A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

Merits and Demerits of the Inspection System introduced in Construction of City Planning Road: In Case of Crossing Road of the Aioiyama Green Area in Nagoya

  • Yutaka Okamura
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.178-184
    • /
    • 2004
  • The Yatomi - Aioiyama line is a city-planning road that was notified in 1957 and subsequently prepared by land readjustments. Currently, approximately 900m of road pass in the inside of the Aioiyama green area has not been constructed. The surveying briefing session for inhabitants was held in July 1992, the project was authorized by the Ministry of Land, Infrastructure and Transport in September 1993, and the project briefing session for inhabitants was held in September 1993. The site purchase has been completed. At the May 2000 briefing session, inhabitants of the area began voicing dissenting demanding the conservation of the natural environment of this green area. The inspector system serves as the third party, independent of both the administration and the inhabitants. Before finalizing the geometric line form of the road to be constructed, some surveys of animals and plants found along the walking trails carried out intensively in the northern area, which is approximately 50 ha, of the Aioiyama green area. The natural environment inspector submitted a plan for changing the geometric line form of the road decided upon by city planning, and it was approved by the city planning council. If the shelter structure or the retaining wall structure is adopted at the location where large slope faces are produced by excavation or landfill, and if the bridge structure is adopted at the place where stream-lines and walking trails intersect, it leads to a reduction of approximately $40\%$ in the areas for which change is planned. Furthermore, approximately $20\%$ of the area to be changed is restored by returning soil to the roof of the shelter.

  • PDF

Demonstration of Propulsion System for Microsatellite Based on Hydrogen Peroxide in SOHLA-2L Project

  • Sahara, Hironori
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.03a
    • /
    • pp.235-242
    • /
    • 2008
  • An innovative Panel ExTension SATellite(PETSAT) and propulsion system for PETSAT, are presented in this paper. First, we outline what PETSAT is. Next, based on PETSAT ethos, design policy of the propulsion system is provided. According to the policy, we designed propulsion system and concretely estimated and assembled mono-propellant and bi-propellant systems, and it indicated that mono-propellant propulsion with 50-60 seconds of specific impulse and 1 N of thrust is probable. In the case of bi-propellant, 120-150 seconds of specific impulse is valid even based on the design policy. We conducted captive tests of mono-propellant and bi-propellant propulsions with a breadboard model of propulsion system for PETSAT, and obtained good operations and performances. Based on the test results, we designed and manufactured flight model propulsion system for PETSAT. We are planning to demonstrate it in SOHLA-2L project progressed by the Space Oriented Higashiosaka Leading Association(SOHLA). SOHLA-2L will be the first on-orbit demonstrator of PETSAT in 2008.

  • PDF

An Earthwork Districting Model for Large Construction Projects (단지공사의 토공구획 계획 모델)

  • Baek, Hyeon Gi;Kang, Sang Hyeok;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.715-723
    • /
    • 2015
  • Earthwork in a large construction project such as a land development generally costs 20-30% of the total cost. The earthmoving process, comprising of four repetitive tasks: loading, hauling, unloading, returning, is quite simple and it does not need delicate or advanced techniques. Therefore, earthmoving earthwork planning can heavily affect the cost and time., and Even a slight deviation from the plan can increase or decrease the cost and time. This study presents a planning model that minimizes average haul distance in a large complex construction project. Based on earthwork planning, practitioners' heuristics, a districting algorithm and Simulated Annealing algorithm were employed to build the model. Districting algorithm plays a role that divides in dividing an earthmoving area into several sections. Simulated annealing provides a function that decides whether a new generated solution is confident. Finally, the proposed model was applied to a real earthmoving project of a large land development. It was found that the model showed approximately 14% improvement in average hauling distance compared to the actual design plan.

Development of An Internet-Based Tunnel Construction Risk Management System (Internet 기반의 터널 시공 위험도 관리 시스템 개발)

  • 유충식;김재훈;박영진;유정훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.679-686
    • /
    • 2002
  • A substantial portion of the cost of a tunnelling project in urban environments is, therefore, devoted to prevent ground movement. Therefore, prediction of ground movements and assessment of risk of damage to adjacent buildings has become an essential part of the planning, design, and construction of a tunnelling project in the urban environments. An internet-based tunnelling-induced ground movements and building damage assessment system (IT-TURIMS) was developed and implemented to Daegu Metro Subway Line tunnel construction project in Korea. This paper describes the concept and implementation of IT-TURIMS. Practical significance of tunnelling risk assessment is also discussed.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

A Study on the Planning Characteristics of Ecological City - A Case Study of HafenCity, Hamburg - (생태도시 구축을 위한 계획 특성에 관한 연구 - 독일 함부르크 하펜시티 사례를 중심으로 -)

  • Park, Jong Ki;Chin, Kyung Il
    • KIEAE Journal
    • /
    • v.12 no.4
    • /
    • pp.3-12
    • /
    • 2012
  • Nowadays, interests on Eco-city planning as Solution for problems of energy demand and environmental change has grown. so Eco-city planning became a major political topic for urban planning and urban design in many advanced nation cities. The purpose of this study is to find out the organized characteristics of Eco-City planning by analyzing successful overseas case where wasted historic port area in city is are regenerated with a environment-friendly concept for Eco-City "HafenCity". It is located on Hamburg-mitte in Hamburg, Germany and is currently the largest construction project in Europe. HafenCity as Home to about 12,000 and the workplace of 40,000 people is being created to accommodate a variety of uses including residential buildings, business, office and retail space as well as cultural and leisure facilities. First of all, HafenCity impresses because of its size as well as because of its Urban planning for eco-city. It presents the excellent change from wasted historic port to the ecological urban space.

A Study on the Planning of Indoor Environment Factors for Sustainable School Facility (지속가능한 학교시설을 위한 실내환경 계획 요소에 관한 연구)

  • Shin, Dong-Sik;Lee, Jong-Kuk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.10 no.1
    • /
    • pp.34-41
    • /
    • 2011
  • Global environment is getting deteriorated at an alarming rate. Eco-school could be one of the effective solutions to project our environment and a good sample of architecture to economize in total energies, resources and greenhouse gases. In case of our country, the study of eco-school planning is not sufficient compared with other countries, so this paper would be a good study on the indoor environment of the classroom by surveying their opinions and ideas from the group of users in school facility. The result of this study shows that the proper installation of building equipment and nature ventilation system is necessary to provide delightful environment for the students and to save the energy. To ensure that we have adequate saving and protection it is necessary to change the existing appraisal standard.

Review Study on the Selection of Oversea Railway Alignment (해외철도 노선선정 사례의 검토)

  • Choi, Byoung-Pyo;Kim, Goon-Soo;Kwaun, Young-Chul;Kim, Dong-Ki;Cho, Hee-Su
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.402-406
    • /
    • 2006
  • There are two types of railway alignment design. First type is a modification of existing railway and second type is a planning of whole new alignment. Modification of existing railway would be more simpler, usually, main scope is improving a capacity with adopting standard track gauge, straighten intensively curved part. But planning new alignment should be considered various factors, not only topographic feature, but cultural, socio-economical, environmental factors. This paper is based on the performed project in the United Arab Emirates, the Arabian Peninsular, with Korea railroad corporation, Korea Rail Network Authority, and other skilled Korean design firms participated on May, 2006.