• Title/Summary/Keyword: Design Project Planning

Search Result 591, Processing Time 0.023 seconds

An Analysis of Dwelling Environment of Public Retirement(Silver) Housing Based on Post Occupancy Evaluation (거주 후 평가(P.O.E)에 의한 공공실버주택의 거주환경 분석)

  • Bak, Da-Hye;Kim, Young-Hwa;Lee, Sang-Hong
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.12
    • /
    • pp.65-76
    • /
    • 2018
  • Due to the rapid demographic and structural changes, Korea has faced a variety of social issues and quickly entered the aged society since the 2000s. In order deal with this reality, diverse types of welfare policies are emerging in the society as a whole. The government began to supply domestic public silver housing in 2016 to provide against the quickly growing aged society and now, the government is planning to supply approximately 50,000 housing by 2022 for quantitative growth of aged society, by selecting 1st and 2nd designated areas for the project additionally. This public retirement(silver) housing combines 'space' with 'service'. The lower floors are a public silver welfare Facilities and the upper floors are a housing spaces. This type of housing is to deal with requirements of rental housing residents by combining physical space with supporting service. Based on barrier-free design, the complex and unit house have safety handles and alarm bells in the bathroom, undulating washstands, bathroom sliding doors, corridor safety handles, and emergency safety exit lamps in each housing unit so the aged and the disabled can use easily and conveniently. Also, hand rails are installed and stepped pulleys are removed to promote convenience. Currently, the government is planning to increase the supply, focusing on low-income groups, such as beneficiaries of national basic livelihood and the working poor. Recognizing that the public retirement(silver) housing project is at its early stage, this study examined satisfaction, based on evaluations of real residents. This study aimed to obtain more empirical research data and apply them to public retirement(silver) house space analysis. For analysis, this study targeted Wirye public retirement(silver) housing and Magnolia public retirement(silver) housing that are in operation, and literature review, previous research review, and field survey were conducted to examine the present state. Using the questionnaires consisting of four large classification items; Block Layout, Housing Unit, Welfare Facilities, and Barrier-free Design, and sub-details, a survey was conducted to analyze residents' satisfaction. In conclusion, it is anticipated that this study would serve as basic research data about public retirement(silver) housing to increase continuously in future by analyzing public retirement(silver) housing spaces, on the basis of the analyzed data.

A development of the Process Capturing and Sharing System for an Effective Collaborative Design (협동설계 효율화를 위한 설계순서작성 및 공유시스템 개발)

  • Han, Jin-Teck;Lee, Soo-Hong;Park, Sam-Jin
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.16 no.10
    • /
    • pp.68-79
    • /
    • 1999
  • This paper describes an approach to collaborative design which focuses on the effects of individual activities on the overall design process. We utilize a new process modeling tool to define the process and then analyze and refine the process based on critical paths. This information is then shared over the Internet with all participants. The goal of this system is to detect critical errors at initial design stage and guide the designers to make better decisions based on the knowledge of the overall process. This system enables participating designers to publish his local process through an Internet bulletin board. Other members of the team can then provide feedback based on how the proposed process impacts their activities. The system provides a context-rich, persistent forum for collecting, preserving, and refining corporate expertise of the team. For example, designers can select any process from the bulletin board and use it as a template for his current project and then use it to maintain his own design history. This paper is based on the process modeling concepts of Design Roadamap and describe several key extensions in the area of CPM calculations and collaborative interfaces.

  • PDF

Evaluation of system design modifications for full system decontamination of Kori Unit 1

  • Kim, HakSoo;Kim, JeongJu;Kim, ChoRong
    • Nuclear Engineering and Technology
    • /
    • v.54 no.10
    • /
    • pp.3949-3956
    • /
    • 2022
  • Kori Unit 1 is planning a system decontamination project to reduce radiation exposure of decommissioning workers, prevent the spread of contamination and down-grade the level of classification of radioactive waste. The system decontamination range for Kori Unit 1 will be the entire primary system, including RCS, CVCS and RHRS. Some system design modifications are required for the system decontamination operation. In this paper, major system design modifications were evaluated based on the conditions that system restoration is needed after completion of system decontamination. The major system design modifications are CIDF connection location to system, system decontamination operating pressure control, RCP seal water injection and formation of letdown flow. It was evaluated that there was no negative effect on the system due to the system design modifications. However, as the RCP seal water is injected into the system in the oxidation process, the concentration of the oxidizing agent is diluted. Therefore, the oxidizing agent injection and system decontamination operation procedures should be developed to address the dilution effect of the oxidizing agent. The system design modifications dealt in this paper will be finally confirmed through on-site investigation in the future, and if necessary, the system design modifications will be re-evaluated.

The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis (댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구)

  • Yoon, Jae-Ho;Moon, Young-Il
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.715-724
    • /
    • 2003
  • It is true that SOC facilities, such as dams, need long life cycles since more time has to be invested for the phases of planning, examination, feasibility study, design, contract, construction, and maintenance. This longer life cycle is easily exposed to the risk. And thus, brings additional cost by the delayed project, convenient loss according to the additional run of use, and benefit lose of not to using the facilities. So, the purpose of this study is to try to find a solution to reduce these time consuming problems which could diminish the whole national competition. Hence, this study is to show efficient, systematical project performance and network model by using reciprocal analyses between the construction period and cost based on economical analysis of each phase of life cycles. In addition, on the basis of these outputs, the Fast Track Method is suggested as an alternative solution as a new Approach in Life Cycle's Analysis.

A Journey to Action Research in a Clinical Nursing Context (임상간호현장에서의 실행연구 여정)

  • Jang, Keum Seong;Kim, Heeyoung;Kim, Eun A;Kim, Yun Min;Moon, Jeong Eun;Park, Hyunyoung;Song, Mi-Ok;Baek, Myeong
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.19 no.1
    • /
    • pp.95-107
    • /
    • 2013
  • Purpose: The purpose of this study was to examine the effectiveness of Action Research (AR) approach in nursing. Methods: Participants were 64 perioperative nurses recruited from C hospital in Gwangju, Korea. The nurses were engaged in the project through 2 cycles of planning, acting, observing, and reflecting. A mixed-methods design was used to examine changes in participants and their knowledge management practice. Quantitative data were analyzed using SPSS 20.0 program and qualitative reflection data underwent content analysis. Results: During the project, participants developed standardized pre-operative checklists and opened an Internet Cafe to better manage their perioperative nursing information. At the end of the project, there was a significant increase in nurses' knowledge management (p=.015) and the rate of surgical material prescription errors decreased from 8.0% to 2.9%. Core AR project team members' teamwork skills and organizational commitment increased significantly (p=.040, p=.301, respectively). The main themes that emerged from the qualitative data were learning how to solve problems in practice, facilitating team activities through motivation, barriers of large participation, and rewarded efforts and inflated expectations. Conclusion: The AR project contributed to empowering participants to solve local problems. AR is a useful methodology to promote changes in practices and research participants.

A Sensitivity Analysis for Risk Management of Private Investment Projects - Focused on BTL Projects - (민자유치사업의 리스크 관리를 위한 민감요인 분석 - BTL 사업을 중심으로 -)

  • Kim, Sun-Kuk;Park, Tong-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.168-175
    • /
    • 2006
  • Since the partly changed 'Private Investment Act for Social Infrastructure Projects' set forth in January 2005, the number of BTL(Build-Transfer-Lease) projects offered to the market has rapidly increased. The scope of BTL projects offered covers not only legally defined facilities but several facilities for the private schools. A BTL project, by definition, is a way of project management that includes the entire process of development such as planning, design, construction and operation over the period of 20-30 years. As a result, various types of risk may happen at each stage of the project and it is extremely important to efficiently control the sensitive factors that affect the risk profiles of the project. The examples of the sensitive factors are construction cost, interest rate, discount rate, lease amount, rental fee, O&M cost and so on. This study examines the characteristics of these sensitivity factors, analyzes their impact on the project feasibility and suggests the alternatives to manage them efficiently.

Development and implementation of a project-based learning model using CMC and situated evaluation with message analysis (통신망을 활용한 프로젝트 학습 모형의 개발 및 적용과 메시지 분석을 이용한 상황적 평가)

  • Jun, Youngcook;Kim, Junghack;Park, Hongjune
    • The Journal of Korean Association of Computer Education
    • /
    • v.8 no.4
    • /
    • pp.57-69
    • /
    • 2005
  • In this study we try to design and develop a mixed model of project-based learning with internet. In order to support the developed model, we separately developed a web-based tool, called Project Learning BBS. The classroom teaching for advertisement-photo production with the model has been carried out during May-July in 2002 and March-July in 2003 respectively with 40 students each. The overall activities of group collaborative work done during the teaching periods have been formatively evaluated with classroom observation, interviews and students' portfolios that were related to the processes of photo planning, video shooting and editing. It has also investigated how the students involved the web-based group discussion activities. In short, data analysis indicated that the participants accepted the proposed project-based learning model for their learning events in a positive way in order to increase the utilization of CMC.

  • PDF

Development of USLExls and its Application for the Analysis of the Impact of Soil-Filling Work on Soil Loss (USLExls를 이용한 복토법에 따른 필지 단위 토양유실량 분석)

  • Kim, Sorae;Yu, Chan;Lee, Sang-Whan;Ji, Won-Hyun;Jang, Min-Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.6
    • /
    • pp.109-125
    • /
    • 2017
  • This study aimed to develop a parcel-unit soil loss estimation tool embedded in Excel worksheet, USLExls, required for the design of contaminated farmland restoration project and to analyze the impact of the project carried out soil-filling work on soil loss. USLE method was adopted for the estimation of average annual soil loss in a parcel unit, and each erosivity factor in the USLE equation was defined through the review of previous studies. USLExls was implemented to allow an engineer to try out different combinations just by selecting one among the popular formulas by each factor at a combo box and to simply update parameters by using look-up tables. This study applied it to the estimation of soil loss before and after soil-filling work at Dong-a project area. The average annual soil loss after the project increased by about 2.4 times than before on average, and about 60 % of 291 parcels shifted to worse classes under the classification criteria proposed by Kwak (2005). Although average farmland steepness was lower thanks to land grading work, the soil loss increased because the inappropriate texture of the cover soil induced the soil erosion factor K to increase from 0.33 before to 0.78 after the soil-filling work. The results showed that the selection of cover soil for soil-filling work should be carefully considered in terms soil loss control and the estimation of change in soil loss should be mandatory in planning a contaminated farmland restoration project.

Advanced Work Packaging (AWP) in Practice: Variables for Theory and Implementation

  • Jung, Youngsoo;Jeong, Yeheun;Lee, Yunsub;Kang, Seunghee;Shin, Younghwan;Kim, Youngtae
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.201-206
    • /
    • 2020
  • Diversification of project delivery methods (PDM) under ever-changing construction business environment has significantly changed the role of project participants. Active efforts to effectively sharing the roles and responsibilities have been observed in the project management offices (PMOs) among owner/operator organizations as well as engineering, procurement, construction and maintenance (EPCM) firms. In order for being effective in a holistic way throughout the project life-cycle, a PMO needs to have 'adequate management skills' as well as 'essential technical capabilities' in cooperating with many different participants. One of the well-known examples of the PMO's tool to support these skills and capabilities is the effective 'work packaging (WP)' that serves as a common basis integrating all relevant information in a structured manner. In an attempt to enhance the construction productivity, the concept of 'advanced work packing (AWP)' has been introduced by Construction Industry Institute (CII). The AWP enables productivity to be improved by early planning of construction packages in the design phase "with the end in mind". The purpose of this study is to identify and evaluate the 'variables' of advanced work packing (AWP) for life-cycle information integration. Firstly, an extended concept of advanced WP based on the CII AWP was defined in order to comprehend many different issues of business functions (e.g. cost, schedule, quality, etc.). A structured list of major components and variables of AWP were then identified and examined for practical viability with real-world examples. Strategic fits and managerial effectiveness were stressed throughout the analyses. Findings, implications and lessons learned are briefly discussed as well.

  • PDF

Method to Use the Augmented Reality for Construction Planning and Management

  • Nam, Keong-Woo;Kang, Chulung;Jang, Myunghoun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1067-1074
    • /
    • 2022
  • An architect creates his/her design to meet owner's requirements. Floor plans, perspective drawings, and scale models are used in order for the owner to choose the design. The tools are a little helpful for communication between the architect and the owner in case the owner does not know architecture. The scale models are good, but it is hard to make scale models while design is in progress. 3D CAD is a good tool for communication, but it is time-consuming and requires high-performance computer hardware. Augmented reality is able to show 3D virtual models that are updated by the architect with smart devices such as a smart phone and a tablet PC. The owner frequently reviews the updated design anytime anywhere. This study proposes a method to use augmented reality for architectural design and construction management. The method supports the communication between the owner, the architect and the contractor to review updated designs, and to complete the building project. 3D models expressed in augmented reality are created using SketchUp with 2D drawings for building construction. An Android application implementing augmented reality is developed by Qualcomm Vuforia and Unity on smart devices. Drawings as markers and 3D models are connected in Unity. And functions that temporarily hide unnecessary parts can be implemented in C# programming language. If an owner, an architect, or a contractor looks at a smart phone on a 2D drawing, he/she can identify building elements such as 3D buildings or columns on a screen. This can help communication between them.

  • PDF