• 제목/요약/키워드: Design Project Planning

검색결과 591건 처리시간 0.032초

루이스 칸의 병원건축에 나타난 일반적인 특성에 관한 연구 - 시대적 문맥적 비교와 함께 - (A study on the general characteristics of Kahn's healthcare buildings - with the comparative study from historical and contextual standpoints -)

  • 임영환;김지환
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제15권4호
    • /
    • pp.13-21
    • /
    • 2009
  • Healthcare design is always challenged to come up with the rapid changes in healthcare system and industry as well as complicated planning requirements. This thesis aims to grab good instructions from Louis I Kahn who designed more than 15 healthcare projects during his entire life, from the winning project of the student competition in 1920 to Ayub hospital in Dhaka, Bangladesh after his death. His many hospital projects are deeply related to his famous projects such as Yale Art gallery, Philips Exeter Library, and Sher-E-Bangla Nagar national capital of assembly hall. But, it is not easy to find the researches about his hospital projects among many books and theses about him. Thus, this thesis investigates them and their contextual and historical relationships in order to find the way to apply his knowledge and philosophy about healthcare design to the modern hospital projects. We expect that it will promote more following researches for his healthcare projects.

  • PDF

Ultimate bearing capacity of conical shell foundations

  • Colmenares, J.E.;Kang, So-Ra;Shin, Young-Jin;Shin, Jong-Ho
    • Structural Engineering and Mechanics
    • /
    • 제52권3호
    • /
    • pp.507-523
    • /
    • 2014
  • Shell foundations have been employed as an alternative for the conventional flat shallow foundations and have proven to provide economical advantage. They have shown considerably improved performance in terms of ultimate capacity and settlement characteristics. However, despite conical shell foundations are frequently used in industry, the theoretical solutions for bearing capacity of these footings are available for only triangular shell strip foundations. The benefits in design aspects can be achieved through theoretical solutions considering shell geometry. The engineering behavior of a conical shell foundation on mixed soils was investigated experimentally and theoretically in this study. The failure mechanism was obtained by conducting laboratory model tests. Based on that, the theoretical solution of bearing capacity was developed and validated with experimental results, in terms of the internal angle of the cone. In comparison to the circular flat foundation, the results show 15% increase of ultimate load and 51% decrease of settlement at an angle of intersection of $120^{\circ}$. Based on the results, the design chart of modified bearing capacity coefficients for conical shell foundation is proposed.

Comparing the Operation Cost of Washington Safety Rest Areas with Other States Using Performance-Based Method

  • Shrestha, Kishor;Berg, Alix;Tafazzoli, Mohammadsoroush;Kisi, Krishna
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.640-648
    • /
    • 2022
  • In the United States, the Safety Rest Areas (SRAs) were introduced as highway roadside infrastructures in the early 1900s. The State Departments of Transportation (DOTs) operate/maintain their SRAs using different methods. The Washington DOT used the in-house workforce method for over 20 years, whereas some states moved to Performance-Based Contracting (PBC) from the in-house workforce to save cost primarily. Several existing studies claimed that using the PBC approach saved costs on several highway assets. Thus, the principal objective of this study is to compute and compare the unit operating/maintenance cost of SRAs using the in-house workforce method (in Washington state) with the PBC approach (in other states). The findings of this study show that the average annual cost using the PBC approach was much more than the average annual cost using the in-house workforce approach. The findings also show that in Washington state, the 'Labor Cost' category was a key expenditure, which is statistically higher than other categories. The 'Labor Cost' was followed by the 'Other Services', and then 'Materials and Supplies' and 'Equipment.' The study's findings indicated that outsourcing does not always save costs for agencies. The study findings may help transportation construction/maintenance professionals select a cost-effective approach for their future planning.

  • PDF

산업항만지역의 재생을 통한 워터프론트 문화도시 통합계획 (Integrated Waterfront Cultural Planning through Regeneration of Former Industrial Harborfront)

  • 이금진
    • 한국재난정보학회 논문집
    • /
    • 제15권2호
    • /
    • pp.175-185
    • /
    • 2019
  • 연구목적: 본 연구에서는 산업항구도시의 재도약을 위한 도시경제기능과 다양한 도시활동을 추구하기 위한 지역역사 기반의 생활문화공간 조성 측면에서 항구도시의 특성을 살린 워터프론트 통합계획방안을 제안하고자 한다. 연구방법: 요코하마의 성장과정과 개발배경을 살펴보고 MM21의 개발정책 및 전략 체계를 기초로 하여 MM21의 워터프론트 및 역사문화공간 계획특성을 분석한다. 연구결과: MM21은 도쿄의 확장으로 위성도시의 위기에 처한 요코하마가 추진한 6대 사업 중 핵심이 되는 공공프로젝트로, 도시자립성 강화, 항만기능의 질적 전환, 수도권의 업무기능 분담을 목표로 하여 항구도시, 창조문화도시, 녹색수변도시, 정보도시 건설을 위해 워터프론트 통합도시개발을 계획하였다. 결론: MM21 분석을 통해 도출된 항구도시의 특성을 살린 워터프론트 문화도시 계획방안은 워터프론트 중심의 토지이용계획과 내륙지역과의 통합계획, 항구도시로 성장한 도시조직을 최대한 보존하고 워터프론트 도시로 전환할 수 있는 구역계획 구축, 조망점을 통해 바다와 항만을 향한 도시경관 제공, 항만과 바다를 향한 워터프론트 오픈스페이스와 에스플라나드 경관조성, 역사적 건축물과 문화자산 보존 및 문화예술공간으로 재활용, 공공문화예술과 보행네트워크를 연계한 워터프론트 공간계획 등이다.

New business opportunity: Green field project with new technology

  • Lee, Seung Jae;Woo, Jong Hun;Shin, Jong Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제6권2호
    • /
    • pp.471-483
    • /
    • 2014
  • Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation technology.

STEEL BOX 교량 상부구조의 BIM기반 설계 (BIM based Design of Steel Box Girder)

  • 이진경;이헌민;유재명;신현목
    • 한국BIM학회 논문집
    • /
    • 제1권2호
    • /
    • pp.6-11
    • /
    • 2011
  • 국내 토목분야의 건설 산업은 비효율적인 의사소통으로 인하여 업무전환단계에서의 정보 누락 및 그로 인한 비용손실 등의 문제점이 발생한다. 이러한 문제점에 대한 해결책으로 BIM의 도입이 대두되고 있다. BIM은 구조물의 생애주기 전 단계에서 발생되는 모든 정보들을 3차원 파라메트릭 CAD와 연계된 3차원 정보모델을 통하여 관리하여 정보 활용의 효율성을 극대화 시킨다. 본 논문에서는 BIM기반의 교량 건설 프로젝트의 구조설계업무에서 사용할 목적으로 3차원 정보모델을 활용한 교량의 구조설계 프로세스를 제안하였다. 제안된 프로세스는 구조설계업무를 통하여 결정되는 정보들을 활용하여 3차원 정보 모델링작업이 이루어질 수 있도록 구성하였다. 또한 제시된 프로세스를 활용하여 현재 건설이 진행 중인 스틸박스 교량의 상부구조를 대상으로 구조설계의 최종 산출물인 구조계산서를 구축된 BIM기반의 구조설계 프로세스를 활용하여 도출할 수 있도록 구성하였다.

지형정보시스템기법을 이용한 친환경적 골프코스 설계 (Application of Geographical Information System on Golf Course Design for Reduction of Environmental Impacts)

  • 주영규;이활희;이무춘
    • 아시안잔디학회지
    • /
    • 제20권1호
    • /
    • pp.93-105
    • /
    • 2006
  • 최근 많은 수의 골프장 건설로 인하여 국토의 상당면적이 원지형의 변화 또는 파괴되고 있으며 주변 생태계가 급속한 변이를 겪고 있다. 골프코스 건설을 위해서는 정밀하고 효율적인 설계를 요하지만 기존의 통상적 설계방식으로는 사업의 방대성으로 인한 설계자료의 처리에 한계를 가지고 있었다. 특히 공사 후의 경관 변화에 대한 예측이나 환경영향 저감대책에 대하여 적절한 대안을 제시할 적절한 수단이 없었다. 따라서 이러한 문제점을 해결하기 위하여 지형정보시스템(GIS)을 골프코스 설계에 적용하여 건설에 따른 물리적 영향을 최소화시킬 수 있는 친환경적인 골프코스 설계 기법개발에 대하여 연구하였다. 연구된 내용은 지형정보시스템을 기초자료입력 단계에서부터 최종 성과물 단계까지 적용시켜 전 설계과정을 전산화하며, 부수적으로 골프 경기의 기능적 효과 증대 토지이용의 적정성, 코스유지 관리의 용이성 등을 사전 검토할 수 있는 친환경적 전산설계기법을 개발 연구하였다.

네트워크 분석적 의사결정방법(ANP)을 이용한 서울시 한강르네상스 정책의 전략적 관리방안 (Strategic Management of the Policy for Seoul City's Hangang Renaissance)

  • 조세환;정광섭;김상원;원제무
    • 한국조경학회지
    • /
    • 제39권1호
    • /
    • pp.1-10
    • /
    • 2011
  • 본 연구는 서울시 한강르네상스 정책이 나가야 할 방향과 전략적 관리 방안을 모색하고자 하는 목적으로 수행하였다. 연구방법으로는 첫째, 정책단계별 수준선정을, 둘째, 수준별 중요도를 측정하고, 셋째, 이상의 결과를 네트워크 분석적 의사결정모형을 통해 분석하였다. 연구결과, 한강 르네상스 개발계획의 기조인 회복, 창조의 중요도는 큰 차이를 보이지 않았고, 제2단계 정책수준에서는 도시공간 재편, 자연성 회복, 이용성 증진 순으로 정책의 중요성을 인지하고 있는 것으로 나타났다. 제3단계 정책수준에서는 테마가 있는 한강공원 조성, 한강 중심의 도시공간구조 개편, 한강 중심의 Eco-Network 구축 등의 순서로 중요도를 보였다. 특히, 제3수준의 세부계획인 4정책수준의 중요도는 도시공간재편의 경우 수변도시의 유형별 개발 및 토지이용 다양화, 워터프런트 타운 조성의 경우 수변공간을 공공 및 복합용도로 활용, 그리고 한강변 경관개선의 경우 건축물의 종합적인 관리방안 수립, 테마가 있는 한강공원 조성은 통합디자인 계획 등이 주요 정책지표로 부각되었다. 중요도 분석결과를 통해 향후 한강르네상스 프로젝트의 전략적 정책 방향은 통합디자인 계획을 통한 테마가 있는 한강공원 조성과 함께 도시공간구조를 재편하는 정책을 선도적으로 추진하면서 다른 정책계획들과 연계성을 확보해 나가야 할 것으로 사료된다.

단위세대의 개방형 평면구성이 아파트가격에 미치는 영향 (Effect of Open Floor Plan Design Property on Apartment Price)

  • 배상영;이상엽
    • 부동산연구
    • /
    • 제27권1호
    • /
    • pp.17-32
    • /
    • 2017
  • 주거공간의 개방성은 채광, 조망, 환기에 직접적인 영향을 끼치는 특성으로, 단위세대의 개방성 확보를 위해 아파트의 평면유형이 다양화되고 있다. 그러나 개방형 평면유형과 주택가격과의 관계를 분석한 연구는 부족한 실정으로 본 연구는 개방형 평면 유형이 아파트 가격에 미치는 영향을 실증 분석하고자 한다. 이를 위해 개방형 평면유형과 베이수, 발코니비율, 공간 당 외부접면비율 등의 평면개방정도와 형태를 변수화하고, 2006년부터 2015년까지 120개월간 강남구에서 거래된 아파트 자료를 기반으로 헤도닉 가격모형과 인공신경망 모형을 통해 비교분석하였다. 분석결과, 베이수, 공간 당 외부접면 비율이 높을수록 아파트 가격은 상승하며, 개방형 평면 유형은 3면 개방형 평면, 직각 개방형 평면, 양면 개방형 평면, 1면 개방형 평면, 복합 개방형 평면 순으로 가격이 높은 것으로 나타났다. 이러한 연구결과는 향후 신축 및 재건축시 사업자가 평면설계에 있어 소비자의 선호를 반영하고 구매자의 경우에도 평면유형에 따른 가치파악을 위한 시사점을 제공할 수 있다.

공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 - (An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014)

  • 정우영;이태원;이풍욱;이강
    • 한국건설관리학회논문집
    • /
    • 제16권4호
    • /
    • pp.89-97
    • /
    • 2015
  • 실시설계도서의 품질은 시공, 그리고 운영 및 관리단계에도 큰 영향을 미친다. 그리고 적절한 실시설계기간의 확보는 실시설계도서의 품질을 위해 중요한 요소이다. 따라서 이 연구는 2009년부터 2014년까지 조달청 맞춤형 서비스를 통해 발주된 총 42개의 건설프로젝트의 실시설계단계의 기간을 분석하였다. 분석에 의하면, 실제 실시설계기간은 계획 실시설계기간보다 1.33배에서 1.79배가 소요되었다. 계획 실시설계기간은 건설교통부 제2000-235호에서 고시하고 있는 방식대로 공사금액에 의해 산정하고 있었지만, 실제 실시설계기간은 공사금액과 아주 낮은 상관관계를 보였다. 이 결과를 토대로 실무자들과 인터뷰를 진행하였고, 공사금액이 실시설계기간과 낮은 상관관계를 보인 것은 이들에게 아주 잘 알려진 사실이었다. 그들은 공사의 복잡도, 설계변경의 정도, 그리고 발주처의 성향에 따라서 실시설계기간이 크게 좌우된다는 점을 언급하였다. 따라서, 실시설계도서의 품질을 향상시키기 위해서는 다양한 요소들을 실시설계기간 산정에 적용하여 적절한 기간을 산정해야하며, 고품질의 실시설계도서는 건설산업에 긍정적 효과를 불러일으킬 것으로 보인다.