Research on the Actual Condition of Risk of Remodeling Project (리모델링사업 리스크 실태조사 연구)

  • Lee, Teck-Wn
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.6 no.3
    • /
    • pp.215-222
    • /
    • 2003
  • When constructing buildings, planning, design, construction, using & maintenance as building life cycle. Due to industrialization in 1960s and development of new town from the late 1980s to the early 1990s, Korean housing supply rate reaches almost 100%. After construction companies confronted limit of new building construction, they recognized remodeling as a part of construction, and organized remodeling team or FM team to improve sustainable industrial area. However, since companies in Korea are lack of experience and research activities for remodeling, it makes obstacle to improvement of remodeling business. So the objective of this study is to help carry out remodeling business by suggesting the counterplan through investigation of a risk of apartment remodeling business.

  • PDF

Environmental Cooperation Among East Asian Countries to Reduce Chinese Air Pollution (중국의 대기오염 배출 저감을 위한 한·중·일 에너지, 환경협력 방안)

  • Kim, Jeong-In
    • Environmental and Resource Economics Review
    • /
    • v.10 no.4
    • /
    • pp.591-617
    • /
    • 2001
  • For the past years, there had been some environmental cooperation among East Asian countries to reduce air pollution emissions from China. However, the progress of cooperation has been under developed because of lacking financial support, poor design of planning, and weak economic incentives for the industries. In this paper, some practical approaches have been suggested. First, electric trade to make Asian Grid among countries will be good alternatives for the fossil fuel, such as coal, for China. Secondly, natural gas pipeline from West China to Siberian pipeline would change the whole energy mix in this area around 2010, Therefore, it is very promising area for the energy industries to involve in gas project and get rid of many institutional barriers from China. Lastly, environmental industry is growing fast in East Asian. In China, waste treatment and management, air pollution control, and water quality management are some promising areas for the future. Hence it is desirable for Korea, Japan and China to make a eco-fund or company to boost up environmental technology as well as environmental market size.

  • PDF

Risk Assessment of Compressor Room for Next Generation LNG Carriers (차세대 LNG선 컴프레서룸의 위험성 해석)

  • Moon, Ki-Ho;Song, Seok-Lyong;Jeong, Sam-Heon;Ha, Jong-Phil
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2008.09a
    • /
    • pp.76-83
    • /
    • 2008
  • New and more efficient propulsion systems are required for LNG carriers. One of the proposed systems is a combination of a gas turbine with a heat recovery steam generator. This system constitutes a novel approach, which needs to be analyzed by system analysis and risk assessment to compensate for the lack of field experience. Of specific concern is the high pressure fuel supply system. This paper describes the dispersion and fire analysis performed to identify for safety and design improvement of proposed system.

  • PDF

Life Cycle Cost Breakdown Structure Development of Buildings through Delphi Analysis

  • Jeong, Jae-Hyuk;Shin, Han-Woo;Ryu, Han-Guk;Kim, Gwang-Hee;Kim, Tae-Hui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.5
    • /
    • pp.528-538
    • /
    • 2012
  • With domestic construction projects becoming bigger, more specialized and more advanced, the construction industry is striving to improve quality and quantity, and is diversifying functions and shapes. Nevertheless, the process of a construction project causes problems when we estimate construction price, because the cost breakdown structures are different in each step. The primary aim of this study was to estimate building life cycle cost using the Delphi method. The cost breakdown structure for life cycle cost was classified into planning, design, construction, maintenance and waste disposal, and each detailed classification was determined by estimating life cycle cost. Moreover, the developed cost breakdown structure is verified by consulting with experts to secure objectivity and validity.

Excavation and Building Damage Assessment - Fundamentals (지반굴착과 주변 구조물 손상평가 - 기본개념)

  • 유충식
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.263-270
    • /
    • 2002
  • During deep excavation, changes in the state of stress in the ground mass around the excavation and subsequent ground losses inevitably occur. These changes in the stress and ground losses are reflected on surrounding ground in the form of ground movements, which eventually Impose strains onto nearby structures through translation, rotation, distortion, and possibly damage. A substantial portion of the cost of deep excavations in urban environments is, therefore, devoted to prevent ground movements. Prediction of ground movements and assessment of the risk of damage to adjacent structures has become an essential part of the planning, design, and construction of a deep excavation project in the urban environments. This paper presents excavation-induced ground movement characteristics as well as important issues related to excavation-induced building damage assessment.

  • PDF

Application of BIM Elements for Owner's Decision - Making Support (발주자 참여 확대를 위한 BIM 적용요소에 관한 연구)

  • Lee, Kyung-Ha;Park, Jae-Hyun;Cho, Sung;Cho, Yong;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.185-188
    • /
    • 2009
  • Recently clients requirements and social requirements are complex and large sized in construction projects. Futhermore, processes and steps are more complexed than before. Unsuitable reflection of clients brings mistaken opinions. A phase of middle change makes delay and change. It brings problems of waste expense and time. 80, first stage of planning and schematic design processes have to reflect of clients opinion actively. by increasing of constructions project competitiveness. Recently, BIM(Building Information Modeling is being researched frequently. Through visualization of information proceed step by step and it helps cognition of adapting information. 80, this paper finds and suggests solution of reflecting clients opinion and requirements and non professional clients and positively support of client participation watching based on BIM.

  • PDF

Delay Factors in Building Construction Projects in Rwanda

  • Umuhoza, Esperance;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.467-475
    • /
    • 2019
  • Delay is one of the most critical issues for construction projects and leads to huge losses in both developing and industrialized countries. The construction sector in Rwanda, a rapidly-developing nation, is no exception. Delays can be mitigated only once we have identify their primary causes, and these may not be the same in each region. This study aims to ascertain the main critical factors responsible for delays in building construction in Rwanda through an intensive literature review and questionnaire survey. A total of 40 delay causative factors were obtained from a literature review and were further classified into nine major categories. The questionnaire survey was distributed to about 80 respondents from clients, contractors, and consultants. From the list of 40 different factors, the top twelve most critical causes were identified as stoppage of work due to cash flow constraints, delay in approving design documents, confidentiality of physical plan, price fluctuations and delay in approving significant change, change orders, delay in performing inspections, Ineffective project planning, inadequate drawing details, unqualified labor, lack of materials on the market and dishonesty.

A Study on the Surrealistic Characteristics in 'Delirious NewYork' - focused on Paranoid Critical Method ('광기의 뉴욕'에 나타난 초현실주의적 특성에 대한 연구 - 편집증적 분석 방법을 중심으로)

  • Chang, Yong-Soon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.2
    • /
    • pp.53-62
    • /
    • 2019
  • 'Delirious New York(1978)' of Rem Koolhaas is not only a historical book but a double code text writing the history of Manhattan in parallel to surrealism. Throughout this book, the surrealist terminologies such as unconsciousness, desire, paranoid, automatism, cadavre exquis etc, are widely used to explain the urban phenomena and buildings of Manhattan. Among these methods, in the fifth chapter, Paranoid critical method(PCM) invented by Salvador Deli, is explained in detail and adapted to Corbusier's project and other architects of Manhattan. Koolhaas connect PCM to the conceptual transposition and draft in architectural thinking. This thesis is to analyse the terms and methods of surrealism and how these methods are used to explain the urban phenomenon of Manhattan in 'Delirious New York'.

THE INTRODUCTION METHOD OF TECHNOLOGY MANAGEMENT IN THE OIL AND GAS PLANT INDUSTRY

  • Doo Hee Lee;Young Woong Song;Hyoung Chul Lim;Yoon Ki Choi
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.249-258
    • /
    • 2007
  • Recently orders of projects in the field of oil and gas plants have increased due to rising oil prices and consumption. The markets of oil and gas plants are expanding into the Middle East area and all over the world. Because the oil and gas markets have a lot of overseas construction operations, competition among advanced companies is more important. However, companies in the period of growth have not had enough competitive powers of license in the design phase. Therefore, they are faced with difficulty of adopting the technology which is maximizing the effect of investments, and scheduling of a long-range plan. In order to achieve adequate technology management and competitive power, this study considers a long-range plan through an analysis of an appropriate introduction and the strategic planning process of technology management.

  • PDF

SHIHMEN SEDIMENT PREVENTION DIVERSION TUNNEL PLANNING AND DESIGN

  • Ho-Shong Hou;Ming-Shun Lee;Percy Hou
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.168-172
    • /
    • 2009
  • Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.

  • PDF