한 예측모델을 제시하였다. 도출된 공사비 산정모델의 검증을 위하여 9건의 추가 데이터의 공사비 예측결과를 실시 설계 공사비와 비교하여 평균 8% 수준의 오차율을 얻었다. 현행 단위길이당 공사비 기준을 적용한 산정결과와 비교할 때, 본 연구모델의 활용을 통해 설계단계 개략공사비 산정업무의 정확성 및 신뢰성을 향상시킬 수 있는 결과를 제시하였다고 할 수 있다.