• Title/Summary/Keyword: Design Project Planning

Search Result 584, Processing Time 0.028 seconds

A Study on the Interior Design Planning for Children Cultural Complex (어린이 복합문화공간 실내계획에 관한 연구)

  • So, Ah-Lum;Mo, Jeong-Hyun
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.11a
    • /
    • pp.245-250
    • /
    • 2009
  • A variety of change in modern society has affected a family structure. In addition birth rate is getting lower and nuclear family type is getting common, influence of children has highly increased. According to this phenomenon, needs and concern about education and culture for children increase sharply. Children cultural complex can be learning field, which helps children not only to rediscover the world by themselves but also to have various and abundant experience. The purpose of this study is going to extract a planning factor of the children cultural complex through case studies of korean and oversea project for adaptable children cultural complex. In addition, this study tries to analyze the features of the children cultural complex in korean and oversea. Consequently, The analysis result is to be introduced party room to children cultural complex, used the PVC tile and carpet tile for safety of children and variety, and executed program relevant to nature.

  • PDF

A Trial of Evacuation Route Planning Based on Genetic Algorithm for Dealing with Real-World Problem

  • Wakuya, Hiroshi;Katsumoto, Ryoma;Itoh, Hideaki;Mishima, Nobuo;Oh, Sang-Hoon;Oh, Yong-Sun
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2016.05a
    • /
    • pp.243-244
    • /
    • 2016
  • From the viewpoint of ICT-based disaster prevention design, evacuation route planning is one of the hot topics to be solved. Since we have quite a lot of natural disasters these days, its role has become important more and more than before. In order to deal with this tough problem, a genetic algorithm (GA) is adopted, and a revised selection procedure for preserving variety of individuals in each generation is introduced. As a result of some computer simulations applied to Hizen-Hamashuku, one of the model areas in this research project, it is found that the proposed method is effective.

  • PDF

The global standard realizing process of the Tire Production Facility and Process Line

  • Suzuki, Takeshi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.28-29
    • /
    • 2015
  • The tire production facility is a large-scale construction with the complexity of a manufacturing process. The process utilities should be wide-ranging as an effective arrangement of them is highly important. All the necessary information should be clarified together with the manufacturer at the basic planning stage, and this design should be developed to comply with the local culture and regulations. It is important to carry out more advanced engineering in terms of process, cost and quality, even if it is difficult to standardize due to the cultural and geographical conditions and regulations. The key point is to reflect all the given conditions and make a clear design during the design stage, to eliminate the problems after the construction has begun. Another key point is the delivery system, which must be totally managed from the initial design stage until the construction stage by proven companies. Flexibility, quick action, and single responsibility will be the fundamental features in all the steps of the project.

  • PDF

Review on Rural Development Project in the United States and Its Application to Korea : Main Street Program (미국의 농촌개발사업 고찰과 시사점 - 메인 스트리트 프로그램을 중심으로 -)

  • Hwang, Han-Cheol
    • Journal of Korean Society of Rural Planning
    • /
    • v.15 no.4
    • /
    • pp.147-160
    • /
    • 2009
  • In 1977, the Main Street Program(MSP) of the United States was founded by the National Trust for Historic Preservation to revitalize downtowns which suffered major declines in their economy and population. This study analyzed the methodology of MSP such as the Four-Point Approach and the Eight Principles, history of MSP, local program organizational structure, local program budgets and funding, official designation and so on. Three successful cases were discussed the background of an introduction to MSP, implementations, results and revitalization statistics. To be able to apply rural development projects in Korea, this study showed the implications such as the need for a program's ethic and methodology, a strong public-private partnership, a dedicated organization, a full-time professional program manager, a commitment to good design and comprehensive work plan, and an educational program of ongoing training for staff, volunteers and other residents.

The Development of a Standardized Work Process for Planning of Plant Project - Focus on Excavating and Investing Participation Plan - (플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로 -)

  • Lee, Do-yun;Choi, Chang-Hoon;Won, Seo-kyung;Cho, Moon-Young;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.3-11
    • /
    • 2016
  • Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.

"Standard Model" approach to building projects in the UK and potential role of project team to mitigate any local difference~from international developer's perspective

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.425-432
    • /
    • 2020
  • In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.

  • PDF

Case Study of Opinion Coordination between Residents and Coordinators on the Planning Process of Community Housing in Sungmisan Village (성미산마을 공동체주거 계획과정의 거주자와 코디네이터의 의견조정 사례연구)

  • Park, Kyoung-Ok;Ryu, Hyun-Soo
    • Journal of the Korean housing association
    • /
    • v.23 no.3
    • /
    • pp.1-11
    • /
    • 2012
  • The purpose of this study was to make clear considerations in the planning of community housing and the roles of coordinators. Seongmisan village, a representative urban community village in Seoul, was selected for this study on problem solving between residents and opinion coordination between residents and coordinators. For this qualitative research, 2 residents and 2 coordinators answered 'open questionnaires' on prior basic planning, land purchase, financing, architectural planning, construction and inspection, and actual living conditions thereafter. They were each interviewed for 2 hours at a time that was 14-16 months after the residents started living in the new houses, and the records were transcribed. The following was the result. 1) The residents, who ruled the steps of prior basic planning and land purchase, did not have sufficient information or knowledge of the construction of community housing, so that they faced difficulties especially in the legal and financial aspects. 2) The coordinators participated in the project at the steps of architectural planning and construction. The residents accepted the coordinators' opinions on the choice of floor and position, and the coordinators listened to the residents' opinions on individual plans and finishing materials. In the construction step, however, there was conflict between them, and dissatisfaction occurred on the completion time and construction cost. For the successful construction of community housing, a professional coordination company needs to join the project to establish a system of opinion coordinating from the step of prior basic planning to the step of afterconstruction management.

Development of a decision framework for the designing and implementation of a sustainable underground water storage system

  • Gladden, Lennox Alexander;Park, Namsik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.244-244
    • /
    • 2015
  • Managed Aquifer Recharge (MAR) in the form of Aquifer Storage and Recovery (ASR) systems are being applied for numerous water augmentation projects both in developed and developing countries. Given the onset of Climate Change and its influence on weather patterns and land use, it has been acknowledged the utilization of this technology will be ever increasing. This technique like all others does have its drawbacks or disadvantages, whereby to overcome these drawbacks or disadvantages it is recommended that logical planning process be followed. In this study, we developed a decision framework known as "Decision framework for the planning, designing, construction/testing and implementation of subsurface water storage system" to further standardize the planning and design process of subsurface water storage system to increase the probability of having a successful ASR/ASTR project. The formulation of this framework was based on earlier frameworks, guidelines, published papers and technical reports which were compiled into a data collection database. The database of which consider both qualitative and quantitative aspect for example recharge objectives, site location, water chemistry of the native, source and recovered water, aquifer characteristics(hydraulic conductivity, transmissivity, porosity), injection/pumping rate, ecological constraints, societal restrictions, regulatory restrictions etc. The assimilation of these factors into a singular framework will benefit the broad spectrum of stakeholder as it maps the chronological order under which ASR project should be undertaken highlighting at each stage the feasibility of the project. The final stage of which should result in fully operational ASR system. The framework was applied to two case studies and through the application of a modified ASR site selection suitability index (Brown et al., 2005) a score was derived to identify the performance of each site. A high score of which meant a maximize chance of success given the reduce presence of project constraints.

  • PDF